FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/UK/WATER/38629/2019
(ii). Name of Project for which Forest Land is required :
Construction of Rishikesh Dehat Water Supply Scheme (Peri Urban) Funded by World Bank
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
This proposed program is to be implemented by Uttarakhand Jal Sansthan . Objective of the program is to provide an adequate, continuous water supply on 24*7 basis with 12 m terminal pressure and metered drinking water supply to Rishikesh dehat peri urban households.
(iv). State :
Uttarakhand
(v). Category of the Proposal :
Drinking Water
(vi). Shape of forest land proposed to be diverted :
Non Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
5917
(viii). Area of forest land proposed for diversion(in ha.):
0.372
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
JAL BHAWAN UTTARAKHAND JAL SANSTHAN
(ii). Address1 :
Nehru Colony, Dehradun
(iii). Address2 :
NIL
(iv). State :
Uttarakhand
(v). District :
Dehradun
(vi). Pin :
248007
(vii). Landmark :
Nehru Colony
(viii). Email address :
eemdujs@rediffmail.com
(ix). Landline Telephone No. :
0-00000
(x). Fax No. :
0-
(xi). Mobile No. :
9410365488
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
Arun
(ii). Middle Name:
Vikram Singh
(iii). Last Name:
Rawat
(iv). Gender:
Male
(v). Designation:
AssitantEngineer
(vi). Address 1:
F.I.U. Maintenance Division Uttarakhand Jal Sansthan Dehradun
(vii). Address 2:
NIL
(viii). State:
Uttarakhand
(ix). District:
Dehradun
(x). Tehsil:
Dehradun
(xi). Pin:
248001
(xii). Landmark:
Near Prasar Bharti office dehradun
(xiii). Email Address:
avsrawat@gmail.com
(xiv). Landline Telephone No.:
135-2671940
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9411135841
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Dehradun
0.372
0
Total
0.372
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Dehradun
0.372
0
Total
0.372
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Rishikesh (Nagar Nigam)
0.372
0
Total
0.372
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Overhead Tank
0.171
0
2
Chambers
0.0056
0
3
Rain Water Harvesting
0.015
0
4
Pipe Line
0.0189
0
5
Security Work
0.1098
0
6
Operator Duty Room
0.01
0
7
Scada Control Room
0.01
0
8
Pump House
0.0317
0
Total
0.372
0
C.
Maps of forest land proposed to be diverted
Division 1. : Dehradun
(i). Area of forest land proposed to be diverted(in ha.) :
0.372
(ii). Nature of the Project:
Non Linear
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
0.372
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
0
(iii). Temporary Employment(Number of person-days):
2000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Authority Letter
2
Prativedan/Justification
3
Administrative & Financial Sanction
4
Joint Inspection Report
5
Toposheet
6
Digital Map
7
Vaikalpik Samrekhan related
8
Tulnatmak Vivran related
9
Minimum Demand of Forest Land
10
Land Schedule
11
Project Length Width
12
Bar Chart
13
Working Start related
14
Effected Trees related documents
15
Effected Trees List & Evaluation
16
Banj Trees Cutting related
17
Minimum Trees Cutting related
18
Not a Part of National Park/Wildlife Sanctury
19
FRA & Gram Sabha related Documents
20
Geologist Report
21
Compliance of Geologist Advises
22
Task Force Related Certificate
23
Norm Conditions
24
Religious or Historical Place related Document
25
Wild Animals or Vegetation damage related Document
26
Kerosene or Gas related Document
27
Benefiting Families or population related Document
28
NPV Calculation
29
NPV Rates related
30
Authority Letter
31
Point wise Reply
32
Pointwise reply
33
Pointwise Reply
34
EDS Reply
35
Aerial Distance Certificate
Print