FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/34380/2018   (ii). Name of Project for which Forest Land is required : Kathiyan to Dirnad Motor Road Under PMGSY   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Construction of Kathiyan to Dirnad Under PMGSY scheme of Length-7.500 Km. It will be served population of Dinnad (387)village connected.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 519.6   (viii). Area of forest land proposed for diversion(in ha.): 3.0835   (ix). Non-forest land required for this project(in ha.): 3.383   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : EXECUTIVE ENGINEER   (ii). Address1 : Construction division PWD haridwar headquarter kalsi   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Dehradun   (vi). Pin : 248001   (vii). Landmark : NIL   (viii). Email address : eepmgsykalsi@rediffmail.com   (ix). Landline Telephone No. : 1360-275015   (x). Fax No. : NIL   (xi). Mobile No. : 9412013716   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Rajesh   (ii). Middle Name: NIL   (iii). Last Name: kumar   (iv). Gender: Male   (v). Designation: executive engineer   (vi). Address 1: Construction division PWD haridwar headquarter kalsi   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Dehradun   (x). Tehsil: Kalsi   (xi). Pin: 248159   (xii). Landmark: NIL   (xiii). Email Address: eepmgsykalsi@rediffmail.com   (xiv). Landline Telephone No.: 1360-275015   (xv). Fax No.: 01360275015   (xvi). Mobile No.: 9412013716   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chakrata3.08353.383
Total3.08353.383
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Dehradun3.08353.383
Total3.08353.383
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Darmigad Comp No 7a,7b,8,91.6450
2dirnaad1.43853.383
Total 3.0835 3.383
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1For Road Work3.08352.7855
2For Muck Dumping00.5975
Total 3.0835 3.383
C. Maps of forest land proposed to be diverted
Division 1. : Chakrata
  (i). Area of forest land proposed to be diverted(in ha.) : 3.0835   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.3.0835    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 20000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Dehradun
  (a). Village: dirnad   (b). Area(in ha.): 6.17   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 462   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1title Page
2Check List
3Report
4fax Sheet
5Bhag 1 to 5
6Scheme G O
7Joint Inspection Report
8Side report by DFO
9Land Schedule
10Bar Chart
11Geological report
12Task force and Manak Sarte
13CA estimate and Road site Plantation certificate.
14Nap land use certificate.
15Muck Dumping Detail
16NPB cost and Certificate
17Minimum forest land Certificate
18Other all Certificate
19pointwise eds reply raised by dfo
20eds reply dated 19 11 18
21EDS dated 8th FEb reply to DFO
22eds reply raised by dfo on dated 6 03 2019
23eds reply dated 13 june 2019
24list of trees
25eds reply raised on dated 15 07 2019
26eds reply raised on 22 07 19
27eds reply 22 07 19
28eds reply raised on 13 08 19
29reply of eds raised on 19 09 2019 by dfo
30eds reply dated 09 oct 2019
31eds reply raised on dated 09 10 2019
32eds reply of hard copy receiving
33eds reply hard copy of proposal receiving
34eds reply raised on dated 05 02 2020
35eds reply on 13 05 2020 raised by dfo
36eds reply raised on 30 06 2020