FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/48748/2020   (ii). Name of Project for which Forest Land is required : Construction of Babed Dhar Luhan Band To Bagana Motor Road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : If the road connectivity is provided to the villagers it shall enhance the social and economical developement of this area and migration of the people from the village shall be minimized.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 520   (viii). Area of forest land proposed for diversion(in ha.): 4.205   (ix). Non-forest land required for this project(in ha.): 2.913   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : PUBLIC WORKS DEPARTMENT   (ii). Address1 : Executive Engineer,ty.division,PWD,Sahiya Dehradun   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Dehradun   (vi). Pin : 248196   (vii). Landmark : civil land   (viii). Email address : eepwdsahiyakalsi@gmail.com   (ix). Landline Telephone No. : 1360-274595   (x). Fax No. : 1360-1360   (xi). Mobile No. : 9456745631   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: S   (ii). Middle Name: K   (iii). Last Name: Tyagi   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: O/0 E.E., Ty.Div.,PWD, Sahiya   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Dehradun   (x). Tehsil: Dehradun   (xi). Pin: 248196   (xii). Landmark: civil land   (xiii). Email Address: eepwdsahiyakalsi@gmail.com   (xiv). Landline Telephone No.: 1360-274595   (xv). Fax No.: 1360274595   (xvi). Mobile No.: 9412917304   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chakrata4.2052.913
Total4.2052.913
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Dehradun4.2052.913
Total4.2052.913
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bagna4.2052.913
Total 4.205 2.913
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Linear(Road)4.0252.625
2Dumping0.180.288
Total 4.205 2.913
C. Maps of forest land proposed to be diverted
Division 1. : Chakrata
  (i). Area of forest land proposed to be diverted(in ha.) : 4.205   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.4.205    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: No
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Yes   (a). Reason Category: Other reason   (b). Provide reasons thereof: Road Construction   (c). Area of non-forest or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation (in ha.): 8.41   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Dehradun
  (a). Village: bagna   (b). Area(in ha.): 8.41   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 56,57   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1replyEDS
2Alignment comparision
3Authority letter
4Barchart
5site suitability
6fact sheet
7Form 48
8prarup-2
9prarup-3
10prarup-14
11LxB of project
12work not start certificate
13detailed affected trees list
14banj tree certificate
15minimum trees faling
16arial distance certificate
17NOC villagrs
18FRA
19Geologist recomendation
20Task force certificate
21standard conditions
22non religious and non historic certificate
23wild life certificate
24kerosene oil availability
25village benificial certificate
2610 years CA Estimate
27CA site suitability certificate
28Road side plantatio cert.
29Muck disposal plan
30NPV
31NPV increased payment certificate
32Demarcation pillar etc estimate
33GO
34Check list
35MOU
36Muck disposal certificate
37short detail of work
38joint inspection and tree list
39land schedule
40Law violation 1980 certificate
41Sir Reply letter of Objection Received in EDS is Attached in Additional Documents
42removed of objection
43objection removed as per letter no 1328/6c dt 19/7/2021 (attached in ADITIONAL INFORMATION HAVING FILE NAME "REPLY OF eds DT 22/7/2021"
44objection removed as per letter no 1328/6c dt 19/7/2021 (attached in ADITIONAL INFORMATION HAVING FILE NAME "REPLY OF eds DT 22/7/2021"
45objection removal latter dt 27-09-2021
46removed of objection letter
47remove for objection and jiomap refrence date 16-12-2021
48joint Inxpection letter
49Removed objection letter no 829/6C Dt 05-06-2023
50The proceedings at your level on the above subject are being held
51Request for joint inspection report of first alignment as per Attached letter no 1264/6C Dt 01.08.2024
52Attached Letter no 2068/6C Dt 11-12-2024