FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/TRANS/47915/2020   (ii). Name of Project for which Forest Land is required : Tower shifting of 132 KV Chila-Nazibabad Transmission Line   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : For up gradation of NH-74, a underpass is being constructed by NH near tower No 33-34 , due to which it is essential to shift tower no 34 to get height for transmission line as per guidelines of Indian Electricity Act 2003.   (iv). State : Uttarakhand   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 188   (viii). Area of forest land proposed for diversion(in ha.): 0.3969   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 30
A-2. Details of User Agency
  (i). Name : POWER TRANSMISSION CORPORATION OF UTTRAKHAND LTD.   (ii). Address1 : Assistant Engineer, 132 KV Sub-station   (iii). Address2 : Jashodharpur, Kotdwar   (iv). State : Uttarakhand   (v). District : Pauri Garhwal   (vi). Pin : 246149   (vii). Landmark : M/s Sidhabali Industry   (viii). Email address : ramendra.hw@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 7088117525   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State PSU
A-3. Details of Person Making Application
  (i). First Name: Ramendra   (ii). Middle Name: NIL   (iii). Last Name: Kumar   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: Assistant Engineer, 132 KV Sub-station   (vii). Address 2: Jashodharpur, Kotdwar   (viii). State: Uttarakhand   (ix). District: Pauri Garhwal   (x). Tehsil: Kotdwara   (xi). Pin: 246149   (xii). Landmark: M/s Sidhabali Industry   (xiii). Email Address: ramendra.hw@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 7088117525   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Haridwar0.39690
Total0.39690
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Haridwar0.39690
Total0.39690
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Shyampur rang0.39690
Total 0.3969 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Transmission Line0.39690
Total 0.3969 0
C. Maps of forest land proposed to be diverted
Division 1. : Haridwar
  (i). Area of forest land proposed to be diverted(in ha.) : 0.3969   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.3969    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 1000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Prativedan
2Form_A_Part_1
3Form_A_Part_2
4Administrative_Financial_Sanction
5Joint_Inspection_Report
6Land_Schedule
7Length_Width
8Site_Inspection_Report
9Trees_to_be_Felled
10No_Alternative_Land
11Not_a_Part_of_National_Park
12No_Historical_Relegious_Place
13Certificate_reg_site_specific_project
14Standard_Conditions
15Task_Force_certficate
16Certificate_reg_Geologist_and_Taskforce_reccomandation
17Certificate_reg_Muck_Disposal
18Certificate_reg_demarcation
19NPV_Calculation
2010_Time_Tree_Plantation_Scheme
21Undertaking_reg_NPV_payment
22Undertaking_reg_Environmental_clearance
23Undertaking_reg_Alternative_Fuel
24Undertaking_reg_No_harm_to_Wildlife
25Vacant_area_plantation_scheme
26Undertaking_reg_cost_of_land_lease_rent
27Route_Alignment_of_T L
28Certificate_reg_Oak_Trees
29Work_Not_Started
30Digital_Map
31Geo_Reference_Map
32FRA_2006
33Justification_1
34Undertaking_reg_plantation