FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/MZ/ROAD/24010/2017   (ii). Name of Project for which Forest Land is required : Widening and upgradation of NH-54 to 2-Lane with paved shoulder and geometric improvements from Km 8.00 to Km 380.00 in the State of Mizoram (JICA Funded) Km 250.00 to Km 380.00 in Package 3 excluding 5.06 km in Lawngtlai City portion.   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The present configuration of road is varying from 3.75m to 5.5 m with earthen shoulder. NH-54 is the lifeline of the State of Mizoram linking its capital Aizawl in northern side at Km 8.00 to Tuipang in southern end at Km 380.00. In this JICA funded project, 372 Km road length is proposed to be wid   (iv). State : Mizoram   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 616759   (viii). Area of forest land proposed for diversion(in ha.): 11.18   (ix). Non-forest land required for this project(in ha.): 197.562   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : NHIDCL   (ii). Address1 : NHIDCL OFFICE,EDDIE KHAWLHRING BUILDING, NIKANG VENG, CP ROAD, TLANGNUAM, AIZAWL   (iii). Address2 : NIL   (iv). State : Mizoram   (v). District : Aizawl   (vi). Pin : 796005   (vii). Landmark : NEAR PLAYGROUND   (viii). Email address : aizawl.nhidcl@gmail.com   (ix). Landline Telephone No. : 11-23461603   (x). Fax No. : 11-   (xi). Mobile No. : 9414370651   (xii). Website (if any) : www.nhidcl.com   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: ASHOK   (ii). Middle Name: KUMAR   (iii). Last Name: SHRIVASTAVA   (iv). Gender: Male   (v). Designation: GM   (vi). Address 1: NHIDCL OFFICE, Project Monitoring Unit-Seling, Mizoram, C/o Tourist Lodge Thingsulthliah   (vii). Address 2: Near Power House on Hospital Road   (viii). State: Mizoram   (ix). District: Aizawl   (x). Tehsil: NIL   (xi). Pin: 796161   (xii). Landmark: Tourist Lodge Thingsulthliah   (xiii). Email Address: pmu.seling@nhidcl.com   (xiv). Landline Telephone No.: 389-2950166   (xv). Fax No.: NIL   (xvi). Mobile No.: 9818941494   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1ApprovedFP/MZ/ROAD/23965/2017No. 3-MZ C 076/2017-SHI/830-83111.61018 May 201820 Aug 2019
Total 11.61 0
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Lai Autonomous District Council4.8182.454
2.Mara Autonomous District Council6.37115.108
Total11.18197.562
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Lawngtlai4.8182.454
1.Saiha6.37115.108
Total11.18197.562
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Thingkah2.60.68
2Siakah1.9480.8
3Chawtlangpui0.2620.07
4Kalchaw "W"0.282.78
5Zero0.010.11
6Maubawk1.2051.483
7Theiva3.511.206
8Theiri1.3650.36
Total 11.18 7.489
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road Ch 280/77 to 282/1392.60110.6845
2Road Ch 295/24 to 296.3861.94820.8022
3Road Ch 313/220 to 313/3580.26220.069
4Road Ch 324/770 to 324/7270.00810.0567
5Road Ch 324/994 to 325/2000.04120.4532
6Road Ch 325/400 to 325/4330.00990.0693
7Road Ch 325/550 to 325/5900.0060.009
8Road Ch 325/600 to 325/6770.011550.17325
9Road Ch 325/920 to 326/0100.0270.189
10Road Ch 326/300 to 326/3540.00810.1215
11Road Ch 327/500 to 327/5400.0060.09
12Road Ch 327/600 to 327/6600.0180.126
13Road Ch 328/600 to 328/6300.0060.066
14Road Ch 328/880 to 328/9800.030.21
15Road Ch 329/980 to 330/1050.018750.28125
16Road Ch 330/520 to 330/6400.030.258
17Road Ch 330/900 to 331.0030.03090.2163
18Road Ch 331/100 to 331/2100.01650.2475
19Road Ch 331/950 to 332.0100.0120.132
20Road Ch 338/550 to 338/6000.010.11
21Road Ch 342/100 to 342/4400.5780.238
22Road Ch 342/200 to 342/2800.020.172
23Road Ch 342/550 to 342/8700.5120.256
24Road Ch 343/100 to 343.4800.0950.817
25Road Ch 354/600 to 354/7350.2160.108
26Road Ch 358/650 to 359/3701.3680.36
27Road Ch 355/000 to 356/8303.2564851.135515
Total 11.146985 7.451215
C. Maps of forest land proposed to be diverted
Division 1. : Mara Autonomous District Council
  (i). Area of forest land proposed to be diverted(in ha.) : 6.37   (ii). Nature of the Project: Linear   (b). No. of Segments : Eight
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.29    View File
2.0.578    View File
3.0.02    View File
4.0.512    View File
5.0.095    View File
6.0.216    View File
7.1.36    View File
8.3.29    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Lai Autonomous District Council
  (i). Area of forest land proposed to be diverted(in ha.) : 4.81   (ii). Nature of the Project: Linear   (b). No. of Segments : Three
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.2.6    View File
2.1.94    View File
3.0.262    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: NIL
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 100   (iii). Temporary Employment(Number of person-days): 50000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1MAP-LAWNGTLAI
2MAP-SAIHA
3LAWNGTLAI NPV
4SAIHA NPV
5TS-LAWNGTLAI
6TS-SAIHA
7TECHNICAL REPORT
8PERMISSION FOR SPLITTING