FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/UK/ROAD/38079/2019
(ii). Name of Project for which Forest Land is required :
Construction of Dhurmakudi km.2.00 to Mokhmalla Motor Road
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The proposed road is for providing the connectivity to the village Mokhmalla with a population of 1035 thus the total population being benefited with this road is 1035 and the road shall provide connectivity to one village. the road is required for proving connectivity to village .the road is locate
(iv). State :
Uttarakhand
(v). Category of the Proposal :
Road
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
270
(viii). Area of forest land proposed for diversion(in ha.):
3.275
(ix). Non-forest land required for this project(in ha.):
1.8
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
PMGSY
(ii). Address1 :
PMGSY Division, PWD Karanprayag
(iii). Address2 :
NIL
(iv). State :
Uttarakhand
(v). District :
Chamoli
(vi). Pin :
246444
(vii). Landmark :
Karanprayag via Simli Road
(viii). Email address :
eepmgsykaranprayag2@rediffmail.com
(ix). Landline Telephone No. :
1363-244103
(x). Fax No. :
1363-244103
(xi). Mobile No. :
9837760051
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
RAJENDRA
(ii). Middle Name:
SINGH
(iii). Last Name:
DIWAKAR
(iv). Gender:
Male
(v). Designation:
Assistant Engineer
(vi). Address 1:
Assistant Engg. PMGSY Div. PWD Karnaprayag, Chamoli.
(vii). Address 2:
Assistant Engg. PMGSY Div. PWD Karnaprayag, Chamoli.
(viii). State:
Uttarakhand
(ix). District:
Chamoli
(x). Tehsil:
Karnaprayag
(xi). Pin:
246444
(xii). Landmark:
NIL
(xiii). Email Address:
vinayjhinkwan@gmail.com
(xiv). Landline Telephone No.:
1363-244103
(xv). Fax No.:
1363244103
(xvi). Mobile No.:
8476883363
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Badrinath,Gopeshwar
3.275
1.8
Total
3.275
1.8
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Chamoli
3.275
1.8
Total
3.275
1.8
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Mokhmalla
3.275
1.8
Total
3.275
1.8
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Road
2.7
1.8
2
muck disposal at 1/12 km
0.0326
0
3
muck disposal at 2/25 km
0.0864
0
4
muck disposal at 3/10
0.2264
0
5
muck disposal at 0/8 km
0.0959
0
6
muck disposal at 0/24 km
0.052
0
7
muck disposal at 0/35 km
0.0816
0
Total
3.2749
1.8
C.
Maps of forest land proposed to be diverted
Division 1. : Badrinath,Gopeshwar
(i). Area of forest land proposed to be diverted(in ha.) :
3.275
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
3.275
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
0
(iii). Temporary Employment(Number of person-days):
11000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Yes
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii). No. of districts involved for raising Compensatory Afforestation:
1
(iv). No. of patches:
One
District 1. : Chamoli
(a). Village:
KUNDI
(b). Area(in ha.):
6.55
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
1595, 1600, 1601, 1612, 1621
(e). Present owner:
Others
(f). Copy of ownership proof:
(g). Copy of Mou/agreement executed between the Present owner and the User Agency:
(h). Copy of non encumberence certificate for the forest land:
(v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:
(vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No
Documents
Remarks
1
compretive
2
GIOLOGIST REPORT
3
HISTROLICAL PLACE
4
KEROSEN
5
MINIUM FOREST LAND
6
MINIUM TREES
7
WORK NOT STARTED
8
TASK FORCE
9
MANAK SHART
10
VANYA JEEV
11
RCC PILLER
12
TO WHOM CONCERN
13
FACT SHEET
14
GEO REF MAP C.A.
15
administrative approval
16
bar chart
17
correction letter dated 03.04.2019
18
aerial distance
19
EDS answer dated -10-7-2019
20
BAANJ TREE PATAN REVISE
21
NOC VLC REVISE
22
LENGTH WIDTH CERTIFICATE
23
NPV CERTIFICATE REVISE
24
CA amount submission
25
CA scheme
26
Tree Details
27
sanction letter
28
Receiving letter from Nodal office on 17.03.2020
29
Fund for plantation
30
EDS reply dated 03.09.2019
31
Muck disposal plan
32
EDS ANSWER 15-07-2020
33
JOINT INSPECTION ABOUT BAANJ TREES
34
JOINT INSPECTION REVIESD
35
LAND SHEDULE
Print