FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/27734/2017   (ii). Name of Project for which Forest Land is required : Construction of Tharali to Paingarh Motor Road under PMGSY.   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The road is required for providing connectivity to Village - Sunna,(359),dewalgar(358),sonli(347) and (359)Paingarh situated in Block-Tharali of District Chamoli with a population of 1423 numbers. The total length of the road is 8.725 km.The road passes through Reserve ,Civil and Private land.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 550   (viii). Area of forest land proposed for diversion(in ha.): 4.812   (ix). Non-forest land required for this project(in ha.): 3.6435   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : RES PMGSY KARANPERAYAG   (ii). Address1 : Karanprayag   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Chamoli   (vi). