FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/33105/2018   (ii). Name of Project for which Forest Land is required : Sanara to Malihari Motor Road.   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : This motor Road Start from Km-13 of Barkinda-Manila-Dotiyal Motor Road. Total population of Village Malihari & Kanira approx 950 will be benefited by the construction of this road. This particular region is extremely lacking in the development activities. Development of this   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 600.42   (viii). Area of forest land proposed for diversion(in ha.): 4.286   (ix). Non-forest land required for this project(in ha.): 5.479   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PUBLIC WORKS DEPARTMENT   (ii). Address1 : Executive Engineer construction Division P.W.D. Sult (Almora)   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Almora   (vi). Pin : 263676   (vii). Landmark : PWD Salt (Jhimar)   (viii). Email address : eepmgsysalt@rediffmail.com   (ix). Landline Telephone No. : 5966-211126   (x). Fax No. : 5966-0   (xi). Mobile No. : 9412639254   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Others
A-3. Details of Person Making Application
  (i). First Name: Chandan   (ii). Middle Name: NIL   (iii). Last Name: Choudhary   (iv). Gender: Male   (v). Designation: Computer Operator   (vi). Address 1: Executive Engineer C.D.P.W.D. Salt (Almora)   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Almora   (x). Tehsil: Salt   (xi). Pin: 263676   (xii). Landmark: PWD Salt (Jhimar)   (xiii). Email Address: eepmgsysalt@rediffmail.com   (xiv). Landline Telephone No.: 5966-211126   (xv). Fax No.: NIL   (xvi). Mobile No.: 7055613643   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Almora4.2865.479
Total4.2865.479
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Almora4.2865.479
Total4.2865.479
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Malihari2.2744.235
2Kanira2.0121.244
Total 4.286 5.479
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road Construction4.2864.985
2Muck disposal00.494
Total 4.286 5.479
C. Maps of forest land proposed to be diverted
Division 1. : Almora
  (i). Area of forest land proposed to be diverted(in ha.) : 4.286   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.4.286    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 24000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Others
Additional information Details
Documents
S.No Documents
Remarks
1A short narrative and importance of the project
2Administrative and Financial sanction.
3Preliminary Joint Inspection report.
4Comparative chart showing statement.
5Certificate from the DM that no alternative suitable non-forest land.
6Land schedule.
7Category wise.
8Bar Chart.
9Compensatory afforestation scheme in Civil and Soyam land.
10Certificate regarding suitability of identified land.
11Undertaking by the User Agency to bear the cost.
12Road side gap filling plantation.
13Details of the trees with their scientific name.
14Felling of Oak trees.
15Certificate of felling minimum trees.
16Muck disposal scheme.
17If the project area is within 10 Km radius of NP.
18No violation has taken
19NOC from local Gram Sabhas.
20Certificate work has not been started.
21Geologist Report.
22Task Force report.
23Certificate by user agency for complying the condition.
24Certificate by user agency for complying the condition imposed in geologist report.
25No historical monumental or religious place.
26Undertaking regarding no animal will be effected.
27Undertaking to provide alternative fuel wood.
28Undertaking of payment of NPV.
29Demarcation of land.
30Undertaking of user agency to bear the cost for demarcation work.
31Check list.
32Objection Removed.
33Objection Removed vide eds. dated 30-01-2019
34Tree detail of project
35CA site suitability
36length width discription of project
37estimate of CA for ten years
38tree plantation estimate for both side of road
39objection removed EDS dated 06.03.2019
40NPV Calculation Certificate
41Benefitted village