FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/9772/2015   (ii). Name of Project for which Forest Land is required : Construction of Gharat(Kotdwar) Mundla Motor road in District Pauri-Garhwal Uttarakhand   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The proposed road started from Gharat (Kotdwar) and ended at Mundla in Distt Pauri Garhwal Under State Sector.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 139   (viii). Area of forest land proposed for diversion(in ha.): 8.1   (ix). Non-forest land required for this project(in ha.): 0.9   (x). Total period for which the forest land is proposed to be diverted(in years): NIL
A-2. Details of User Agency
  (i). Name : ENGINEER IN CHIEF, PUBLIC WORK DEPARTMENT, DEHRADUN   (ii). Address1 : Yamuna Colony Dehradun   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Dehradun   (vi). Pin : 248001   (vii). Landmark : Near Rohan Motors   (viii). Email address : cepwdua@rediffmail.com   (ix). Landline Telephone No. : 135-2531072   (x). Fax No. : 135-2531154   (xi). Mobile No. : 9412992971   (xii). Website (if any) : http://pwd.uk.gov.in   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: AKRITI   (ii). Middle Name: NIL   (iii). Last Name: GUPTA   (iv). Gender: Female   (v). Designation: Assistant Engineer   (vi). Address 1: CONSTRUCTION DIVISION PWD, DUGADDA   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Pauri Garhwal   (x). Tehsil: NIL   (xi). Pin: 246127   (xii). Landmark: NEAR GOVT. HOSPITAL   (xiii). Email Address: eepwdcddugadda@gmail.com   (xiv). Landline Telephone No.: 1382-251221   (xv). Fax No.: 01382251221   (xvi). Mobile No.: 9458387552   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1ReturnedFP/UK/ROAD/15984/2015FP/UK/ROAD/15984/20156.63750
Total 6.6375 0
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Lansdowne8.10.9
Total8.10.9
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pauri Garhwal8.10.9
Total8.10.9
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Gharat Mundra8.10.9
Total 8.1 0.9
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Gharat8.10.9
Total 8.1 0.9
C. Maps of forest land proposed to be diverted
Division 1. : Lansdowne
  (i). Area of forest land proposed to be diverted(in ha.) : 8.1   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.8.1    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: the villagers are not aggree for any other alignme
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: No
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Linear or 'strip' plantation declared as protected forest along with road/rail/canal sides for widening or expansion of road/rail/canal
Additional information Details
Documents
S.No Documents
Remarks
1MINIMUM DEEMAND OF FOREST LAND
2LAND SCHEDULE
3CERTIFICATE OF DIMENSION
4BAR CHART
5SITE SUITABLE CERTIFICATE
6Cost of forest land
7ESTIMATE OF ROAD SIDE PLANTATION
8Annexure XI
9Muck Disposal
10CANCELATION CERTIFICATE OF OPTIONAL ALIGNMENT
11CERTIFICATE OF DISTANCE FROM NATIONAL PARK
12ACT
13GEOLOGIST REPORT
14G.O.
15FACT SHEET
16CERTIFICATE OF BENIFITED VILAGERS, FAMILIES, POPULATION
17CERTIFICATE OF environmental SANCTIONED
18CERTIFICATE OF FUEL KEROSINE
19NOC
20CERTIFICATE OF HARRITAGE
21CERTIFICATE OF NO DAMAGE OF WILD LIFT AND TREES
22COMPANSATORY PLANTATION
23TASK FORCE
24JOINT INSPECTION CERTIFICATE
25STANDARD CONDITION
26WORK NOT STARTED CERTIFICATE
27REPORT
28NPV
29CERTIFICATE OF NO STHAL VISHISHT
30KHATONI
31SIMANKAN HETU CONSTRUCTION OF RCC PILLAR
32SITE MAP
33letter of forest proposal three copy submit.