FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UP/RAIL/47261/2020   (ii). Name of Project for which Forest Land is required : Diversion Protected/ Reserve Forest Land for Jawaharpur Thermal Power Project Malawan, Etah   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Diversion of 0.3683Hec Protected and 3.8386 Hec. Reserve Forest Land for RAIL NETWORK SYSTEM from Etah Station TO Jawaharpur Thermal Power Project Malawan, Etah   (iv). State : Uttar Pradesh   (v). Category of the Proposal : Railway   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 76769   (viii). Area of forest land proposed for diversion(in ha.): 4.2069   (ix). Non-forest land required for this project(in ha.): 88.002   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : JAWAHARPUR VIDYUT UTPADAN NIGAM LTD   (ii). Address1 : 7th Floor,Shakti Bhawan Extn,14Ashok Marg,Lucknow   (iii). Address2 : NIL   (iv). State : Uttar Pradesh   (v). District : Lucknow   (vi). Pin : 226001   (vii). Landmark : NIL   (viii). Email address : ee.ccd.jawaharpur@uprvunl.org   (ix). Landline Telephone No. : 562-4003705   (x). Fax No. : 562-   (xi). Mobile No. : 9415900135   (xii). Website (if any) : uprvunl.org   (xiii). Legal status of User Agency : State PSU
A-3. Details of Person Making Application
  (i). First Name: Ravi   (ii). Middle Name: Shanker   (iii). Last Name: Rajeev   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: CCD 1 Jawaharpur Thermal Power Project,Malawan,Etah   (vii). Address 2: NIL   (viii). State: Uttar Pradesh   (ix). District: Etah   (x). Tehsil: Etah   (xi). Pin: 207001   (xii). Landmark: NIL   (xiii). Email Address: sumant.yadav123@gmail.com   (xiv). Landline Telephone No.: 562-4003705   (xv). Fax No.: NIL   (xvi). Mobile No.: 8979849329   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Social Forestry Division Etah4.206988.002
Total4.206988.002
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Etah4.206988.002
Total4.206988.002
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Etah Dehat04.8975
2Lalgarhi06.0937
3Rampur Ghanshyam04.879
4Uddanpur Ramnagar02.556
5Narhara06.4146
6Babarpur01.8481
7Muktyalpur03.312
8Kishanpur Loya01.5987
9Chacharpur07.7228
10Nehchalpur Loya05.7315
11Marzadpur00.7492
12Jeeshukhpur Etah02.088
13Bhatmai0.6161.7508
14Shivsinghpur Urf Nagla Nizam04.2433
15Barthari05.3079
16Nigoh hasanpur013.6766
17sheetalpur3.22262.9421
18Loyabadshahpur ( peetam Singh)0.23284.3829
19Keelermau0.13557.8073
Total 4.2069 88.002
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Reserved forest land3.83860
2Protected Forest Land0.36830
3Non Forest Land088.002
Total 4.2069 88.002
C. Maps of forest land proposed to be diverted
Division 1. : Social Forestry Division Etah
  (i). Area of forest land proposed to be diverted(in ha.) : 4.2069   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.4.2069    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: no alternate
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 2000   (iii). Temporary Employment(Number of person-days): 3500000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Etah
  (a). Village: Nigoh Hasanpur   (b). Area(in ha.): 3.8386   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 156na   (e). Present owner: User Agency   (f). Copy of Ownership proof:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1calculation of NPV Levies
2Undertaking of abiding rules and regulation
3Certificate of approved layout plan
4NOC letter from Chief Engineer Irrigation and Water resources
5Gazette notification of forest Department for Protected and reserved land
6Job not working certificate
7Land acquisition approval from Commissioner Aligarh
8MOEF Letter
9Muck Disposal
10NOC from NHAI
11NOC from PWD
12Project Report
13Project Sanction letter
14standard condition certificate
15Undertaking for NPV
16undertaking for use of Forest Land
17Undertaking for CA
18Zila Panchayat NOC Letter
19Area calculation
20project sanction report