Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/ROAD/156128/2022   (ii). Name of Project for which Forest Land is required : Rehabilitation and Upgrading of Existing Road to 4 Lane with Paved Shoulder from Kolaka to Nauni Chowk (Kolaka to Dareota Village-Pkg IIA, Dareota Village to Daseharan Village-Pkg IIB & Daseharan Village to Nauni Chowk-Pkg IIC) of NH 205 [Design Chainage – Km 28+800 to Km 58+450, Design Length – 29.65 Km] in the State of Himachal Pradesh   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The Project Road under Package II involves three construction packages namely Pkg IIA, Pkg IIB and Pkg IIC for ease of implementation. The design length of the project road is 29.65 Km and it passes through Solan and Bilaspur District.   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 183486   (viii). Area of forest land proposed for diversion(in ha.): 33.8599   (ix). Non-forest land required for this project(in ha.): 98.7676   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : National Highways Authority of India   (ii). Address1 : G-5 & 6, Sector-10, Dwarka, New DElhi-110075   (iii). Address2 : G-5 & 6, Sector-10, Dwarka, New DElhi-110075   (iv). State : Delhi   (v). District : South West   (vi). Pin : 110075   (vii). Landmarks : G-5 & 6,Sec-10   (viii). Email address : piuhamirpur@nhai.org   (ix). Landline Telephone No. : 25074200   (x). Fax No. : 25093543   (xi). Mobile No. : 8376900598   (xii). Website (if any) : www.nhai.org   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
  (xiv). Legal status of User Agency : Central Government
A-3. Details of Person Making Application
  (i). First Name: Vikram   (ii). Middle Name: Singh   (iii). Last Name: Meena   (iv). Gender: Male   (v). Designation: Project Director   (vi). Address 1: NATIONAL HIGHWAYS AUTHORITY OF INDIA   (vii). Address 2: PROJECT IMPLEMENTATION UNIT - HAMIRPUR, HOUSE NO.-218A, KANWAL COMPLEX, WARD NO.-1, KRISHNA NAGAR, HAMIRPUR   (viii). State: Himachal Pradesh   (ix). District: Hamirpur   (x). Tehsil: NIL   (xi). Pin: 171001   (xii). Landmarks: PAKABAROH CHOWK   (xiii). Email Address: piuhamirpur@nhai.org   (xiv). Landline Telephone No.: 223794   (xv). Fax No.: NIL   (xvi). Mobile No.: 8376900598   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : No
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kunihar16.51360.0993
2.Bilaspur17.346938.6683
Total33.859998.7676
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Solan16.51360.0993
2.Bilaspur17.346938.6683
Total33.859998.7676
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Kolaka (66)00.8832
2Sari (160)0.10752.9843
3Dareota (299)2.07660.2529
4Ghial Khech (301)0.02540.709
5Surajpur (306)0.10951.7863
6Sosai (308)0.0612.0234
7Jungle Shalan (307)0.97330
8Banan (309)2.17623.2506
9Baihal (281)0.44542.799
10Batehr (280)0.17022.103
11Palyani (267)0.18171.8754
12Mayana (266)0.14891.8516
13Dhundan (268)0.21743.4385
14Syari (257)0.68132.0621
15Lalhana (258)0.10490.7532
16Daseran Bala (259)0.78122.344
17Kalar Bala (248)0.07931.0541
18Harda (249)0.45940.2232
19Kund (254)0.90280.2601
20Dinan (253)0.16682.2957
21Thach (242)0.43870.698
22Kiard (245)0.34812.0299
23Nalag (244)0.13851.6228
24Namhol (13)1.20.5897
25Sakrehar (12)0.12191.3001
26Ghayal (11)0.25112.3607
27Sosan (27)00.623
28Khalota (28)0.8412.3832
29Bag Khurd (29)0.0412.6274
30Dagsech (30)1.86524.085
31Nihar Khad Vasla (32)1.74013.5089
32Syohala (35)3.16571.0255
33Sangrithi (236)0.6680.1043
34Rajpura (235)2.89482.7908
35Noa (234)01.5144
36Changar Palasiyan (231)0.92162.1032
37Gawahan (230)00.3606
38Parangal (229)0.32341.3966
39Sari (160)_Tunnel1.47291.5041
40Kavag (159)_Tunnel00.0011
41Sherpur (158)_Tunnel00.0459
42Ghanagu (160)_Tunnel0.04663.5277
43Kalharan (162)_Tunnel0.07990.6626
44Dhyanpur (164)_Tunnel0.00260.0058
45Kunhi (163)_Tunnel2.34522.4165
46Simun (298)_Tunnel0.89610
47Raheveta (300)_Tunnel00.478
48Dareota (299)_Tunnel0.34630
49Sosai (308)_Tunnel0.00230.4189
50Jungle Shalan (307)_Tunnel0.46040
51Kolaka (66)_Muck Dumping07.2112
52Dareota (299)_Muck Dumping01.5478
53Ghial khech (301)_Muck Dumping00.9756
54Bagi (302)_Muck Dumping03.2141
55Khali (144)_Muck Dumping02.0035
56Syohala (35)_Muck Dumping2.11750
57Sangrithi (236)_Muck Dumping0.57820
58Rajpura (235)_Muck Dumping0.61740
59Kotla (311)0.06663.7573
33.8599 91.8438
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road24.894565.6857
2Muck Dumping Site3.313114.9522
3Tunnel5.65239.0606
4Way Side Amenities02.1453
Total 33.8599 91.8438
C. Maps of forest land proposed to be diverted
Division 1. : Kunihar
  (i). Area of forest land proposed to be diverted(in ha.) : 16.513   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : One
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.16.513    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
Division 2. : Bilaspur
  (i). Area of forest land proposed to be diverted(in ha.) : 17.3469   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : One
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.17.3469    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: The project road is widening of existing NH 205.
