FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/22961/2016   (ii). Name of Project for which Forest Land is required : Roatukibeli Chalidhar motor road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : With the construction of this motor road will connect the Village Raoutu Ki belli Chlidhar route will increase employment in the village and the village transportation of cash crops will reduce transportation expenses.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 25.2   (viii). Area of forest land proposed for diversion(in ha.): 1.014   (ix). Non-forest land required for this project(in ha.): 1.358   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : PUBLIC WORKS DEPARTMENT   (ii). Address1 : E.E. Ty. Divi. P.W.D. Thatyur Tehri Garhwal   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Tehri Garhwal   (vi). Pin : 249180   (vii). Landmark : NIL   (viii). Email address : eepwdthatyur@rediffmail.com   (ix). Landline Telephone No. : 1376-246321   (x). Fax No. : 1376-135   (xi). Mobile No. : 9557823200   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Rajnish   (ii). Middle Name: NIL   (iii). Last Name: Kumar   (iv). Gender: Male   (v). Designation: Excutive Engineer   (vi). Address 1: E.E. Ty. Divi. P.W.D. Thatyur Tehri Garhwal   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Tehri Garhwal   (x). Tehsil: NIL   (xi). Pin: 249180   (xii). Landmark: NIL   (xiii). Email Address: eepwdthatyur@rediffmail.com   (xiv). Landline Telephone No.: 1376-246321   (xv). Fax No.: 01352631759   (xvi). Mobile No.: 9557823200   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1ReturnedFP/UK/ROAD/37504/2018375044.81950
Total 4.8195 0
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Mussoorie1.0141.358
Total1.0141.358
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tehri Garhwal1.0141.358
Total1.0141.358
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Raotuki beli Chalidhar1.0141.358
Total 1.014 1.358
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road1.0140.495
2muck disposal00.863
Total 1.014 1.358
C. Maps of forest land proposed to be diverted
Division 1. : Mussoorie
  (i). Area of forest land proposed to be diverted(in ha.) : 1.014   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.1.014    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 1000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Tehri Garhwal
  (a). Village: rotu ki beli   (b). Area(in ha.): 2.028   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 3049   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Administrative Sanction GO
2BarChart
3DetailofAlignment
4Religious and historical place certificate
5Explosive Certificate
6Benefited villages
7Geological report
8Joint inspection
9Standard Conditions
10mapCA
11maproad
12Minimum Land Certificate
13mou agreement
14Minimum Tree effected certificate
15Less Tree effected certificate
16No alternative land availability certificate
17NOC Local gram sabha
18NO Monument effected Cerificate
19non accumbrance
20nonationalpark
21NPV certificate
22ownership
23No violation Certificate
24Parman Pater Undertekingby user agency
25Geologist Akhya
26Joint inspection report
27Site Inspection Report
28Task Force Certificate
29toposheetCA
30Toposheetroad
31National Park and wild life certificate
32Work Not Started
33Acknowledgement Slip of the project
34Land Schedule
35Muck Disposal Scheme
36Effected Tree details
37Khasra Khatoni Roatu Ki Beli
38NOC Gram Sabha
39Compartmentwise Details
40Detail of Alignment
41Oak Tree details
42Fax Sheet
43Plantation Prakalan
44Visaya Soochi
45Pardhan Parman
46muck certificate
47ACKNOWLEDGEMENT SLIP receving is uploaded.
48submitted file. acknowledgement slip uploaded
49corrected details as per DFO Mussoorie letter No 1686/12-1 dated 06-11-2017 coloumn No.2
50banj ke trees
51Acknowledgement Slip summation of hard copy of this project as per Serial No. 35 & 49 already uploaded before
52submission Proof of project part-1 as per EDS Quarry duly signed by Executive Engineer
53Recent Authority Letter
54Recent justifiction
55ans of eds quarry
56FRA (Correction as per requirement letter no 05-01-2018)
57Letter