FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/8123/2014   (ii). Name of Project for which Forest Land is required : Construction of Naugoan Bukundi Motor Road Km 15.00 to 21.00   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : This road is for the village of Bukundi, village bukundi of 500 population and family 208, situated in Block Yamkeshwar of the district - Pauri Garhwal. This road passes through private land and civil land. Total length road is 6.00 kilometers   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 107.72   (viii). Area of forest land proposed for diversion(in ha.): 4.86   (ix). Non-forest land required for this project(in ha.): 1.372   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : EXECUTIVE ENGINEER   (ii). Address1 : Irrigation Division, PMGSY, Kotdwar   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Pauri Garhwal   (vi). Pin : 246149   (vii). Landmark : Near Sidhbali Madir Kotdwar   (viii). Email address : eepmgsykotdwara@rediffmail.com   (ix). Landline Telephone No. : 1382-229847   (x). Fax No. : 1382-1382   (xi). Mobile No. : 9412971613   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Satyaveer   (ii). Middle Name: Singh   (iii). Last Name: Tyagi   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: Irrigation Division, PMGSY, Kotdwar   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Pauri Garhwal   (x). Tehsil: Kotdwara   (xi). Pin: 246149   (xii). Landmark: Near Sidhbali Madir Kotdwar   (xiii). Email Address: eepmgsykotdwara@rediffmail.com   (xiv). Landline Telephone No.: 1382-229847   (xv). Fax No.: 01382229847   (xvi). Mobile No.: 9412971613   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Lansdowne4.861.372
Total4.861.372
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pauri Garhwal4.861.372
Total4.861.372
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bhukandi4.861.372
Total 4.86 1.372
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road4.860.63
2Muck Disposal00.742
Total 4.86 1.372
C. Maps of forest land proposed to be diverted
Division 1. : Lansdowne
  (i). Area of forest land proposed to be diverted(in ha.) : 4.86   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.4.86    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: because Dence Forest
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 25545
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Pauri Garhwal
  (a). Village: BHELDHUNGA   (b). Area(in ha.): 9.72   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 635   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1letter
2extension of existing road therefore (map)
3Query letter dt 01-06-2017
4letter dt 26-07-2017
5EDS letter dt 09-11-2017 point wise reply to the objections.
6Already EDS Remove with point wise Details our letter No 1474/Van Bhoomi dt 09-11-2017 Please Check Attachment letter
75 Query Remove dt 08-12-2017
8the proposed road is extension of existing road therefore requisite details of earlier sanctioned road
9Ref DFO letter No 1916/12-1 2 may 2018
10Already Upload letter and Hard Copy send by Dfo office Ref DFO letter No 1916/12-1 2 may 2018
11This Road file offline DFO Send to submit CF but online status Pending UA
12Remove quarry letter dt 24-08-2018
13All Ready send Objection Remove letter by DFO Office Hard Copy Submitted and upload online fill this site
14DFO office letter no 565 dt 29-09-2018 objection remove
15Query remove dt 28-02-2019
16government order
17joint inspection report
18NO Alternative alignment certificate by DFO
19Specific land certificate by DFO
20tree certificate by DFO
21Work not start certificate by DFO
22NPV
23Forwarding letter dt 06-07-2019
24objection remove dt 05-08-2019
25C.A certificate by DFO
26DFO office Query dt 23-09-2019 Remove dt 25-09-2019
27Muck Disposal plan
28land schedule
29forest abjection remove dt 10-01-2020
30Site Inspection Report
31joint inspection report