FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UP/ROAD/146875/2021   (ii). Name of Project for which Forest Land is required : Upgradation of Sitapur -Pratap nagar of NH-330D in the State of Uttar Pradesh to Two/ Four Lane with Paved Shoulder Configuration (Package-01, From Ch: 0+000 to 38+800) under forest division SItapur and Forest division Hardoi   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Diversion of forest land for Upgradation of Sitapur -Pratapnagar of NH-330D in the State of Uttar Pradesh to Two/ Four Lane with Paved Shoulder Configuration (Package-01, From Ch: 0+000 to 38+800) under forest division Sitapur and Forest division Hardoi.   (iv). State : Uttar Pradesh   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 46300   (viii). Area of forest land proposed for diversion(in ha.): 36.987   (ix). Non-forest land required for this project(in ha.): 27   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : EXECUTIVE ENGINEER   (ii). Address1 : National Highway Division, PWD, Kanpur   (iii). Address2 : 12/476 Macrobert ganj, Kanpur   (iv). State : Uttar Pradesh   (v). District : Kanpur Nagar   (vi). Pin : 208001   (vii). Landmark : Near Chunniganj Bas Station   (viii). Email address : nhdivisionkanpur2012@gmail.com   (ix). Landline Telephone No. : 512-2304404   (x). Fax No. : NIL   (xi). Mobile No. : 9956499319   (xii). Website (if any) : uppwd.gov.in.   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Awadhesh   (ii). Middle Name: Kumar   (iii). Last Name: Singh   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: National Highway Division, PWD, Kanpur   (vii). Address 2: 12/476 Macrobert ganj, Kanpur   (viii). State: Uttar Pradesh   (ix). District: Kanpur Nagar   (x). Tehsil: Kanpur   (xi). Pin: 208001   (xii). Landmark: Near Chunniganj Bas Station   (xiii). Email Address: nhdivisionkanpur2012@gmail.com   (xiv). Landline Telephone No.: 512-2304404   (xv). Fax No.: 05122304404   (xvi). Mobile No.: 8318092106   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Social Forestry Division Sitapur28.70727
2.Social Forestry Division Hardoi8.280
Total36.98727
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Sitapur28.70727
1.Hardoi8.280
Total36.98727
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Humaupur0.70.975
2Karmasenpur5.250.763
3Jarathpur3.10.305
4Narsindholi3.985.05
5Ajijpur5.40
6Sahsiya Mau4.2250
7Pratap Nagar8.280.135
8Khatkari5.390.83
9Sarai Bhatt0.1171.042
10Kariya Mau0.1357
11Ramkot0.218
12Jawahirpur0.22.9
Total 36.987 27
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road Construction36.98727
Total 36.987 27
C. Maps of forest land proposed to be diverted
Division 1. : Social Forestry Division Sitapur
  (i). Area of forest land proposed to be diverted(in ha.) : 28.707   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.28.707    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Social Forestry Division Hardoi
  (i). Area of forest land proposed to be diverted(in ha.) : 8.28   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.8.28    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: There is no need for aletrnative.
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 500   (iii). Temporary Employment(Number of person-days): 650000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Central Govt. Project
Additional information Details
Documents
S.No Documents
Remarks
1Demand letter
2Details note on project
3For Payment of NPV value of forest area
4For payment of additional Net Present Value of forest Area
5Certification of minimum use of land
6payment of cost of CA
7undertaking for no muck generation and Disposal
8Undertaking for no wild area
9Undertaking for non-starting of any activity without sanction from competent authority
10Undertaking for other feasible alternative of alignmengt and Diversion of barest Minimum Forest land
11Area Calculation sheet of sitapur DIVISION
12Area calculation sheet of Hardoi Division
13Total Area calculation sheet
14Undertaking for FRA certificate
15Document Submission Letter
16Muck Disposal Plan For the Project
17Undertaking for Entire Tree Plantation
18Entire Tree Plantation
19Gazette Notification
20Compliance letter dt. 16.03.2022
21Standard Conditions
22Undertaking for NOC of land owning agency
23Project Sanctioned letter
24Acknowledgements of DM Sitapur with seal and others
25Joint trees enumeration list, Sitapur Division
26Joint trees enumeration list, Hardoi Division
27Standard Cross Section
28Tipical Cross Section
29Minimum Trees to be Felled
30Compliance letter dated 27th February 2023
31Compliance Letter dated 10 April 2023
32Compliance letter 8th August 2023
33Compliance Letter 15 Dec 2023
34Plantation Scheme for Roadside Plantation
35User Agecny compliance letter 6th Feb 2024