FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/38048/2019   (ii). Name of Project for which Forest Land is required : C/o Naugaon to Kanarichhina Motor road distt almora   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Motor road starts from khaulsheer-Naugaon Motor Road (constructed road by PMGSY) km. 6.00 hec. 8-10 and joins kanarichhina and connect at km. 31 of Barechhina-Seraghat Motor road (Length 2.015km). if the road is constructed the people would be able to supply their vegetable easily and this would inc   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 14.58   (viii). Area of forest land proposed for diversion(in ha.): 1.377   (ix). Non-forest land required for this project(in ha.): 0.4365   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : CONSTRUCTION DIVISION PWD ALMORA   (ii). Address1 : Construction Division PWD Almora   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Almora   (vi). Pin : 263601   (vii). Landmark : NIL   (viii). Email address : eecdalmorapwd@gmail.com   (ix). Landline Telephone No. : 5962-230091   (x). Fax No. : 5962-5962   (xi). Mobile No. : 9759892120   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Ashutosh   (ii). Middle Name: NIL   (iii). Last Name: Kumar   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: Construction Division PWD Almora   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Almora   (x). Tehsil: Almora   (xi). Pin: 263601   (xii). Landmark: GANDHI PARK CHAUGHANPATA   (xiii). Email Address: eecdalmorapwd@rediffmail.com   (xiv). Landline Telephone No.: 5962-230091   (xv). Fax No.: 05962230091   (xvi). Mobile No.: 7060841257   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Civil Soyam,Almora1.3770.4365
Total1.3770.4365
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Almora1.3770.4365
Total1.3770.4365
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Naugaon0.4950.135
2hataula0.8820.3015
Total 1.377 0.4365
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road1.3770.3675
2Muck Disposal (including Bridge)00.069
Total 1.377 0.4365
C. Maps of forest land proposed to be diverted
Division 1. : Civil Soyam,Almora
  (i). Area of forest land proposed to be diverted(in ha.) : 1.377   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.1.377    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 127750
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Almora
  (a). Village: dunar   (b). Area(in ha.): 2.754   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 137   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Prativedan
2administrative sanction
3Inspection report
4Alignment or alternate Scheme
5Certificate from the DM for no alternative suitable non forest land
6LAnd scheduled
7Land length or width
8BAr Chart
9CA 10 year scheme
10suitability land for compensatory afforestation
11bear the cost of dimarcation
12gap filling plantation scheme
13gap filling plantation
14tree detail
15OAk tree detail
16certificate for felling of tree is not involved
17Muck Disposal
18national park area
19no voilation
20NOC from local gram sabha
21work has not been started
22Geologist report
23Task Force
24standard condition
25geologist report/ task force
26No historical area effected
27certificate of no animal will be effected.
28fuel kerosene
29benefit villages
30NPV calculation c
31payment of increses rate of NPV
32cost of the forest land and lease rent c
33Certificate of lease period by user agency
34demarcation of Land RCC piller
35bear the cost of dimarcation RCC piller
36Fact Sheet
37praptra 2 part 1
38Aerial distance certificate (objection paper)
39Land scheduled, (objection paper)
40Bar chart (objection paper)
41site suitability Certificate (objection paper)
42CA Scheme (objection paper)
43letter (objection letter)
44Forwording Letter
45forwording Letter
46Muck Disposal