FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/TRANS/121108/2021   (ii). Name of Project for which Forest Land is required : Laying for Under Ground 11KV XLPE 185 mm Cable for Electrification of Anand Colony at Bandra , Manbag, Word No.-14, Jaisinghpura Khor , Tehsil – Jaipu & District-Jaipur (Rajasthan)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Laying for Under Ground 11KV XLPE 185 mm Cable for Electrification of Anand Colony at Bandra , Manbag, Word No.-14, Jaisinghpura Khor , Tehsil – Jaipu & District-Jaipur (Rajasthan)” Total Route length 0.577km   (iv). State : Rajasthan   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 27.045   (viii). Area of forest land proposed for diversion(in ha.): 0.0189   (ix). Non-forest land required for this project(in ha.): 0.0388   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : ASSISTANT ENGINEER (E-IV) JVVNL AMBER JAIPUR   (ii). Address1 : Assistant Engineer (E-IV) JVVNL AMBER Jaipur Rajasthan   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Jaipur   (vi). Pin : 302028   (vii). Landmark : Hathi Ganw Mod , Delhi Road   (viii). Email address : aene4jcc@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 9413390094   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State PSU
A-3. Details of Person Making Application
  (i). First Name: Vikash   (ii). Middle Name: NIL   (iii). Last Name: Bansal   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: Assistant Engineer (E-IV) JVVNL AMBER Jaipur Rajasthan   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Jaipur   (x). Tehsil: Amber   (xi). Pin: 392028   (xii). Landmark: Hathi Ganw Mod Delhi Road   (xiii). Email Address: aene4jcc@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 9413390094   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Jaipur (Zoo)0.01890.0388
Total0.01890.0388
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Jaipur0.01890.0388
Total0.01890.0388
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Killangarh0.01890.0388
Total 0.0189 0.0388
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Laying for Under Ground 11KV XLPE 185 mm Cable0.01890.0388
Total 0.0189 0.0388
C. Maps of forest land proposed to be diverted
Division 1. : Jaipur (Zoo)
  (i). Area of forest land proposed to be diverted(in ha.) : 0.0189   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.0189    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: Laying for Under Ground 11KV XLPE 185 mm Cable Al
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 4   (iii). Temporary Employment(Number of person-days): 250
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Authorization letter
2Administrative and Financial sanction
3Technical sanction
4BAR CHART
5CERTIFICATE FOR MINIMUM USE OF FOREST LAND
6CROSS SECTION
7Details of permanent employment to be generated
8JAMABANDI COPY
9JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
10LAYOUT PLAN FOR COLONY AT LAYING 11 KV ELECTRICAL CABLE
11SEGMENT WISE AREA CALCULATION SHEET
12STATEMENT SHOWING DETAILS OF FORESTAREA PROPOSED FOR DIVERSION
13STATEMENT SHOWING DETAILS OF NON FOREST AREA INVOLVED IN THE PROPOSAL
14UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA DURING LAYING FOR UNDER GROUND 11KV XLPE 185 MM CABLE
15UNDERTAKING FOR MEDICIANAL PLANTS
16UNDERTAKING FOR MUCK DISPOSAL
17UNDERTAKING FOR NO CHANGE S IN STATUTORY POSITION OF DIVERTED FOREST LAND
18UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION
19UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
20UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
21UNDERTAKING FOR TWO TIME DEGRADED FOREST LAND
22UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING LAYING FOR UNDER GROUND 11KV XLPE 185 MM CABLE
23UNDERTAKING FOR USE OF FOREST LAND
24UNDERTAKING OF FRA CERTIFICATE
25Geo-Referenced Survey of India toposheet with forest land and Proposed Laying for Under Ground 11KV XLPE 185 mm Cable Route alignment Scale 1 : 50000 Toposheet no 45N/13
26Geo-Referenced DGPS Map Required Forest Land Coordinates with Proposed Laying for Under Ground 11KV XLPE 185 mm Cable Route alignment
27Khasra map Super Imposed 11 kv Cable Scale 1 : 4000
28UNDERTAKING FOR THE PROPOSED AREA DOES NOT FALL IN SANCTUARY OR NATIONAL PARK
29UNDERTAKING FOR LAYING FOR UNDER GROUND 11KV XLPE 185 MM CABLEWORK WILL BE EXECUTE WITHIN THE RIGHT OF WAY ON ROAD SIDE
30UNDERTAKING FOR NO TREE CUTTING DURING LAYING FOR UNDER GROUND 11KV XLPE 185 MM CABLE ACTIVITY
31UNDERTAKING FOR VARIOUS POINTS
32PROJECT REPORT
33EDS REPLY-15-07-2021