FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/UK/ROAD/37699/2018
(ii). Name of Project for which Forest Land is required :
Construction of Village Amotha to Dola Highschool Link Road
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Construction of Village Amotha to Dola Highschool Link Road (Van Panchayat Forest 1.665 hect). This road connect to Devipura saud Motor Road and reduce the 80 Km Length for these Villages.
(iv). State :
Uttarakhand
(v). Category of the Proposal :
Road
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
54.6
(viii). Area of forest land proposed for diversion(in ha.):
1.665
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
PWD RAMNAGAR
(ii). Address1 :
Construction Division, Ramnagar (Nainital)
(iii). Address2 :
NIL
(iv). State :
Uttarakhand
(v). District :
Nainital
(vi). Pin :
244715
(vii). Landmark :
NIL
(viii). Email address :
eecdrmr@rediffmail.com
(ix). Landline Telephone No. :
5947-254591
(x). Fax No. :
5947-254591
(xi). Mobile No. :
9411161148
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Others
A-3.
Details of Person Making Application
(i). First Name:
Mahendra
(ii). Middle Name:
NIL
(iii). Last Name:
Kumar
(iv). Gender:
Male
(v). Designation:
Executive Engineer
(vi). Address 1:
Construction Division, Ramnagar (Nainital)
(vii). Address 2:
NIL
(viii). State:
Uttarakhand
(ix). District:
Nainital
(x). Tehsil:
Ramnagar
(xi). Pin:
244715
(xii). Landmark:
NIL
(xiii). Email Address:
eecdrmr@rediffmail.com
(xiv). Landline Telephone No.:
5947-254591
(xv). Fax No.:
05947254591
(xvi). Mobile No.:
9412023055
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Ramnagar
1.665
0
Total
1.665
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Nainital
1.665
0
Total
1.665
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Amotha
0.4725
0
2
Riyaad Malla
1.1925
0
Total
1.665
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Muck Dumping
0
0
2
Amotha, Riyaad Malla
1.665
0
Total
1.665
0
C.
Maps of forest land proposed to be diverted
Division 1. : Ramnagar
(i). Area of forest land proposed to be diverted(in ha.) :
1.665
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
1.665
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
No
(a). Reason for not providing such map:
Other
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
0
(iii). Temporary Employment(Number of person-days):
2500
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Yes
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii). No. of districts involved for raising Compensatory Afforestation:
1
(iv). No. of patches:
One
District 1. : Nainital
(a). Village:
Bagad Talla
(b). Area(in ha.):
3.3
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
Other
(e). Present owner:
Others
(f). Copy of ownership proof:
(g). Copy of Mou/agreement executed between the Present owner and the User Agency:
(h). Copy of non encumberence certificate for the forest land:
(v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:
(vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No
Documents
Remarks
1
Check List
2
Fact Sheet
3
Justification
4
Gov of India
5
Joint Inspection Report
6
Land Secdule
7
Tree Cutting Certificate
8
Certificate of National Park
9
Topo Sheet of Road
10
Joint Inspection CA Land
11
Map of CA Land
12
Estimate of Plantation
13
Importance of Compensatory Plantation Certificate
14
Bar Chart
15
Plantation of Rickt Place
16
Estimate of Road Side Plantation
17
No Effected Tree Certificate
18
10 Time Plantation Certificate
19
Aam Sabha
20
FRA
21
Length and Width Certificate
22
Vakalpik Samrakhen Certificate
23
Work not Start Certificate
24
Geologist Report
25
Task Foce/Geologist Certificate
26
Wild Animal Not effected Certificate
27
Minimum Land Demand Certificate
28
No Relegios and Historical Certificate
29
Village, Family, Population profitable Certificate
30
Dugunay Avatan Amount Submitted Certificate
31
Environmental Certificate
32
Valuation of Forest Land Certificate
33
NPV Certificate
34
No Important Place Certificate
35
Muck Disposal
36
NOC Certificate
37
Standard Condition
38
RCC Certificate
39
Lay Out Plane
40
Gairvaniki Compansatory Plantation Certificate
41
Minimum Land Certificate
42
Explosive No Use Certificate
43
Certificate of Coocking Gas
44
Forest Land Adhiniyam 1980
45
Minimum Tree Cutting Certificate
46
Check List Certificate
47
Nirast Samrakhen Tree list Certificate
48
49
Require Document Submited
50
EDS DT 10.02.2020 Arial Distance
51
EDS DT 10.02.2020 Bar Chart
52
EDS DT 10.02.2020 CA Site suitability Certificate
53
EDS DT 10.02.2020 Geo Refrance Map GPS Map
54
EDS DT 10.02.2020 Geo Refrance Map GPS Map
55
EDS DT 10.02.2020 Joint Inspection For CA Land
56
EDS DT 10.02.2020 Justification sign by DFO
57
EDS DT 10.02.2020 Land Schedule
58
EDS DT 10.02.2020 MoU
59
EDS DT 10.02.2020 Non Incumbrance Certificate
60
EDS DT 10.02.2020 NPV Calculation
61
EDS DT 10.02.2020 Onwership Proof
62
EDS DT 10.02.2020 Topo CA
63
EDS 10.02.2020 Topo Road
64
EDS Dt. 10.02.2020 Forwarding Letter
65
EDS Dt 10.02.2020 CA Scheme
66
EDS Dt 10.02.2020 CA Site Suitability Certificate
67
EDS Dt. 10.12.2020
68
EDS 24.12.2020 Forwarding
69
EDS 24.12.2020 Arial Distance Certificate
70
EDS Dt 18.03.2021 No Effected Tree Certificate
71
EDS Dt 18.03.2021 SDM Report about CA Area
72
EDS Dt 18.03.2021 CA Scheme
73
EDS Dt 18.03.2021 Work Not Started Certificate by DFO
74
EDS Dt 18.03.2021 Muck Disposal Documents
75
EDS 18.03.2021 Forwarding letter
76
EDS 19.07.2021 New CA Schame
77
EDS 19.07.2021 New Forwarding
78
Forwarding Letter
79
Line Plan
Print