FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/UP/TRANS/156518/2022
(ii). Name of Project for which Forest Land is required :
132 KV D/C Talheri TSS (DFCCIL)- Jarauda Nara TSS (Railway) Transmission line falling in Saharanpur & Muzaffarnagar District (Uttar Pradesh)”. (Total Line Length – 47.826 Km).
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
132 KV D/C Talheri TSS (DFCCIL)- Jarauda Nara TSS (Railway) Transmission line falling in Saharanpur & Muzaffarnagar District (Uttar Pradesh)”. (Total Line Length – 47.826 Km).
(iv). State :
Uttar Pradesh
(v). Category of the Proposal :
Transmission Line
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
26000
(viii). Area of forest land proposed for diversion(in ha.):
0.1701
(ix). Non-forest land required for this project(in ha.):
128.9601
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LIMITED
(ii). Address1 :
3rd Floor, Shri Bala Jee Commercial complex, Plot No. C-2, Pocket-B, Sector-1, Ved Vyas Puri, By Pass NH-58, Meerut-250002
(iii). Address2 :
NIL
(iv). State :
Uttar Pradesh
(v). District :
Meerut
(vi). Pin :
250002
(vii). Landmark :
NIL
(viii). Email address :
vksharma1@dfcc.co.in
(ix). Landline Telephone No. :
0--
(x). Fax No. :
0-
(xi). Mobile No. :
9717636853
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Central PSU
A-3.
Details of Person Making Application
(i). First Name:
Mahaveer
(ii). Middle Name:
NIL
(iii). Last Name:
Singh
(iv). Gender:
NIL
(v). Designation:
Dy.Project Manager ( Electrica
(vi). Address 1:
3rd Floor, Shri Bala Jee Commercial complex, Plot No. C-2, Pocket-B, Sector-1, Ved Vyas Puri, By Pass NH-58, Meerut-250002
(vii). Address 2:
NIL
(viii). State:
Uttar Pradesh
(ix). District:
Meerut
(x). Tehsil:
NIL
(xi). Pin:
250002
(xii). Landmark:
NIL
(xiii). Email Address:
msingh@dfcc.co.in
(xiv). Landline Telephone No.:
0-
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9456797644
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Social Forestry Division Saharanpur
0
61.9272
2.
Social Forestry Division Muzaffarnagar
0.1701
67.0329
Total
0.1701
128.9601
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Saharanpur
0
61.9272
1.
Muzaffarnagar
0.1701
67.0329
Total
0.1701
128.9601
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Sakhan
0
4.671
2
Begampur
0
4.1472
3
Nanhera
0
4.4199
4
Khajuri
0
3.537
5
Labkari
0
2.106
6
Bhaila
0
4.0284
7
Kulsath
0
9.7794
8
Imaliya
0
10.1034
9
Rankhandi
0
5.2677
10
Pawti Khurd
0
5.7591
11
Aakhlor
0
4.7223
12
Badhai Kalan
0
3.3858
13
Hosiyarpur
0
4.077
14
Badhaikhurd
0
2.4732
15
Kasiyara
0
4.1688
16
Kacholi
0
2.781
17
Kalyana
0
4.1283
18
Dadheru khurd
0
3.8367
19
Lakadsandha
0
1.7145
20
Salempur
0
2.5029
21
Pinna
0.0837
6.939
22
Kinauni
0
4.2471
23
Mirapur
0
3.0348
24
Sanjhak
0
3.1158
25
Seemli
0
4.1391
26
Lechhera
0
5.0436
27
Jarouda
0
5.4324
28
Begrajpur
0
4.2795
29
Bahadarpur
0.0864
5.1192
Total
0.1701
128.9601
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
132 KV D/C Talheri TSS (DFCCIL)- Jarauda Nara TSS
0.1701
128.9601
Total
0.1701
128.9601
C.
Maps of forest land proposed to be diverted
Division 1. : Social Forestry Division Muzaffarnagar
(i). Area of forest land proposed to be diverted(in ha.) :
0.1701
(ii). Nature of the Project:
Linear
(b). No. of Segments :
Two
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.0837
View File
2.
0.0864
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Social Forestry Division Saharanpur
(i). Area of forest land proposed to be diverted(in ha.) :
0
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
10
(iii). Temporary Employment(Number of person-days):
250
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Certificate for minimum use of forest land
2
Complete Alignment Tower Co-ordinate
3
Disposal Management Plan
4
Justification For Employment
5
MOU with DFCCIL and Power Grid
6
Statement showing details of Tower in Forest and Non forest land
7
Project Sanction letters
8
Under taking for No Change in Statutory Position Of Diverted forest Land
9
Muck Disposal Certificate
10
Undertaking for conversion of Flora Fauna During Construction Transmission Line
11
Undertaking For Entire Tree Transplant ETT
12
undertaking for medicinal Plants
13
Undertaking For NOC From Owner Departments
14
Undertaking for payment of Additional Net Present Valve (NPV) of Forest Area
15
Undertaking for payment of cost of compensatory afforestation
16
Undertaking for Payment of NET Present valve NPV of forest Area
17
Undertaking for Two Time Degraded Forest Land
18
Undertaking for use of any material from surrounded forest land during construction of transmission line
19
Undertaking of Forest Land
20
Undertaking Of Minimum Cutting Tree
21
Undertaking regarding Non Violation Of Forest Conservation ACT 1980
22
उ ।प्र । शासन वन विभाग द्वारा मानक सर्ते
23
प्रपत्र भाग 2 के क्रम संख्या -7 के उप बिन्दु -XI & XII से संबन्धित प्रमाण पत्र
24
मुख्य वन संरछक नोडल अधिकारी उ।प्र। लखनऊ के पत्रांक 343.11 सी दिनांक 14.08.2020 द्वारा प्रस्तावित परीछन से संबन्धित प्रमाण पत्र
25
योजना आयोग द्वारा गठित टास्क फोर्स की सतुस्तियों के मान्य होने संबंधी प्रमाण पत्र
26
राष्ट्रिय उद्यान वन्य जीव अभयरण आदि के भाग हिस्सा के सम्बन्ध मे प्रमाण पत्र
27
वन स्वरूप छेत्र से संबन्धित प्रमाण पत्र
28
वेकल्पिक भूमि से संबन्धित प्रमाण पत्र
29
PF Forest Land Gazette notification duly signed by DFO Muzaffarnagar
30
COMPARATIVE STATEMENT OF ALTERNATIVE ROUTE ALIGNMENT ANALYSIS
31
STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION
32
STATEMENT SHOWING DETAILS OF NON FOREST AREA
33
NODAL OFFICER CHECK LIST DATED 24 -02-2022 FOR ONLINE APPLICATION PART 1 DULY SIGNED
34
EDS Replied Hard copies submission Letter Receiving Acknowledgement DFO and DM Saharanpur and Muzaffarnagar
35
EDS Reply by user agency letter dt 23 8 2022
36
Re submit EDS Reply by user agency letter dt 23 8 2022
37
EDS Reply by user agency letter dt 23 8 2022 Re submit
38
EDS Reply by user agency vide letter dated 21 April 2023
39
EDS Reply by User agency
Print