FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UP/TRANS/156518/2022   (ii). Name of Project for which Forest Land is required : 132 KV D/C Talheri TSS (DFCCIL)- Jarauda Nara TSS (Railway) Transmission line falling in Saharanpur & Muzaffarnagar District (Uttar Pradesh)”. (Total Line Length – 47.826 Km).   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : 132 KV D/C Talheri TSS (DFCCIL)- Jarauda Nara TSS (Railway) Transmission line falling in Saharanpur & Muzaffarnagar District (Uttar Pradesh)”. (Total Line Length – 47.826 Km).   (iv). State : Uttar Pradesh   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 26000   (viii). Area of forest land proposed for diversion(in ha.): 0.1701   (ix). Non-forest land required for this project(in ha.): 128.9601   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LIMITED   (ii). Address1 : 3rd Floor, Shri Bala Jee Commercial complex, Plot No. C-2, Pocket-B, Sector-1, Ved Vyas Puri, By Pass NH-58, Meerut-250002   (iii). Address2 : NIL   (iv). State : Uttar Pradesh   (v). District : Meerut   (vi). Pin : 250002   (vii). Landmark : NIL   (viii). Email address : vksharma1@dfcc.co.in   (ix). Landline Telephone No. : 0--   (x). Fax No. : 0-   (xi). Mobile No. : 9717636853   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: Mahaveer   (ii). Middle Name: NIL   (iii). Last Name: Singh   (iv). Gender: NIL   (v). Designation: Dy.Project Manager ( Electrica   (vi). Address 1: 3rd Floor, Shri Bala Jee Commercial complex, Plot No. C-2, Pocket-B, Sector-1, Ved Vyas Puri, By Pass NH-58, Meerut-250002   (vii). Address 2: NIL   (viii). State: Uttar Pradesh   (ix). District: Meerut   (x). Tehsil: NIL   (xi). Pin: 250002   (xii). Landmark: NIL   (xiii). Email Address: msingh@dfcc.co.in   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 9456797644   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Social Forestry Division Saharanpur061.9272
2.Social Forestry Division Muzaffarnagar0.170167.0329
Total0.1701128.9601
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Saharanpur061.9272
1.Muzaffarnagar0.170167.0329
Total0.1701128.9601
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Sakhan04.671
2Begampur04.1472
3Nanhera04.4199
4Khajuri03.537
5Labkari02.106
6Bhaila04.0284
7Kulsath09.7794
8Imaliya010.1034
9Rankhandi05.2677
10Pawti Khurd05.7591
11Aakhlor04.7223
12Badhai Kalan03.3858
13Hosiyarpur04.077
14Badhaikhurd02.4732
15Kasiyara04.1688
16Kacholi02.781
17Kalyana04.1283
18Dadheru khurd03.8367
19Lakadsandha01.7145
20Salempur02.5029
21Pinna0.08376.939
22Kinauni04.2471
23Mirapur03.0348
24Sanjhak03.1158
25Seemli04.1391
26Lechhera05.0436
27Jarouda05.4324
28Begrajpur04.2795
29Bahadarpur0.08645.1192
Total 0.1701 128.9601
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1132 KV D/C Talheri TSS (DFCCIL)- Jarauda Nara TSS0.1701128.9601
Total 0.1701 128.9601
C. Maps of forest land proposed to be diverted
Division 1. : Social Forestry Division Muzaffarnagar
  (i). Area of forest land proposed to be diverted(in ha.) : 0.1701   (ii). Nature of the Project: Linear   (b). No. of Segments : Two
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.0837    View File
2.0.0864    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Social Forestry Division Saharanpur
  (i). Area of forest land proposed to be diverted(in ha.) : 0   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 10   (iii). Temporary Employment(Number of person-days): 250
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Certificate for minimum use of forest land
2Complete Alignment Tower Co-ordinate
3Disposal Management Plan
4Justification For Employment
5MOU with DFCCIL and Power Grid
6Statement showing details of Tower in Forest and Non forest land
7Project Sanction letters
8Under taking for No Change in Statutory Position Of Diverted forest Land
9Muck Disposal Certificate
10Undertaking for conversion of Flora Fauna During Construction Transmission Line
11Undertaking For Entire Tree Transplant ETT
12undertaking for medicinal Plants
13Undertaking For NOC From Owner Departments
14Undertaking for payment of Additional Net Present Valve (NPV) of Forest Area
15Undertaking for payment of cost of compensatory afforestation
16Undertaking for Payment of NET Present valve NPV of forest Area
17Undertaking for Two Time Degraded Forest Land
18Undertaking for use of any material from surrounded forest land during construction of transmission line
19Undertaking of Forest Land
20Undertaking Of Minimum Cutting Tree
21Undertaking regarding Non Violation Of Forest Conservation ACT 1980
22उ ।प्र । शासन वन विभाग द्वारा मानक सर्ते
23प्रपत्र भाग 2 के क्रम संख्या -7 के उप बिन्दु -XI & XII से संबन्धित प्रमाण पत्र
24मुख्य वन संरछक नोडल अधिकारी उ।प्र। लखनऊ के पत्रांक 343.11 सी दिनांक 14.08.2020 द्वारा प्रस्तावित परीछन से संबन्धित प्रमाण पत्र
25योजना आयोग द्वारा गठित टास्क फोर्स की सतुस्तियों के मान्य होने संबंधी प्रमाण पत्र
26राष्ट्रिय उद्यान वन्य जीव अभयरण आदि के भाग हिस्सा के सम्बन्ध मे प्रमाण पत्र
27वन स्वरूप छेत्र से संबन्धित प्रमाण पत्र
28वेकल्पिक भूमि से संबन्धित प्रमाण पत्र
29PF Forest Land Gazette notification duly signed by DFO Muzaffarnagar
30COMPARATIVE STATEMENT OF ALTERNATIVE ROUTE ALIGNMENT ANALYSIS
31STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION
32STATEMENT SHOWING DETAILS OF NON FOREST AREA
33NODAL OFFICER CHECK LIST DATED 24 -02-2022 FOR ONLINE APPLICATION PART 1 DULY SIGNED
34EDS Replied Hard copies submission Letter Receiving Acknowledgement DFO and DM Saharanpur and Muzaffarnagar
35EDS Reply by user agency letter dt 23 8 2022
36Re submit EDS Reply by user agency letter dt 23 8 2022
37EDS Reply by user agency letter dt 23 8 2022 Re submit
38EDS Reply by user agency vide letter dated 21 April 2023
39EDS Reply by User agency