FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/41009/2019   (ii). Name of Project for which Forest Land is required : Construction of Chinyalisaur-Jogath motor road to Gorun motor road in Block Chiniyalisaur District Uttarkashi under State sector   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Chinyalisaur Jogath Motor road to Gorun Motor Road- length-2.500 KM. The total length of this motorway is 2.500 kilometers. This motorway starts from kilometer 24 of Chinyalisaur Jogath motorway.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 200   (viii). Area of forest land proposed for diversion(in ha.): 1.5225   (ix). Non-forest land required for this project(in ha.): 0.6125   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : EXECUTIVE ENGINEER   (ii). Address1 : Construction Division PWD, Chinyalisaur   (iii). Address2 : Uttarkashi   (iv). State : Uttarakhand   (v). District : Uttarkashi   (vi). Pin : 249196   (vii). Landmark : NIL   (viii). Email address : eecdpwd_uki@rediffmail.com   (ix). Landline Telephone No. : 1371-237084   (x). Fax No. : NIL   (xi). Mobile No. : 9412959004   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: suresh   (ii). Middle Name: Kumar   (iii). Last Name: tomar   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: Construction Division, P.W.D., Chinyalisaur   (vii). Address 2: Uttarkashi   (viii). State: Uttarakhand   (ix). District: Uttarkashi   (x). Tehsil: NIL   (xi). Pin: 249196   (xii). Landmark: NIL   (xiii). Email Address: eecdpwd_uki@rediffmail.com   (xiv). Landline Telephone No.: 1371-237084   (xv). Fax No.: 01371237084   (xvi). Mobile No.: 7579186700   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Uttarkashi1.52250.6125
Total1.52250.6125
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Uttarkashi1.52250.6125
Total1.52250.6125
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Gorun (Kawagaddi)1.52250.6125
Total 1.5225 0.6125
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road1.13750.6125
2Muck Disposal0.3850
Total 1.5225 0.6125
C. Maps of forest land proposed to be diverted
Division 1. : Uttarkashi
  (i). Area of forest land proposed to be diverted(in ha.) : 1.5225   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.1.5225    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 4000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Uttarkashi
  (a). Village: Bagori   (b). Area(in ha.): 3.045   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 2979   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Partiveden
2Justification detail report
34 GO 1
45 Fincial Sancation
56 Label Defence Certificate
67 Praroop Part I 1
78 part II
89 Part III
910 part iv
1011 part v
1112 Pre inpection report 1
1213 Land Shedule 1
1314 Effective Tree list 1
1415 Effective Tree Estimate
1516 Tree Patan Certificate
1617 Certificate of Distance from National park etc
1721 Digital map CA
1823 CA Estimate 1
1924 Certificate of Deposit CA Amount in x2
2026 Khatoni
2127 Bar chart
2228 Certificate of CA in Blank Space
2329 Plantation in x10
2430 NOC Gram Sabha
2532 Certificate of length and width of project
2633 Certificate of Cancellation of Alignment
2734 partiveden Alignment 1
2835 Certificate of unstarted work
2936 Giological report 1
3037 Jila Task Force Certificate
3138 Task Force Certificate 1
3239 Certificate of no loss for wild life etc
3340 Certificate of No Alternet land
3441 Certificate of non Religious and historical place etc
3542 Certificate of Benifeted Villages_Families etc
3643 Enviorment Sanction certificate
3744 Certificate of Forest Land value
3845 NPV 1
3946 Mulya Labh Certificate
4047 isthal vishist
4148 Certificate of Supply of Carosin oli_gas etc
4249 Muck Disposal Plan 1
4350 manak sharte 1
4451 RCC Pilar 1
4552 CA Land Ownership certificate
4653 Density of Vegetation
4754 Road Site Plan
4855 Check List Certificate
4956 District map
50Letter of EDS reply
51EDS letter 06-07-2020
52eds letter 5-9-20
53village Cirtificate
54EDS Reply letter
55EDS Reply Letter Dared 19_06_2021
56EDS letter 29-06-2021
57aapati 1 Detail narrative
58aapati 2 Part II
59aapati 3 pre joint inspection report
60aapati 4 Van adhiniyam 1980
61Aapati 5 Van bhumi mulya laabh certificate
62eds 20-07-2021
63EDS letter Gorun 14-9-2021
64EDS letter
65Gornment Order visible copy
66Geogolist report visible copy
67work not started signed copy
68CA map Area with Place Bagori
69EDS letter
70letter EDS Gorun 23-08-2022
71Topo Sheet/Digital map of CA
72Administrative approval
73EDS 11-01-2023
74Digital Map_Topo sheet of Gorun motor road
75EDS 11-07-2023
76Hard Copy of EDS 11-07-2023 Dispatched fo DFO UKI, dt. 27-9-23
77EDS date 19-06-2024
78EDS 24-08-2024
79EDS 24-08-2024 (REVISED)
80EDS letter 19-10-2024