FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/38448/2019   (ii). Name of Project for which Forest Land is required : Construction of Nandprayag Ghat M/R K.M. 15 to Jakhani Motor Road Under PMGSY   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The road is required for providing connectivity to village Jakhni and Bijar situated in Block Ghat of District Chamoli with a population of 870 numbers . The total length of road is 4.325 Km.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 246   (viii). Area of forest land proposed for diversion(in ha.): 2.3975   (ix). Non-forest land required for this project(in ha.): 0.836   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PMGSY   (ii). Address1 : PMGSY Division, PWD Karanprayag   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Chamoli   (vi). Pin : 246444   (vii). Landmark : Karanprayag via Simli Road   (viii). Email address : eepmgsykaranprayag2@rediffmail.com   (ix). Landline Telephone No. : 1363-244103   (x). Fax No. : 1363-244103   (xi). Mobile No. : 9837760051   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: RAJENDRA   (ii). Middle Name: SINGH   (iii). Last Name: DIWAKAR   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: Assistant Engg. PMGSY Div. PWD Karnaprayag, Chamoli.   (vii). Address 2: Assistant Engg. PMGSY Div. PWD Karnaprayag, Chamoli.   (viii). State: Uttarakhand   (ix). District: Chamoli   (x). Tehsil: Karnaprayag   (xi). Pin: 246444   (xii). Landmark: NIL   (xiii). Email Address: vinayjhinkwan@gmail.com   (xiv). Landline Telephone No.: 1363-244103   (xv). Fax No.: 1363244103   (xvi). Mobile No.: 8476883363   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Badrinath,Gopeshwar2.39750.836
Total2.39750.836
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chamoli2.39750.836
Total2.39750.836
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1JAKHNI2.01250.8185
2BIJAR0.3850.0175
Total 2.3975 0.836
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1MUCK DISPOSAL00.206
2Road2.37590.63
3Bridge0.02160
Total 2.3975 0.836
C. Maps of forest land proposed to be diverted
Division 1. : Badrinath,Gopeshwar
  (i). Area of forest land proposed to be diverted(in ha.) : 2.3975   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.2.3975    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 10000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Others
Additional information Details
Documents
S.No Documents
Remarks
1dumping
2work not started
3vanya jeev
4keroseen certificate
5lenght width
6manak sharte
7npv
8park
9pravarn
10rcc pillars
11rikt isthan
12task force
13GEOLOGIST REPORT
14financial and administrative approval
15INDEX
16correction dated 13.03.2019
17correction letter Dated 08-04-2019
18Benefited Village
19EDS answer dated 04-06-2019
20EDS answer 14 june
21airel distance certificate by DFO
22airel distance certificate by CCF IT CELL DEHRADUN
23EDS answer 22 june 2019
24REVISED G.O. OF EXISTING ROAD
25REVISED BENEFITED VILLAGE CERTIFICATE
26CERT. OF ALTERNATE ROAD ALIGNMENT CANCELLATION
27REVISED SOI TOPOSHEET OF RAOD
28Revised Bar Chart
29Tree Certificate by DFO
30EDS REPLY 17.02.2020
31Hard copy submission receipt at nodal
32land schedule
33FRA
34joint inspection report
35tree details with scientific name
36Muck disposal plan
37justification and discription of project
38Comparative statement of alignment
39certficate for not religious or historical place
40Certicate for Cancellation of alternate alignment
41certficate of not violating FRA 1980
42CA geo map
43CA topo map
44DFO certificate about MDF
45Revised CA sceme
46CA suitabilty certificate revised
47EDS answer in 9 sep 2020