FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/OFC/154573/2022   (ii). Name of Project for which Forest Land is required : Bejro Bridge Masso Chokhal Maildhar Bharadidhar 32.1 km   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Vindhya Telelinks Limited have license from department of telecom as Infrastructure Provider category- I (IP-I) to provide telecom infrastructure and further leaseout. It will help to spread out the advance telecom services like 3G, 4G and 5G which will be milestone in revolution of information tec   (iv). State : Uttarakhand   (v). Category of the Proposal : Optical Fibre Cable   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 192   (viii). Area of forest land proposed for diversion(in ha.): 0.321   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 30
A-2. Details of User Agency
  (i). Name : M/S VINDHYA TELELINKS LIMITED   (ii). Address1 : Plot No. E-237, 3rd floor, Industrial Area,   (iii). Address2 : Phase VIII B, Mohali, Punjab   (iv). State : Uttarakhand   (v). District : Dehradun   (vi). Pin : 160055   (vii). Landmark : NIL   (viii). Email address : mohan.singh@vtlrewa.com   (ix). Landline Telephone No. : 172-5099802   (x). Fax No. : 172-   (xi). Mobile No. : 8725090111   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Jagdamba   (ii). Middle Name: NIL   (iii). Last Name: Prasad   (iv). Gender: Male   (v). Designation: GM   (vi). Address 1: Plot No. E-237, 3rd floor, Industrial Area,   (vii). Address 2: Phase VIII B, Mohali, Punjab   (viii). State: Punjab   (ix). District: SAS Nagar   (x). Tehsil: S.A.S.Nagar (Mohali)   (xi). Pin: 160055   (xii). Landmark: NIL   (xiii). Email Address: mohan.singh@vtlrewa.com   (xiv). Landline Telephone No.: 172-5099802   (xv). Fax No.: NIL   (xvi). Mobile No.: 8725090111   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Garhwal,Pauri0.3210
Total0.3210
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pauri Garhwal0.3210
Total0.3210
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bharela, siloli, Kanera, Khatauli, Chaupta, Masso0.3210
Total 0.321 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Laying of Optical Fiber cable :Bejro Bridge Masso0.3210
Total 0.321 0
C. Maps of forest land proposed to be diverted
Division 1. : Garhwal,Pauri
  (i). Area of forest land proposed to be diverted(in ha.) : 0.321   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.321    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: No alternative Land
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: No
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
13-Joint Inspection Report
22-Part-1-3
36-Bar chart
47-Certificate of No other Alternate Land
58-Land Schedule Forest
69-Certificate Length-Width of Project
710-Certicficate Givin by the DFO in case the Trees are not affected
811-Certificate Wildlife sanctuary
912-Airel Distance Cetificate
1013-Certificate of cancellation of alternative alignment
1114-Certificate Work not Start
1215-Geologist Report
1316-Certificate of Compliance with the recommendations of the district tack force
1417-Certificate of no Damage to Vegitation & Living Being
1518-Certificate of not being a site of historical importance
1619-Certificate of proper plantation plan on the vacant site
1720-Cerificatebin respect of the village to be benefited
1821-Certificate for 100 Trees for Plantation
1922-Certificate regarding submission pf NPV
2023-Certificate regarding obtaining environmental clearance
2124-Certificate location Non specific
2225-Certificate debris disposal
2326-Certificate of Providing Cooking Gas to the workers
2427-Manak Sarte
2529-Certificate under the Scheduled Tribes and Traditional forest dwellers act 2006
2630-Certificate granted by deputy district magistrate
2732-Fact Sheet