FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UP/WATER/32379/2018   (ii). Name of Project for which Forest Land is required : AGRA WATER SUPPLY (GANGA JAL) PROJECT   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Additional Forest Land Necessitated for movement of machinery, stacking of excavated earth, required for laying of 1600 mm dia pipe line from bridge on river Yamuna near Kailash Temple to Jeoni Mandi and Sikandra Waterworks at Agra.   (iv). State : Uttar Pradesh   (v). Category of the Proposal : Drinking Water   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 288792   (viii). Area of forest land proposed for diversion(in ha.): 10.22375   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 30
A-2. Details of User Agency
  (i). Name : UTTAR PRADESH JAL NIGAM   (ii). Address1 : Project Manager, Gangajal Project Unit, U.P. Jal Nigam, 4/4, Sanjay Place Agra   (iii). Address2 : NIL   (iv). State : Uttar Pradesh   (v). District : Agra   (vi). Pin : 282002   (vii). Landmark : Near Vikas Bhawan   (viii). Email address : gangajalproject_upjn@hotmail.com   (ix). Landline Telephone No. : 562-2521880   (x). Fax No. : 562-2521880   (xi). Mobile No. : 9455943303   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State PSU
A-3. Details of Person Making Application
  (i). First Name: rajesh   (ii). Middle Name: kumar   (iii). Last Name: pankaj   (iv). Gender: Male   (v). Designation: projectmanager   (vi). Address 1: Gangajal Project Unit, U.P. Jal Nigam, 4/4, Sanjay Place, Agra   (vii). Address 2: NIL   (viii). State: Uttar Pradesh   (ix). District: Agra   (x). Tehsil: Agra   (xi). Pin: 282002   (xii). Landmark: Near Vikas Bhawan   (xiii). Email Address: gangajalproject_upjn@hotmail.com   (xiv). Landline Telephone No.: 562-2521880   (xv). Fax No.: 05622521880   (xvi). Mobile No.: 9455943303   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Social Forestry Division Agra10.223750
Total10.223750
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Agra10.223750
Total10.223750
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bainpur4.091750
2Babarpur2.50950
3Mau3.62250
Total 10.22375 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Bridge on River Yamuna to Sikandra Waterworks2.04750
2Bridge on River Yamuna to Jeoni Mandi Waterworks8.176250
Total 10.22375 0
C. Maps of forest land proposed to be diverted
Division 1. : Social Forestry Division Agra
  (i). Area of forest land proposed to be diverted(in ha.) : 10.22375   (ii). Nature of the Project: Linear   (b). No. of Segments : Two
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.2.0475    View File
2.8.17625    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: No alternate route available.
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 3600
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: Two
District 1. : Firozabad
  (a). Village: Kurri Koopa   (b). Area(in ha.): 3.8588   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 616 as per Khatoni atteched   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 2. : Firozabad
  (a). Village: Rudhau Mustkil   (b). Area(in ha.): 6.365   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 1074 Ga As Per Khatoni Atteched   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Project Profile Attached.
2Undertaking for Compensatory Afforestation Amount is Attached.
3Undertaking for NPV Amount is Attached.
4Certificate of Minimum Land Use is Attached.
5Land Schedule of Forest Land is Attached.
6Standard Condition is Attached.
7Muck Disposal Plan is Attached.
8Certificate of Trees standing is Attached.
9Project Sanction Letter is Attached.
10Strip plan of proposed Land is Attached.
11Google Map Proposed Land is Attached.
12Beneficial Population/Village from Project is Attached.
13Additional NPV
14Penal CA
15Premium and Lease Rent
16GOI and GO UP Condition Undertaking