FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/8895/2014   (ii). Name of Project for which Forest Land is required : Construction of Mavadhar to Chamk Motor road under Distt Sector   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The length of this road is 2 Km. This road is starts from Km 18 of Rudraprayag-Pokhari Motor road and will connect village Chamak. total area for dirversion is 0.91 Ha   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 33.6   (viii). Area of forest land proposed for diversion(in ha.): 0.91   (ix). Non-forest land required for this project(in ha.): 0.49   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PUBLIC WORK DEPARTMENT   (ii). Address1 : PWD PROVINCIAL DIVISION RUDRAPRAYAG   (iii). Address2 : UTTARAKHAND   (iv). State : Uttarakhand   (v). District : Rudraprayag   (vi). Pin : 246171   (vii). Landmark : NIL   (viii). Email address : eepwd_rpg@rediffmail.com   (ix). Landline Telephone No. : 1364-233204   (x). Fax No. : 1364-0   (xi). Mobile No. : 9536748167   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Er Indrajit   (ii). Middle Name: NIL   (iii). Last Name: Bose   (iv). Gender: Male   (v). Designation: EXEUTIVE ENGINEER   (vi). Address 1: P.D. PWD RUDRAPRAYAG   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Rudraprayag   (x). Tehsil: Rudraprayag   (xi). Pin: 246171   (xii). Landmark: NIL   (xiii). Email Address: eepwd_rpg@rediffmail.com   (xiv). Landline Telephone No.: 1364-233204   (xv). Fax No.: NIL   (xvi). Mobile No.: 7500217670   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Rudraprayag0.910.49
Total0.910.49
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Rudraprayag0.910.49
Total0.910.49
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Chamak0.910.49
Total 0.91 0.49
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road0.910.49
Total 0.91 0.49
C. Maps of forest land proposed to be diverted
Division 1. : Rudraprayag
  (i). Area of forest land proposed to be diverted(in ha.) : 0.91   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.91    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 5
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Cover page, Index, Fact sheet, part I
2part III-IV
3part V
4Geologist Report
5G.O.
6Noc of villagers, LxB of project, Task force certificate, No loss of wild life, Benefited villagers, Value of land, Manak rule, RCC pillar, Lease certificate, Soil erosion certificate, CA certificates, etc
7Maps, part II, Joint survey report, SIR, Minimum demand of land, Land chedule, Bar chart, Ca calculation, Trees Value, Muck calculation and value, National park, Layout plan, work not started, Reginol and Historical plance certificate, NPV etc
8alternate alignment certificate
9NOC on naap land and muck plan
10Eds removed with letter and all DFO signed paper attahced in a bit
11EDS removed as per given instruction dated 16/08/2016
12EDS removed dated 27-06-2017
13CA sutibility certificate, CA calculation, Map For CA
14Web portal Part III to V
15CA certificate
16EDS latter dated 27-12-2017
17EDS latter dated 28-12-2017
18Receiving letter of Nodal dated 13-04-2018