FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/150023/2021   (ii). Name of Project for which Forest Land is required : Sajla SHEP (2.00 MW)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Sajla SHEP 2.00 MW located near Khakhnal Village of Tehsil Manali in Distt. Kullu (HP)   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 2000   (viii). Area of forest land proposed for diversion(in ha.): 0.7995   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : SERAJ HYDRO POWER DEVELOPERS   (ii). Address1 : House No. 123 ,Ward No. 4 Raghunathpur Kullu (H.P.)   (iii). Address2 : NIL   (iv). State : Himachal Pradesh   (v). District : Kullu   (vi). Pin : 175101   (vii). Landmarks : Near Raghunathpur LKullu   (viii). Email address : 1973anujmahant@gmail.com   (ix). Landline Telephone No. : NIL   (x). Fax No. : NIL   (xi). Mobile No. : 9816650267   (xii). Website (if any) : NIL   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
  (xiv). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Tilak   (ii). Middle Name: Raj   (iii). Last Name: Thakur   (iv). Gender: Male   (v). Designation: Project incharge   (vi). Address 1: VPO Bhuthi Tehsil & Distt. Kullu HP   (vii). Address 2: Himachal Pradesh   (viii). State: Himachal Pradesh   (ix). District: Kullu   (x). Tehsil: Kullu(T)   (xi). Pin: 175102   (xii). Landmarks: Lugvalley   (xiii). Email Address: 1973anujmahant@gmail.com   (xiv). Landline Telephone No.: NIL   (xv). Fax No.: NIL   (xvi). Mobile No.: 9816650267   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : No
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kullu0.79950
Total0.79950
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kullu0.79950
Total0.79950
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Muhal Gojra (20/20)0.79950
0.7995 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Interconnection Point0.0080
2Underground Transmission Line-10.02310
3MD-10.0250
4Road to Power House0.1230
5MD-20.0150
6Underground Transmission Line-20.00020
7Penstock-10.40080
8MD-30.0160
9MD-40.020
10D- Tank0.0150
11Score Pipe0.00050
12Feeder Pipe0.00150
13Gravel Taper0.00150
14Weir Site0.0150
15Tail Race0.0050
16Underground Transmission Line-30.00220
17MD-50.030
18Power House & Switchyard0.080
19Road to Power House Site0.00450
20Penstock-20.01320
Total 0.7995 0
C. Maps of forest land proposed to be diverted
Division 1. : Kullu
  (i). Area of forest land proposed to be diverted(in ha.) : 0.7995   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : One
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.0.7995    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 8   (iii). Temporary Employment(Number of person-days): 180000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: NIL   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: NIL   (iii) . Reason for not providing Non-Forest Land: NIL
Additional information Details
Documents
S.No Documents
Remarks
1Sajla Reply Letter to DFo on dated 01 August 2022
2Reply Letter to the DFO
3Population Detail of Gojra Village
4Sajla reply to nodal officer
5Power Generation Capacity
6Undertaking for WLMP
7Undertaking for SMP
8undertaking for additional NPV
9Reply Letter to The DFO 29 June 2023
10Allotment Latter
11undertaking for CA
12HPPTCL Letter to Sajla
13certificate for approval of the proposal
14Impacts of Sajla SHEP
15certificate for not change the alignment
16TEC of Sajla SHEP
17Component wise detail
18Undertaking for IA
19Detail note of the project
20undertaking for MD Site
21ECO Zone certificate
22undertaking for wildlife management Plan
23Reply Letter to the DFO 9 April 2024
24Himurja Power Generation of Sajla
25River Basin Study of Beas River
26Reply Letter to DFO 19 March 2024
27DoE letter
28Field Book
29NOC of Fisheries Department
30Reply to The DFO Kullu 8 Jan. 2024
31Revised Layout Plan
32check list no. 7 forest land detail
33Tatima Sajal Shep
34FRA undertaking
35upstream and downstream projects Digital map
36Sajla FCA in Single PDF
37Gram Panchayat NOC
38Reply to DFO Kullu 08 May 2023
39IPH NOC
40Joint Inspection Report
41Layout Plan
42Muck Estimate
43Muck Management Plan
44non availability of non forest land for ca
45non availability of non forest land certificate
46check list no. 8 non forest land
47NPV undertaking
48PWD NOC
49TEC & IA undertaking
50undertaking for fuel/ gas, etc.
51undertaking for labour camp etc
52Voilation certificate
53Wild Life NOC
54undertaking for population certificate