FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/29011/2017   (ii). Name of Project for which Forest Land is required : Construction of Didihat Aadichaura Motor Road to Hunera Motor Road Under PMGSY Didihat   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : This road starts from Didihat Aadichaura Motor Road at km 9.00 and ends at Hunera village, this road will connect hunera habitation having population 425. Total 534 no of trees are fallen or transplanted during the construction.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 715.44   (viii). Area of forest land proposed for diversion(in ha.): 8.21   (ix). Non-forest land required for this project(in ha.): 0.54   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : P.M.G.S.Y Didihat   (ii). Address1 : P.M.G.S.Y Didihat   (iii). Address2 : Didihat   (iv). State : Uttarakhand   (v). District : Pithoragarh   (vi). Pin : 262542   (vii). Landmark : P.M.G.S.Y   (viii). Email address : eepmgsydidihat@rediffmail.com   (ix). Landline Telephone No. : 5964-232036   (x). Fax No. : 5964-   (xi). Mobile No. : 9456590705   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Gurpreet   (ii). Middle Name: NIL   (iii). Last Name: Singh   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: P.M.G.S.Y Didihat   (vii). Address 2: P.M.G.S.Y Didihat   (viii). State: Uttarakhand   (ix). District: Pithoragarh   (x). Tehsil: NIL   (xi). Pin: 262542   (xii). Landmark: P.M.G.S.Y   (xiii). Email Address: eepmgsydidihat@rediffmail.com   (xiv). Landline Telephone No.: 5964-232036   (xv). Fax No.: 5964232036   (xvi). Mobile No.: 7251999486   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pithoragarh8.210.54
Total8.210.54
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pithoragarh8.210.54
Total8.210.54
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1hunera8.210.54
Total 8.21 0.54
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Detail of road7.560.54
2Muck Dumping0.650
Total 8.21 0.54
C. Maps of forest land proposed to be diverted
Division 1. : Pithoragarh
  (i). Area of forest land proposed to be diverted(in ha.) : 8.21   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.8.21    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 15000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Pithoragarh
  (a). Village: khata Gaon Madkot   (b). Area(in ha.): 16.42   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 2,3,4,5,118,120,191,192,193,194,195   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1animal certificate
2Alignment
3bar chart
4cost benefit analysis
5Muck dummping plane
6fax sheet
7civil soyam land detail
8Environment certificate
9tree 0 to 10 certificate
10auchity certificate
112nd alignment certificate
12minimum land certificate
13land schedule
14reserve land schedule
15work not progress certificate
16tree rate certificate
179 or 7 meter length tree detail
18oke tree detail
19NOC village
20total tree certificate
21minimum tree cutting certificate
22National park certificate
23National park distance certificate
24National park distance GOvt of india certificate
25NOC panchayat certificate
26cost benifit certificate
27Geology certificate
28task force certificate
29manak sharte
30manak sharte certificate
31lpg certificate
32population detail
33ca amount user agency
34CA use of land certificate
35path viksaropan certificate
36path viksaropan estimate certificate
37onership certificate
38muck certificate
39muck dumping certificate
40NPV certificate
41bisphotak certificate
42forest rule 1980 certificate
43Geological report
44Joint inspection report
45NOC certificate by village
46Administrative sanction road
47report or pativedan road
48sepecification
49photograph
50NOC old
51Joint inspection report
52authority certificate
53shortcoming land schedule
54Muc dumping Plan
55FRA NEW
56CA SCHEME
57SHORTCOMMINGS HUNERA
58DFO SITE INSPECTION REPORT FOR CA SITE SUITABILITY(डी एस एसप्रमाण पत्र)
59EDS DATED 29.5.2019 (कमियों का निस्तारण का पत्र)
60प्रारूप 2 व 3
619.00 मीटर चौड़ाई में कटने वाले वृक्षों का विवरण
62REC बैठक के बाद आये बिन्दुओ पर निराकारण पत्र व फोर्वर्डिंग लैटर