FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/HYD/147118/2021
(ii). Name of Project for which Forest Land is required :
Jiwa-II (1.75 MW) SHEP
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Jiwa-II (1.75 MW) Hydro Electric Project is run-of-the river project. This project is located opposite village Kathiari/Bhiyali near Sainj town in Sub-Tehsil Sainj, Sub Division Banjar, District Kullu, Himachal Pradesh.
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Hydel
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
1313.83
(viii). Area of forest land proposed for diversion(in ha.):
0.8223
(ix). Non-forest land required for this project(in ha.):
0.0121
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
BEHAL MOTORS
(ii). Address1 :
Plot No. 6-7, Industrial Area, Phase-III
(iii). Address2 :
Saulikhad Mandi HP
(iv). State :
Himachal Pradesh
(v). District :
Mandi
(vi). Pin :
175001
(vii). Landmarks :
Saulikhad
(viii). Email address :
d.pdhawan@rediffmail.com
(ix). Landline Telephone No. :
235102
(x). Fax No. :
NIL
(xi). Mobile No. :
9418062183
(xii). Website (if any) :
No
(xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
(xiv). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
Deepak
(ii). Middle Name:
NIL
(iii). Last Name:
Dhawan
(iv). Gender:
Male
(v). Designation:
Director
(vi). Address 1:
S/o Sh. Rajinder Dhawan, 18/1, Jawahar Nagar, Mandi
(vii). Address 2:
HP
(viii). State:
Himachal Pradesh
(ix). District:
Mandi
(x). Tehsil:
Mandi(T)
(xi). Pin:
175001
(xii). Landmarks:
Jawahar Nagar Mandi
(xiii). Email Address:
d.pdhawan@rediffmail.com
(xiv). Landline Telephone No.:
NIL
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9418062183
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7.
Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9.
Details of Transfer of Lease
Serial No
Name of person
Address of person
Date of transfer
MMDR File
Transfer Deed
Conservation
MoEF_file No
Date of approval
MoEF file
NIL
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
(i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. :
No
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
GHNP
0.8223
0.0121
Total
0.8223
0.0121
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kullu
0.8223
0.0121
Total
0.8223
0.0121
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Kathiari/ Bhiyali
0.8223
0.0121
0.8223
0.0121
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Weir Site
0.0226
0
2
Intake Tank
0.0024
0
3
Water Channel-1
0.0436
0
4
MD-1
0.0141
0
5
Score Pipe
0.0032
0
6
Desilting Tank
0.0242
0
7
MD-II
0.0141
0
8
Water Channel-II
0.2892
0
9
MD-III
0.0071
0
10
MD-IV
0.0056
0
11
Forebay Tank
0.0141
0
12
MD-V
0.0254
0
13
Penstock
0.0395
0
14
Power House cum Switchyard
0.1482
0
15
Tail Race
0.0036
0
16
MD-VI
0.0399
0
17
Raod Cum U/G Transmission Line-1
0.0169
0
18
Road Cum U/G Transmission Line-II
0.0121
0.0121
19
Underground Road Cum U/G Transmission Line
0.0273
0
20
Raod Cum U/G Transmission Line-III
0.0395
0
21
MD-VII
0.0198
0
22
Interconnection Point
0.0099
0
Total
0.8223
0.0121
C.
Maps of forest land proposed to be diverted
Division 1. : GHNP
(i). Area of forest land proposed to be diverted(in ha.) :
0.8223
(ii).Shape of forest land proposed to be diverted :
Linear
(b). No. of Segments :
One
Segments wise details
Segmenst
Segment Area(in ha.)
Kml File of Segments
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
0.8223
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
12
(iii). Temporary Employment(Number of person-days):
180000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
Yes
(a). Whether Project or a part thereof is located within a Protected Area ? :
No
(ii). Status of approval of the Standing Committee of National Board for the Wildlife(NBWL) to the Project :
Application yet to be submitted
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
NIL
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
NIL
(iii) . Reason for not providing Non-Forest Land:
NIL
Additional information Details
Documents
S.No
Documents
Remarks
1
reply to DFO 3 Oct. 2022
2
Non Availability of non forest land certificate
3
Non Availability of non forest land certificate for Compensatory Afforestation
4
Additional NPV Undertaking
5
Certificate for the approval of the Project
6
Certificate for minimum use of forest land
7
Certificate for not change the alignment
8
Check List No. 7
9
Check List No. 8
10
Allotment Letter
11
Check List No. 32
12
Check List No. 4
13
Fisheries NOC
14
detail repot on voilation
15
Wildlife NOC
16
Layout Plan of Jiwa
17
Gram Panchayat NOC
18
Muck dumping site, Plan and Estimated Cost
19
IPH NOC
20
NPV Undertaking
21
Jiwa-II IA
22
TEC
23
Reply letter to DFO June 2024
24
Undertaking for CA
25
FCA Proposal in Single PDF
26
Reply to The DFO 21 Jan. 2023
27
Undertaking for cooking gas etc.
28
Undertaking for submission of Wild Life NOC
29
1.75 MW Jiwa-II Letter to Behal Motors
30
Joint Inspection Report
31
Power Evacuation Letter to Jiwa with Layout Plan
32
Transmission Line Detail
33
Reply Letter to DFO Jan. 2023
34
Population Detail
35
HPSEBL Letter
36
Jiwa up and down stream, aerial distance map
37
Impacts of HPSEBL
38
PWD NOC
39
Jiwa-II TEC
40
Letter Issued by DOE and HIMURJA
41
Revenue Department NOC
42
Reply Letter to Nodal Officer
43
FRA undertaking
44
Layout Plan
45
Power Generation Capacity
46
Undertaking for Submission of Transmission Plan
47
Jiwa Transmission Plan and Letter
48
Private Land NOC
49
Reply Letter to DFO 03 April 2024
50
Private Land NOC
51
Reply Letter to DFO
52
undertaking for no trees in MD Site
53
undertaking for SMCP
54
undertaking for WLMP
55
Up stream and dowen stream projects digital map
56
Undertaking to stipulated E-Flow
57
Reply Letter to DFO 5 May 2023
58
Power Evacuation Letter to Jiwa with Layout Plan
59
detail of transmission line
60
Reply Letter to DFO 16 Feb. 2024