FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/9429/2015   (ii). Name of Project for which Forest Land is required : Construction Of Rathi to Bora Village Motor Road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The road will give connectivity to the Rathi and Bora villagers to main road of Tanakpur twaghat Motor Road. Lenght of road is 2.00 Km   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 25.2   (viii). Area of forest land proposed for diversion(in ha.): 0.275   (ix). Non-forest land required for this project(in ha.): 1.575   (x). Total period for which the forest land is proposed to be diverted(in years): 50
A-2. Details of User Agency
  (i). Name : CONSTRUCTION DIVISION PWD ASKOTE   (ii). Address1 : cd pwd askote   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Pithoragarh   (vi). Pin : 262501   (vii). Landmark : NIL   (viii). Email address : eepwdaskote@gmail.com   (ix). Landline Telephone No. : 5964-238724   (x). Fax No. : 5964-0   (xi). Mobile No. : 9412977325   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Suman   (ii). Middle Name: NIL   (iii). Last Name: Bora   (iv). Gender: Female   (v). Designation: Junior engineer   (vi). Address 1: ee cd pwd askote   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Pithoragarh   (x). Tehsil: Didihat   (xi). Pin: 262501   (xii). Landmark: NIL   (xiii). Email Address: eepwdaskote@gmail.com   (xiv). Landline Telephone No.: 5964-238724   (xv). Fax No.: NIL   (xvi). Mobile No.: 8171630275   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pithoragarh0.2751.575
Total0.2751.575
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pithoragarh0.2751.575
Total0.2751.575
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Rathi0.2751.575
Total 0.275 1.575
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road0.2251.575
2Muck disposal0.050
Total 0.275 1.575
C. Maps of forest land proposed to be diverted
Division 1. : Pithoragarh
  (i). Area of forest land proposed to be diverted(in ha.) : 0.275   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.275    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 2200
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
12-2 Admistrative&Finacial
22-3 Preliminary joint Inspection Report
32-4 Compaerative Chart
42-5 DM Crt-Alternate suitable non-forest land
52-6 Land schedule
62-7 Category wise Land
72-8 Barchart
82-13 Road side gap filling Plantation
92-15 Details of tree with name
102-16 Felling Oak trees
112-18 Cert of felling minimum Trees
122-19 Muck Disposal
132-20 National Park
142-21 Cert of CCA 10km
152-23 FC Act 1980 reg
162-24 NOC Gram Sabhas
172-27 Cert Work not start
182-28 Geologist Report
192-29 Task Force report
202-30 Standard Condition
212-31 Geologist condition to Taskforce cert
222-32 No Historical monumental
232-33 No Animal effected
242-34 LPG kerosene
252-35 Benefited villages
262-36 Calculation cert of NPV
272-37 Increasing Payment Of NPV
282-40 Demarcation of land diverted (Rcc)
292-41 Cost for dimarcation of work(RCC)
302-43 Check List
31Non Revenue Forest(Ownersip proof)
322-1 Short narrative
33Rathi AcknowledgementSlip
34Noddel officer dehradun receiving
35Objection Removed as pr letter no Misc/II/ROC/COP/1/2013/1846 Date 6/11/015
36letter no Misc/II/ROC/COP/1/2013/1846 Date 6/11/015
37Rathi nation distance
38Rathi ojection letter
39obj. removed letter 18-06-2018
40obj. removed letter 27-07-2018
41obj. removed letter 16-12-2018
42Objection Removed on dated 28-6-2019
43Objection removed on dated 31-07-2019
442-21 Aerial Distance Cert of CCA 10km Rathi Bora Gaon
45Objection Removed on dated 14-07-2020
46Rathi Boragaon objection removed letter 11-12-2020