FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/31411/2018   (ii). Name of Project for which Forest Land is required : Askote to Kuta Motor Road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Road under Pwd Askote which shall provide connectivity to villages Deval,Kholiagaon, Darti,Khariyani and Chhabbisa with Askote Didihat link Road and 1914 no villagers connected bye this road. This road started from km 3.00 of Askote didihat link road and end in Chhabbisa village (KM -10.00 KM)   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 106.87   (viii). Area of forest land proposed for diversion(in ha.): 4.915   (ix). Non-forest land required for this project(in ha.): 4.365   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : CONSTRUCTION DIVISION PWD ASKOTE   (ii). Address1 : cd pwd askote   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Pithoragarh   (vi). Pin : 262501   (vii). Landmark : NIL   (viii). Email address : eepwdaskote@gmail.com   (ix). Landline Telephone No. : 5964-238724   (x). Fax No. : 5964-0   (xi). Mobile No. : 9412977325   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Suman   (ii). Middle Name: NIL   (iii). Last Name: Bora   (iv). Gender: Female   (v). Designation: Junior engineer   (vi). Address 1: ee cd pwd askote   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Pithoragarh   (x). Tehsil: Didihat   (xi). Pin: 262501   (xii). Landmark: NIL   (xiii). Email Address: eepwdaskote@gmail.com   (xiv). Landline Telephone No.: 5964-238724   (xv). Fax No.: NIL   (xvi). Mobile No.: 8171630275   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pithoragarh4.9154.365
Total4.9154.365
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pithoragarh4.9154.365
Total4.9154.365
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Deval1.2450.45
2Kholiyagaon1.5750
3Legaamkanda(Darti, kharhiyani & chhabisha)2.0953.915
Total 4.915 4.365
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road4.6352.925
2Muck Disposal0.281.44
Total 4.915 4.365
C. Maps of forest land proposed to be diverted
Division 1. : Pithoragarh
  (i). Area of forest land proposed to be diverted(in ha.) : 4.915   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.4.365    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined: No Data
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 3000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Pithoragarh
  (a). Village: Chhabbisha   (b). Area(in ha.): 9.83   (c). Copy of KML file of the patch:     View File   (d). Khasra details: khata no 16 khasra no 1214,1368,1369,1370,1371 or 1372   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
12-1 A Short Narrative013
22-3 Preliminary joint Inspection Report016.pdf
32-4 Compaerative Chart.pdf
42-5 DM Crt-Alternate suitable non-forest land.pdf
52-6 Land schedule021.pdf
62-8 Barchart023.pdf
72-11 Undertaking user agency to bear the cost of CA817029.pdf
82-12 Road side gap filling Plantatio818030.pdf
92-13 User Agency to bear Road side gap filling Plantation819031.pdf
102-15 Details of tree with name.pdf
112-16 Felling Oak trees821026.pdf
122-18 Cert of felling minimum Trees822027.pdf
132-20 National Park824035.pdf
142-21 Cert of CCA 10km036.pdf
152-23 1980033.pdf
162-24 Noc Gram Sabhas827.pdf
172-27 Cert Work not start828034.pdf
182-28 Geologist Report037.pdf
192-29 Task Force report830047.pdf
202-30 31 Standard Condition048.pdf
212-32 Geologist condition to Taskforce cert832043.pdf
222-33 No Historical monumental045.pdf
232-34 No Animal effected046.pdf
242-35 LPG kerosene835.pdf
252-36 Benefited villages042.pdf
262-37 Calculation cert of NPV049.pdf
272-38 Increasing Payment Of NPV838040.pdf
282-39 Cost of forest land and lease rent crt by DM038.pdf
292-42 Cost for dimarcation of work(RCC)039.pdf
302-2014.pdf
31Others.pdf
32objection removed as per online objection
33Check List
34About Hard copy
35Hard copy has been send to nodal office dehradun
36Hard copy has been send to nodal office dehradun on dated 7-10-2019. Receiving attached
37Arial Distance Certificate
38Objection Removed letter on dated 1-07-2020
39Aerial Distance CWLW NOC Objection Removed on dated 09-09-2020
40Objection removed on dated 1-1-2020
412-2 Administrative & financial
42CWLW Certificate
43details of alternate
44MDF VDF Certificate of DFO
452-9 CA Scheme civil soyam 10 yrs
46site suitability certificate
47objection removed on date 07.07.2021
48muck disposal plan
49objection removed as per received instructions. hard copy of EDS doc. submitted to DFO Office.
50objection removed as per received instructions. hard copy of EDS doc. submitted to DFO Office. receiving attached. date 07.08.2021
51objection removed as per received instruction 02.09.2021
52EDS reply