  (i). Proposal No. : FP/RJ/OFC/45826/2020   (ii). Name of Project for which Forest Land is required : “Laying under Ground OFC along road Row from Village Rathora to Rajol , Tehsil- Semari ,District , Udaipur (Rajasthan)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : “Laying under Ground OFC along road Row from Village Rathora to Rajol , Tehsil- Semari ,District , Udaipur (Rajasthan) Total Route length of 14.040 KM   (iv). State : Rajasthan   (v). Category of the Proposal : Optical Fibre Cable   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 7.912   (viii). Area of forest land proposed for diversion(in ha.): 0.126   (ix). Non-forest land required for this project(in ha.): 0.5058   (x). Total period for which the forest land is proposed to be diverted(in years): 30
A-2. Details of User Agency
  (i). Name : JIO DIGITAL FIBER PVT LTD   (ii). Address1 : 1st floor, Anand Bhawan,SC Road, Jaipur   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Jaipur   (vi). Pin : 302001   (vii). Landmark : Near GPO   (viii). Email address : aashish.a.sharma@ril.com   (ix). Landline Telephone No. : 141-3554352   (x). Fax No. : 141-   (xi). Mobile No. : 9314401011   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Suresh Kumar Singhal   (ii). Middle Name: NIL   (iii). Last Name: NIL   (iv). Gender: Male   (v). Designation: AVP   (vi). Address 1: 1st floor, Anand Bhawan, SC Road, Jaipur   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Jaipur   (x). Tehsil: Jaipur   (xi). Pin: 302001   (xii). Landmark: Near GPO   (xiii). Email Address: ashwani.pundir0@gmail.com   (xiv). Landline Telephone No.: 141-3554352   (xv). Fax No.: NIL   (xvi). Mobile No.: 9414030898   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Udaipur (South) Territorial0.1260.5058
Total0.1260.5058
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Udaipur0.1260.5058
Total0.1260.5058
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Rathora00.09
2Torniya00.0459
3Bhorai0.11070.045
4Nalla Fla0.01530.0225
5Gorasar00.0855
6Tokar00.0855
7Rajol00.0864
Total 0.126 0.4608
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Laying for OFC Cable0.1260.5058
Total 0.126 0.5058
C. Maps of forest land proposed to be diverted
Division 1. : Udaipur (South) Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.126   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.126    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: Existing Road Row
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 4   (iii). Temporary Employment(Number of person-days): 30
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Details and status of previous project
2JDFPL IP Registration certificate
3JDFPL POA
4Project Note JDFPL
5Financial Approval
6BAR CHART
7CERTIFICATE FOR MINIMUM USE OF FOREST LAND
8CROSS SECTION OF OFC CABLE
9Details of Permanent Employment to be Generated
10Geo-Referenced Digital Map Showing for Required Forest land Coordinat and Proposed OFC route Alignmetn
11JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
12PROJECT REPORT
13Geo-Referenced Survey Of India Toposheet With Forest Land and Proposed OFC Route Alignment Scale 1 : 50000
14STATEMENT SHOWING DETAILS OF FORESTAREA PROPOSED FOR DIVERSION
15UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA AND WILDLIFE ANIMALS DURING LAYING OFC CALBLE
16UNDERTAKING FOR MUCK DISPOSAL DURING LAYING
17UNDERTAKING FOR NO CHANGE S IN STATUTORY POSITION OF DIVERTED FOREST LAND
18UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION
19UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
20UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
21UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING DURING LAYING OFC CALBLE
22UNDERTAKING FOR USE OF FOREST LAND
23Undertaking for various Points
24UNDERTAKING FOR WASTE MANAGEMENT DURING CONSTRUCTION
25UNDERTAKING OF FRA CERTIFICATE
26VILLAGE WISE AREA CALCULATION SHEET
27EDS Reply Jio route -13-10-2020
28Kindly share the acknowledge of hard copy deposited to compliance EDS. Authority is withdrawing the case EDS of which is not complied in 90 days. Br//