FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/37491/2018   (ii). Name of Project for which Forest Land is required : Construction of Kheeda Maludhar via Chuleraseem Link Motor Road, Length 4.075 Km.   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Road construction will provide road facility to the peoples village, along with this, the school, Hospital will also be connected to the Motor road. village laborers, Farmers can be marketed for marketing, which will be helpful in the development of the village.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 356.47   (viii). Area of forest land proposed for diversion(in ha.): 0.753   (ix). Non-forest land required for this project(in ha.): 3.363   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PMGSY   (ii). Address1 : E.E. PMGSY DIV. PWD. Dwarahat   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Almora   (vi). Pin : 263653   (vii). Landmark : Dwarahat   (viii). Email address : eepmgsypwddwarahat@gmail.com   (ix). Landline Telephone No. : 5966-244171   (x). Fax No. : 5966-0   (xi). Mobile No. : 9411289401   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Rajendra   (ii). Middle Name: Lal   (iii). Last Name: Sah   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: E.E. PMGSY DIV. PWD. Dwarahat   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Almora   (x). Tehsil: Dwarahat   (xi). Pin: 263653   (xii). Landmark: Dwarahat   (xiii). Email Address: eepmgsypwddwarahat@gmail.com   (xiv). Landline Telephone No.: 5966-244171   (xv). Fax No.: NIL   (xvi). Mobile No.: 9410364031   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Almora0.7533.363
Total0.7533.363
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Almora0.7533.363
Total0.7533.363
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Chuleraseem0.1352.425
2Maludhar0.6180.938
Total 0.753 3.363
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road Construction0.7532.915
2Muck disposal00.448
Total 0.753 3.363
C. Maps of forest land proposed to be diverted
Division 1. : Almora
  (i). Area of forest land proposed to be diverted(in ha.) : 0.753   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.753    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 14000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Others
Additional information Details
Documents
S.No Documents
Remarks
1letter no. 20 Date 04.01.2019 (EDS Replay)
2Letter no. 46 date 09.01.2019 Replay of EDS dated 05.01.2019
32.1- A short Narrative
42.2- Administrative and Financial Sanction
52.3- Joint Inspection
62.4- Comparative Chart
72.5- Certificate for demand of the minimum forest land.
82.6- Land Schedule
92.7- Category wise Length, width and area in Ha.
102.8- Bar Chart
112.12- Road side/gap filling plantation estimate.
122.13- Cost of Road side/gap filling plantation estimate.
132.14- Estimate of trees plantation
142.15- Details of Trees with their Scientific Name
152.16- Felling of Oak Trees
162.18- Certificate of felling minimum trees during the project work.
172.19- Muck disposal scheme
182.23- Certificate of No violation has taken place FC Act 1980 reg.
192.24 – NOC from local Gram Sabhas
20NOC Vanpanchayat
212.25- General Lay out plan/alignment
222.27- Certificate of work has not been started.
232.28- Geologist Report.
242.29- Task Force Report
252.30- Standard Condition
262.31- Certificate of complying the condition imposed in Standard condition.
272.32- Certificate of complying the condition imposed in geologist report/Task force recommendation in hill areas.
282.33- No Historical/Monumental or Religious place will be effected certificate.
292.34- Certificate of No animal will be effected.
302.35- Certificate of provided alternative fuelwood, kerosene or LPG to labors Involved in project.
312.36- Benefited villages/Families/Population Certificate.
322.37- NPV Calculation Certificate.
332.38- Certificate of Increases the rates of NPV
342.44- Check list/Fact List
35Prarup 2
36Khata Khatoni
37Agreement of Gram Shabha
38EDS date 23.04.2019 (Replay Letter no. 343 date 30.04.2019
39Aerial distance from National Park/Sanctuary
40Replay of EDS 23.05.19 vide letter no. 438 dated 01.06.2019 has been uploaded.