FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/UK/ROAD/67235/2020
(ii). Name of Project for which Forest Land is required :
Construction/Extension of Dobat Ranth Light Vehicle Road into Motor Road from Km 0 to 7.075
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
This time Dobat Ranthi road is Light vehicle road. This road is very Dangers to traveling. There are also Black spot in this road. So extension of this road into motor road is very urgent. Length of this road is 7.075
(iv). State :
Uttarakhand
(v). Category of the Proposal :
Road
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
206.41
(viii). Area of forest land proposed for diversion(in ha.):
5.175
(ix). Non-forest land required for this project(in ha.):
1.392
(x). Total period for which the forest land is proposed to be diverted(in years):
100
A-2.
Details of User Agency
(i). Name :
CONSTRUCTION DIVISION PWD ASKOTE
(ii). Address1 :
cd pwd askote
(iii). Address2 :
NIL
(iv). State :
Uttarakhand
(v). District :
Pithoragarh
(vi). Pin :
262501
(vii). Landmark :
NIL
(viii). Email address :
eepwdaskote@gmail.com
(ix). Landline Telephone No. :
5964-238724
(x). Fax No. :
5964-0
(xi). Mobile No. :
9412977325
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
Suman
(ii). Middle Name:
NIL
(iii). Last Name:
Bora
(iv). Gender:
Female
(v). Designation:
Junior engineer
(vi). Address 1:
ee cd pwd askote
(vii). Address 2:
NIL
(viii). State:
Uttarakhand
(ix). District:
Pithoragarh
(x). Tehsil:
Didihat
(xi). Pin:
262501
(xii). Landmark:
NIL
(xiii). Email Address:
eepwdaskote@gmail.com
(xiv). Landline Telephone No.:
5964-238724
(xv). Fax No.:
NIL
(xvi). Mobile No.:
8171630275
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Pithoragarh
5.175
1.392
Total
5.175
1.392
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Pithoragarh
5.175
1.392
Total
5.175
1.392
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Ranthi
5.175
1.392
Total
5.175
1.392
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Road
5.175
1.192
2
Muck Disposal
0
0.2
Total
5.175
1.392
C.
Maps of forest land proposed to be diverted
Division 1. : Pithoragarh
(i). Area of forest land proposed to be diverted(in ha.) :
5.175
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
5.175
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
0
(iii). Temporary Employment(Number of person-days):
3000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Yes
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii). No. of districts involved for raising Compensatory Afforestation:
1
(iv). No. of patches:
One
District 1. : Pithoragarh
(a). Village:
Ringu Munsyari
(b). Area(in ha.):
10.35
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
khata no- 61, khasra no-112,116,125,126, 164,187,199,215,218,234,235,237,245,257267,268,270,295-298,300,301-303,309,318,319,321,327,328
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
(v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:
(vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No
Documents
Remarks
1
2-1 A Short Narrative
2
2-3 Preliminary joint Inspection Report
3
2-4 Compaerative Chart
4
2-5 DM Crt-Alternate suitable non-forest land
5
2-6 Land schedule
6
2-7 Category wise Land
7
2-8 Barchart
8
2-12 Road side gap filling Plantatio
9
2-15 Details of tree with name
10
2-18 Cert of felling minimum Trees
11
2-23 1980
12
2-24 Noc Gram Sabhas
13
2-27 Cert Work not start
14
2-28 Geologist Report
15
2-29 Task Force report
16
2-30 31 Standard Condition
17
2-32 Geologist condition to Taskforce cert
18
2-33 No Historical monumental
19
2-34 No Animal effected
20
2-35 LPG kerosene
21
2-36 Benefited villages
22
2-37 Calculation cert of NPV
23
2-38 Increasing Payment Of NPV
24
2-39 Cost of forest land and lease rent crt by DM
25
Check List
26
Others
27
Objection Removed on dated 06-01-2020
28
objection removed on date 14.06.2021
29
CWLW certificate
30
2-2 Administrative & Financial
31
Aerial distance Certificate
32
2-3 Site Inspection Report
33
2-20 National Park
34
Index
35
Objection remove on date 19.08.2021
36
objection removed as per received instruction 02.09.2021
37
objection removed on date 22.09.2021
38
Perfoma 2 of DFO
39
All objection removed as per instruction and 5 copy of objection has been submitted in DFO office with dt 16-10-2021
40
objection removed on date 15.07.2022
41
2-10 CA Site suitability
42
2-9 CA Scheme
43
Objection removed on date 24.04.2023
44
2-19 Muck disposal
45
objection removed on 12.08.2023
Print