FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/42851/2019   (ii). Name of Project for which Forest Land is required : Construction of double lane Motor Road and foot path from Doidwala Dudhli Main road to Chandmari Mishrawal Lachhiwala bridge in district Dehradun consituency Doiwala under Hon'ble CM Ghoshna No. 105/2   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Provision of New road construction for local villagers of Chandmari, Missarwala and Lachhiwala. There is no existing road for communication, So provision of new motor road is proposed and same has been sanctioned by the UK Govt   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 13.8   (viii). Area of forest land proposed for diversion(in ha.): 3.6   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PUBLIC WORK DEPARTMENT   (ii). Address1 : Temporary Division, PWD, Rishikesh   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Dehradun   (vi). Pin : 249201   (vii). Landmark : Near Railway Station   (viii). Email address : eetdrksh@rediffmail.com   (ix). Landline Telephone No. : 135-2430660   (x). Fax No. : 135-135   (xi). Mobile No. : 9412053901   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Dinesh   (ii). Middle Name: NIL   (iii). Last Name: Sindhwal   (iv). Gender: Male   (v). Designation: Assistante Engineer   (vi). Address 1: Temporary Division, PWD, Rishikesh   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Dehradun   (x). Tehsil: Rishikesh   (xi). Pin: 249201   (xii). Landmark: Near Railway Station   (xiii). Email Address: eetdrksh@rediffmail.com   (xiv). Landline Telephone No.: 135-2430660   (xv). Fax No.: 01352430660   (xvi). Mobile No.: 8126906336   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Dehradun3.60
Total3.60
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Dehradun3.60
Total3.60
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Doiwala Nagar Palika3.60
Total 3.6 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1road3.60
Total 3.6 0
C. Maps of forest land proposed to be diverted
Division 1. : Dehradun
  (i). Area of forest land proposed to be diverted(in ha.) : 3.6   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.3.6    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: already existing road
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 600
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : Yes   (a). Whether Project or a part thereof is located within a Protected Area ? : No   (ii). Status of approval of the Standing Committee of National Board for the Wildlife(NBWL) to the Project : Application yet to be submitted
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Dehradun
  (a). Village: ghissarpadhi   (b). Area(in ha.): 7.2   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 228   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Part 1
2Govt orders
3Joint inspection report
4land schedule
5Project L and B
6Bar_Chart
7not yet work start
8Geological_report
9NOC of villagers
10Geological_certificate
11Task_force_certificate
12Manak
13Wild_Life_Certificate
14Labour_Certificate
15Villagers_List
16NPV_List
17Cerificate of start point and end point of road
18Fact_sheet
19Cover_page
20Act 1980 cert
21Geo Refrence CA Map
22CA toposheet Map
23giologist permission
24Arial Distance Certificate
25Work Start Cert.pdf
26NPV Amount
27muck dumping cert
28Ownership Proof Cert
29wild life clearess cert
30ownarship proof cert
31IRC SP Cert
32wild life century certificate
33justification and IRCSP cer
34comments of cwlw
35SDM Doiwala revenue and forest joint report
36letter