FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/41472/2019   (ii). Name of Project for which Forest Land is required : Construction of Lower Iku Small Hydro Project   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Lower Iku Small Hydro Project 1 MW is a run of the river scheme which has been envisaged to utilize the water of Iku Khad for power generation in Tehsil Dharamshala District Kangra.   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 1016   (viii). Area of forest land proposed for diversion(in ha.): 0.6806   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : SANJEEV HYDRO PROJECTS PRIVATE LIMITED   (ii). Address1 : VPO SAUHORA, TEHSIL KANGRA   (iii). Address2 : NIL   (iv). State : Himachal Pradesh   (v). District : Kangra   (vi). Pin : 176001   (vii). Landmarks : NIL   (viii). Email address : loweriku@gmail.com   (ix). Landline Telephone No. : 260089   (x). Fax No. : NIL   (xi). Mobile No. : 9857092895   (xii). Website (if any) : NIL   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
  (xiv). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Sanjeev   (ii). Middle Name: NIL   (iii). Last Name: Kumar   (iv). Gender: Male   (v). Designation: Director   (vi). Address 1: VPO GAGGAL   (vii). Address 2: TEHSIL KANGRA   (viii). State: Himachal Pradesh   (ix). District: Kangra   (x). Tehsil: Kangra(T)   (xi). Pin: 176209   (xii). Landmarks: NIL   (xiii). Email Address: loweriku@gmail.com   (xiv). Landline Telephone No.: 260089   (xv). Fax No.: NIL   (xvi). Mobile No.: 9857092895   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : No
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.D/sala0.68060
Total0.68060
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kangra0.68060
Total0.68060
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bagiarra0.68060
0.6806 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Weir Site0.0160
2Conveyance Channel0.0040
3Desilting Tank0.0160
4Water Conductor0.12580
5Forebay Tank0.010
6Spillway0.00760
7Penstock0.02920
8Power House0.030
9Tail Race0.00160
10Road0.26130
11Transmission Line0.1050
12Dumping Site - I0.010
13Dumping Site II0.010
14Dumping Site III0.0110
15Dumping Site IV0.01210
16Dumping Site V0.010
17Dumping Site VI0.010
18Dumping Site VII0.0110
Total 0.6806 0
C. Maps of forest land proposed to be diverted
Division 1. : D/sala
  (i). Area of forest land proposed to be diverted(in ha.) : 0.6806   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : One
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.0.6806    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 6   (iii). Temporary Employment(Number of person-days): 18200
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: NIL   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: NIL   (iii) . Reason for not providing Non-Forest Land: NIL
Additional information Details
Documents
S.No Documents
Remarks
1Reply the Observations
2DC Certificate No Alternative
3Certificate minimum Use
4Undertaking to pay Cost of NPV
5Undertaking to pay Cost of Additional NPV
6Undertaking to Submit FRA Certificate
7Undertaking for Non Violation
8DC Certificate for Non Availability of CA Land
9Allotment Letter
10NOC Gram Panchayat
11NOC HPPWD
12NOC Fisheries Department
13Certificate of Beneficiaries
14Reply to EDS
15Detail Note on Project
16Tripartite Agreement
17NOC IPH Department
18Dimensionwise Detail of Land
19Reclamation Plan
20Certificate Beneficiaries
21Undertaking FRA
22Undertaking to Submit TEC and IA
23Reply to the Observations Nodal Officer
24Detail Note
25Form A Part I
26Detail Of Road and Transmission Line
27Evacuation Plan
28Grid Plan
29Joint Evacuation Agreement
30Undertaking to Comply with NOC IPH
31Revised Layout Plan
32List of Projects and Evacuation Plan in Valley
33Geo Map showing Distance of Projects from ESZ
34Discharge Data and eflow details
35Letter regarding Environment Assessment Measures
36Complete Reply to the Observations IRO Office
37Undertaking to Submit FRA Certificate
38TEC
39Implementation Agreement
40Reply to Observations Regional Office
41Statement of Forest Land
42Statement of Non Forest Land
43Alternative Details
44Scanned Proposal I
45Scanned Proposal II
46Scanned Proposal III
47Scanned Proposal IV
48Scanned Proposal V
49Reply to the Minutes of Meeting of REC Meeting
50Reply to the Observations IRO