FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/HYD/150023/2021
(ii). Name of Project for which Forest Land is required :
Sajla SHEP (2.00 MW)
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Sajla SHEP 2.00 MW located near Khakhnal Village of Tehsil Manali in Distt. Kullu (HP)
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Hydel
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
2000
(viii). Area of forest land proposed for diversion(in ha.):
0.7995
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
SERAJ HYDRO POWER DEVELOPERS
(ii). Address1 :
House No. 123 ,Ward No. 4 Raghunathpur Kullu (H.P.)
(iii). Address2 :
NIL
(iv). State :
Himachal Pradesh
(v). District :
Kullu
(vi). Pin :
175101
(vii). Landmarks :
Near Raghunathpur LKullu
(viii). Email address :
1973anujmahant@gmail.com
(ix). Landline Telephone No. :
NIL
(x). Fax No. :
NIL
(xi). Mobile No. :
9816650267
(xii). Website (if any) :
NIL
(xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
(xiv). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
Tilak
(ii). Middle Name:
Raj
(iii). Last Name:
Thakur
(iv). Gender:
Male
(v). Designation:
Project incharge
(vi). Address 1:
VPO Bhuthi Tehsil & Distt. Kullu HP
(vii). Address 2:
Himachal Pradesh
(viii). State:
Himachal Pradesh
(ix). District:
Kullu
(x). Tehsil:
Kullu(T)
(xi). Pin:
175102
(xii). Landmarks:
Lugvalley
(xiii). Email Address:
1973anujmahant@gmail.com
(xiv). Landline Telephone No.:
NIL
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9816650267
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7.
Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9.
Details of Transfer of Lease
Serial No
Name of person
Address of person
Date of transfer
MMDR File
Transfer Deed
Conservation
MoEF_file No
Date of approval
MoEF file
NIL
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
(i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. :
No
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kullu
0.7995
0
Total
0.7995
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kullu
0.7995
0
Total
0.7995
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Muhal Gojra (20/20)
0.7995
0
0.7995
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Interconnection Point
0.008
0
2
Underground Transmission Line-1
0.0231
0
3
MD-1
0.025
0
4
Road to Power House
0.123
0
5
MD-2
0.015
0
6
Underground Transmission Line-2
0.0002
0
7
Penstock-1
0.4008
0
8
MD-3
0.016
0
9
MD-4
0.02
0
10
D- Tank
0.015
0
11
Score Pipe
0.0005
0
12
Feeder Pipe
0.0015
0
13
Gravel Taper
0.0015
0
14
Weir Site
0.015
0
15
Tail Race
0.005
0
16
Underground Transmission Line-3
0.0022
0
17
MD-5
0.03
0
18
Power House & Switchyard
0.08
0
19
Road to Power House Site
0.0045
0
20
Penstock-2
0.0132
0
Total
0.7995
0
C.
Maps of forest land proposed to be diverted
Division 1. : Kullu
(i). Area of forest land proposed to be diverted(in ha.) :
0.7995
(ii).Shape of forest land proposed to be diverted :
Linear
(b). No. of Segments :
One
Segments wise details
Segmenst
Segment Area(in ha.)
Kml File of Segments
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
0.7995
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
8
(iii). Temporary Employment(Number of person-days):
180000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
NIL
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
NIL
(iii) . Reason for not providing Non-Forest Land:
NIL
Additional information Details
Documents
S.No
Documents
Remarks
1
Sajla Reply Letter to DFo on dated 01 August 2022
2
Reply Letter to the DFO
3
Population Detail of Gojra Village
4
Sajla reply to nodal officer
5
undertaking for additional NPV
6
Allotment Latter
7
undertaking for CA
8
certificate for approval of the proposal
9
certificate for not change the alignment
10
Component wise detail
11
Detail note of the project
12
ECO Zone certificate
13
Field Book
14
NOC of Fisheries Department
15
check list no. 7 forest land detail
16
FRA undertaking
17
Gram Panchayat NOC
18
IPH NOC
19
Joint Inspection Report
20
Layout Plan
21
Power Generation Capacity
22
Muck Estimate
23
Muck Management Plan
24
HPPTCL Letter to Sajla
25
Undertaking for WLMP
26
Impacts of Sajla SHEP
27
TEC of Sajla SHEP
28
Undertaking for IA
29
undertaking for MD Site
30
Undertaking for SMP
31
undertaking for wildlife management Plan
32
River Basin Study of Beas River
33
Revised Layout Plan
34
Reply Letter to The DFO 29 June 2023
35
Tatima Sajal Shep
36
upstream and downstream projects Digital map
37
Sajla FCA in Single PDF
38
Reply Letter to the DFO 9 April 2024
39
Reply to DFO Kullu 08 May 2023
40
Reply Letter to DFO 19 March 2024
41
Himurja Power Generation of Sajla
42
DoE letter
43
Reply to The DFO Kullu 8 Jan. 2024
44
non availability of non forest land for ca
45
non availability of non forest land certificate
46
check list no. 8 non forest land
47
NPV undertaking
48
PWD NOC
49
TEC & IA undertaking
50
undertaking for fuel/ gas, etc.
51
undertaking for labour camp etc
52
Voilation certificate
53
Wild Life NOC
54
undertaking for population certificate