FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/RAIL/148846/2021   (ii). Name of Project for which Forest Land is required : Development of 126 Km Long Rishikesh- Karnprayag New BG Rail Link in the State of Uttarakhand - Additional Land at Ratura   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The requirement of additional land, arises due to change in design to provide stability to Tunnel (T14) and station yard area. The additional land is situated on already approved alignment   (iv). State : Uttarakhand   (v). Category of the Proposal : Railway   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 1500000   (viii). Area of forest land proposed for diversion(in ha.): 1.455   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : CPM RISHIKESH OFFICE RAIL VIKAS NIGAM LIMITED   (ii). Address1 : RVNL Office Building, Opposite GST Bhawan, Next to GMVN, Shyampur Bypass Road, Rishikesh   (iii). Address2 : Rishikesh   (iv). State : Uttarakhand   (v). District : Dehradun   (vi). Pin : 249201   (vii). Landmark : Opposite GST Bhawan   (viii). Email address : rvnlrksh1@gmail.com   (ix). Landline Telephone No. : 135-2442008   (x). Fax No. : 135-   (xi). Mobile No. : 8755907868   (xii). Website (if any) : www.rvnl.org   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: Bhanu   (ii). Middle Name: NIL   (iii). Last Name: Prakash   (iv). Gender: Male   (v). Designation: General Manager Projects I   (vi). Address 1: Rail Vikas Nigam Limited   (vii). Address 2: Ist Floor, August Kranti Bhawan, Bhikaji, Delhi   (viii). State: Delhi   (ix). District: South   (x). Tehsil: Hauz Khas   (xi). Pin: 110066   (xii). Landmark: Bhikaji Gama Place   (xiii). Email Address: rvnlrksh1@gmail.com   (xiv). Landline Telephone No.: 11-26738503   (xv). Fax No.: NIL   (xvi). Mobile No.: 8755907868   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1ApprovedFP/UK/RAIL/14375/20158B/UCP/07196/2015-FC63.42263.42210 Oct 201627 Apr 2017
2ApprovedFP/UK/RAIL/16947/20158B/UCP/07/31/2016/FC500.5996500.599629 Aug 201720 Feb 2018
3ApprovedFP/UK/RAIL/34889/20188B/UCP/07/18/2019/FC1.52051.520522 Apr 201902 Sep 2019
Total 565.5421 565.5421
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Rudraprayag1.4550
Total1.4550
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Rudraprayag1.4550
Total1.4550
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Ratura1.4550
Total 1.455 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1T14 Portal Stability1.4550
Total 1.455 0
C. Maps of forest land proposed to be diverted
Division 1. : Rudraprayag
  (i). Area of forest land proposed to be diverted(in ha.) : 1.455   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.1.455    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 450   (iii). Temporary Employment(Number of person-days): 16352000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Prativedan
2Certificate for Financial Support for Project
3Toposheet
4Digital Map
5Justification
6Map of three Alignment
7Comparision Statement of three Alignment
8Certificate for non availability of Alternative Land
9Land Schedule
10Length and Width of Proposed Land for Diversion
11Bar Chart
12Certificate for Work not Begin
13Tree Details
14Tree Details with Price
15Trees to be Cut
16Details of Banjh Trees
17Form 23
18Certificate for Minimum Tree
19Aerial Distance Certificate
20Aerial Distance Certificate if projects within 10 Km radius of PA
21NOC under FRA from Div and Sub-Div Level
22NOC under FRA from Gram Sabha
23Form 31
24Form 32
25Undertaking to follow Geotechnical Instructions
26Geological and Geotechnical Report
27Primary Joint Inspection Report
28Task Force Certificate
29Undertaking to follow Instructions
30Certificate for Religious Certificate
31Undertaking not to harm Forest Dwellors
32Undertaking to provide Kerosin Oil
33Villages to be Benefited
34Certificate for Lease
35Cost of Tree for afforestation
36Undertaking for Tree Plantations
37Exemption Certificate
38Muck Dumping Plan
39NPV
40Certificate for Land Lease
41Certificate for non voilation of FCA 1980
42Catchment Treatment Area Plan
43Form 56
44Form 56
45CA Land Topo Map
46Reply1
47Certificate for CA Land Suitability
48ca land digital map
49Response Letter 28.03.2022
50New Geological Report Dated 20.05.2022
51New Justification Dated 20.05.2022
52New Tree Enumeration Dated 20.05.2022
53New Work Not Yet Started Certificate Dated 20.05.2022
54New Village Level Committee FRA Dated 20.05.2022
55New SDM Level Committee FRA Dated 20.05.2022
56New DM Level Committee FRA Dated 20.05.2022
57New Forwarding Letter to DFO Dated 20.05.2022
58Forwarding Letter 27.06.2022
59CA Land Digital Map 27.06.2022
60CA Land Suitability Certificate 27.06.2022
61CA Land Topo Map 27.06.2022
62CA Scheme 27.06.2022
63FRA 2006 27.06.2022
64Geological Report 27.06.2022
65Justification 27.06.2022
66Tree Enumeration 27.06.2022
67Work Not Yet Started 27.06.2022
68Forwarding Letter 05.07.2022
69FRA (DMLC+SDMLC+VLC) 05.07.2022
70Justification 05.07.2022
71NPV 05.07.2022