FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/ROAD/42949/2019   (ii). Name of Project for which Forest Land is required : Construction of link road from Naldehra to Odu km. 0/0 to 2/745   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The Himachal Pradesh Government has proposed to be Construction of link road from Naldehra to Odu km. 0/0 to 2/745 which start from Nahdehra. The total length of proposed alignment is 2.745 kms with average width of 5.50 meter. The whole length of the road will passes through forest land. Excavated   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 128.88   (viii). Area of forest land proposed for diversion(in ha.): 2.1075   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : HIMACHAL PRADESH PUBLIC WORK DEPARTMENT   (ii). Address1 : Engineer-in-Chief HPPWD Nirman Bhawan Nigam Vihar Shimla   (iii). Address2 : Engineer-in-Chief HPPWD Nirman Bhawan Nigam Vihar Shimla   (iv). State : Himachal Pradesh   (v). District : Shimla   (vi). Pin : 171002   (vii). Landmarks : Near Police Head Quarter   (viii). Email address : ee-sml1-hp@nic.in   (ix). Landline Telephone No. : 2621401   (x). Fax No. : 177   (xi). Mobile No. : 9418463331   (xii). Website (if any) : www.hppwd.gov.in   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
  (xiv). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Ayub   (ii). Middle Name: NIL   (iii). Last Name: Chaudhary   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: HPPWD Division No 1 Shimla 171003   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Shimla   (x). Tehsil: Shimla Urban(T)   (xi). Pin: 171003   (xii). Landmarks: NIL   (xiii). Email Address: ee-sml1-hp@nic.in   (xiv). Landline Telephone No.: 2658385   (xv). Fax No.: NIL   (xvi). Mobile No.: 9418463331   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : No
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Shimla(shimla)2.10750
Total2.10750
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Shimla2.10750
Total2.10750
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Jangal Naldehra2.0520
2Naldehra0.05550
2.1075 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road1.70250
2Dumping0.4050
Total 2.1075 0
C. Maps of forest land proposed to be diverted
Division 1. : Shimla(shimla)
  (i). Area of forest land proposed to be diverted(in ha.) : 2.1075   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : One
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.2.1075    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 13000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: NIL   (iii) . Reason for not providing Non-Forest Land: Central Govt. Project
Additional information Details
Documents
S.No Documents
Remarks
1Administrative Approval
2All FCA Documents in one PDF
3detaled estimate
4check list no.6
5ca undertaking
6npv undertaking
7minimum use of forest land
8PART-1
9JOINT INSPECTION
10Breakup
11Non-Availability of Non-Forest Land Certificate
12Length and Width Detail
13Distance Certificate
14List of Habitation to be benefited
15Ecological Restoration Plan
16Justification for connecting odu village, affecting dense and mature deodar forests
17Muck Management Plan
18Reclamation Plan
19Statement showing the details of Non Forest Land involve in the project
20Village Benefit Certificate
21Reply of Point No. 1 (Kindly refer to your office letter no. RK/FCA/Naldehra to Odu / 1006 dated 23-05-2023)
22Layout plan with legend and the proper dimensions of each component such as Carriageway, Paved Shoulder, Earth Filling, Drain, and Protection Work, as well as an area-wise calculation
23Trees Enumeration list of the 2nd Alternate Alignment
24Site Inspection done by the Conservator of Forest on dated 22.09.2022
25Reply to the observation raised by Regional Officer and forwarded by DFO vide Letter no. RK/FCA/Naldehra to Odu / 2905 dated 05-08-2023
26Reply to the Observations dated 24.05.2023
27Reply to the observations raised by the Integrated Regional Office vide letter no. FC/HPB/06/33/2021 dated 22nd December 2023