FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/12958/2015   (ii). Name of Project for which Forest Land is required : LINGTI SMALL HYDRO PROJECT   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Lingti Small Hydro Project 500 kW is a run of the river scheme which has been envisaged to utilize the water of Lingti khad, a tributary of Neugal Khad in Beas Basin for power generation. The scheme involves construction of Weir structure at EL 1710 m on Lingti khad, near village Rakh. The De-siltin   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 420   (viii). Area of forest land proposed for diversion(in ha.): 1.1163   (ix). Non-forest land required for this project(in ha.): 0.0014   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : PRASHANTI HYDRO ENERGIES PRIVATE LIMITED   (ii). Address1 : SAI SANKALP, NEAR PNB BAGHER ROAD,   (iii). Address2 : PANCHRUKHI, TEHSIL PALAMPUR   (iv). State : Himachal Pradesh   (v). District : Kangra   (vi). Pin : 176103   (vii). Landmarks : NEAR PNB   (viii). Email address : parshanti.hydro@gmail.com   (ix). Landline Telephone No. : 260089   (x). Fax No. : 0   (xi). Mobile No. : 9910039880   (xii). Website (if any) : NIL   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
  (xiv). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: NEERAJ   (ii). Middle Name: NIL   (iii). Last Name: VASHISTH   (iv). Gender: Male   (v). Designation: DIRECTOR   (vi). Address 1: SAI SANKALP, NEAR PNB BAGHER ROAD,   (vii). Address 2: PANCHRUKHI, TEHSIL PALAMPUR   (viii). State: Himachal Pradesh   (ix). District: Kangra   (x). Tehsil: Palampur(T)   (xi). Pin: 176103   (xii). Landmarks: NIL   (xiii). Email Address: parshanti.hydro@gmail.com   (xiv). Landline Telephone No.: 260089   (xv). Fax No.: NIL   (xvi). Mobile No.: 9910039880   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : No
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Palampur1.11630.0014
Total1.11630.0014
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kangra1.11630.0014
Total1.11630.0014
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Rakh1.11630
1.1163 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Weir Site0.0150
2Conveyance Channel0.0030
3Desilting cum forebay0.020
4Silt flushing pipe0.0010
5Pen Stock0.19880
6Tail Race0.0010
7Power House and switch yard0.10090
8Transmission Line0.6150
9Dumping-10.0150
10Dumping-20.0150
11Dumping-30.01530
12Dumping-40.02210
13Dumping-50.00750
14Dumping-60.01410
Total 1.0437 0
C. Maps of forest land proposed to be diverted
Division 1. : Palampur
  (i). Area of forest land proposed to be diverted(in ha.) : 1.1163   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : One
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.1.1163    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 15   (iii). Temporary Employment(Number of person-days): 45000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Certificate from Chief Secretary regarding non-availability of suitable non-forest/ revenue forest land
Additional information Details
Documents
S.No Documents
Remarks
1Allotment Letter of the Project
2Certificate from DC regarding Non Availability of Non Forest Land for CA and for location of the Project
3NOC from Panchayat and other departments
4TEC of the Project from DOE
5Implementation Agreement`
6Certificate Beneficiary
7FRA along with proceeding
8Joint Inspection report
9Site Inspection report
10FRA With SDm proceeding As per requried by your good office Also Uploaded Against K(i) of part -1
11IRO observations reply
12Component wise breakup
13Justification for CIA and CCS study
14Detail Note on project
15Layout Plan
16Details of lenght ,Width of ROW
17Muck Management Plan
18NOc From Dept of Fisheries
19Power evacuation plan
20Detail of forest area Involved
21Reclamation Plan
22Detail of non-forest area Involved
23Toposheet
24justification of location of the project in forest area
25Undertaking for adherence stipulated eflow
26Certificate of minumum use of forest land
27Undertaking for SMCP
28alternatives examined and reasons for rejections
29Schedule-III certificate
30undertaking to bear cost of CA
31Zero tree certificate
32undertaking to bear cost of NPV & additional NPV
33tatima
34Land suitability certificate for 2.5 Hac
35certificate for no tree felling .
36Project Field book