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 100   (iii). Temporary Employment(Number of person-days): 1277500
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: Yes   (a). Total Number of families : 237   (b). Number of Scheduled Caste families : 14   (c). Number of Schedule Tribes families : NIL   (d). Number of other families : 223   (ii). Copy of Rehabilitation and Resettlement Plan: No Data   (a). Copy of approval to Ministry of Tribal Affairs,Government of India to Rehabilitation and Resettlement: No Data
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: NIL   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: NIL   (iii) . Reason for not providing Non-Forest Land: NIL
Additional information Details
Documents
S.No Documents
Remarks
1Compliance to Point No.5-ESZ distance certificate issued by DCF(WL) Shimla
2The joint inspection date was scheduled on 16.03.2022 and the joint visit carried out successfully.
3CA Undertaking
4NPV Undertaking
5Additional NPV Undertaking
6Joint Inspection Report-Kunihar Division
7Khunihar DFO Revised hardcopy Submission letter
8DFO Bilaspur Compliance Submission letter 02.03.2024
9FRA Undertaking
10Joint Inspection Report-Bilaspur Division
11Bilaspur Division Hardcopy Submission
12Revised DGPS Maps for Bilaspur Forest Division
13DGPS Maps for Kunihar Forest Division
14Revised Forest Area Statement for Bilaspur Forest Division
15Revised Non Forest Area Statement for Bilaspur Forest Division
16Forest Area Statement for Kunihar Forest Division
17Revised Non Forest Area Statement for Kunihar Forest Division
18Joint inspection report dated 16.08.2024 for revised forest area requirement in Bilaspur Forest Division.
19NAC for NF Land, Solan District
20NAC for NF Land, Bilaspur District
21Digital Map for Bilaspur Forest Division
22Digital Map for Kunihar Forest Division
23Revised Strip Plan for the project road
24User Agency Reply Letter to EDS raised by IRO dated 25.06.2024
25IRO EDS dated 25.06.2024 reply to point no. 1 - Annexure 1(a) Admin Approval
26IRO EDS dated 25.06.2024 reply to point no. 1 - Annexure 1(b) Admin Approval Undertaking for Pkg IIA and IIB
27IRO EDS dated 25.06.2024 reply to point no. 2(iii) - Annexure 2 Revised Forest Area Statement for Bilaspur Division
28IRO EDS dated 25.06.2024 reply to point no. 3 - Annexure 3 Alignment on Old Toposheet (year 1973 & 1974)
29IRO EDS dated 25.06.2024 reply to point no. 4 - Annexure 4 Justification for width of RoW
30IRO EDS dated 25.06.2024 reply to point no. 5 - Annexure 5 Justification for locating project in forest land
31IRO EDS dated 25.06.2024 reply to point no. 6 - Annexure 6 Revised Cost Benefit Analysis
32IRO EDS dated 25.06.2024 reply to point no. 7 - Annexure 7 Undertaking for FRA certificate
33IRO EDS dated 25.06.2024 reply to point no. 9 - Annexure 8(a) Digital Layout Plan for the project road
34IRO EDS dated 25.06.2024 reply to point no. 9 - Annexure 8(b) Component Wise Area Details
35IRO EDS dated 25.06.2024 reply to point no. 11 - Annexure 10 Documentary evidence (jamabandi) of forest land involved
36IRO EDS dated 25.06.2024 reply to point no. 14 - Annexure 11 Undertaking for Trees
37IRO EDS dated 25.06.2024 reply to point no. 17 - Annexure 12 Undertaking for SMC Plan
38IRO EDS dated 25.06.2024 reply to point no. 18(viii) - Annexure 13(a) Request to DILR for NAC CA
39IRO EDS dated 25.06.2024 reply to point no. 18(viii) - Annexure 13(b) Undertaking for NAC CA
40IRO EDS dated 25.06.2024 reply to point no. 10 - Annexure 9 Muck Management Plan
41Non Availability Certificate for Compensatory Afforestation by Director Land Record, Himachal Pradesh
421. User Agency Reply Letter dated 26.12.2024 to EDS raised by IRO dated 04.11.2024
432. IRO EDS dated 04.11.2024 reply to point no. 1- Annexure 1 Minutes of AAC
443.IRO EDS dated 04.11.2024 reply to point no. 1- Annexure 1A No change in alignment
454. IRO EDS dated 04.11.2024 reply to point no. 2(I)- Annexure 2 DGPS Bilaspur Division
466.IRO EDS dated 04.11.2024 reply to point no. 2(II)- Annexure 3 Details Area Statement
477. IRO EDS dated 04.11.2024 reply to point no. 2(IV)- Annexure 4 R&R Plan
488.IRO EDS dated 04.11.2024 reply to point no. 3- Annexure 5 Length and width for RoW
4910.IRO EDS dated 04.11.2024 reply to point no. 5- Annexure 7 Undertaking
5011.IRO EDS dated 04.11.2024 reply to point no. 7(III)- Annexure 8 CA DGPS UPF Kanlah
5112.IRO EDS dated 04.11.2024 reply to point no. 7(IV)- Annexure 9 NAC for CA
529.IRO EDS dated 04.11.2024 reply to point no. 4- Annexure 6 Geological Report
535.IRO EDS dated 04.11.2024 reply to point no. 2(I)- Annexure 2A DGPS Kunihar Division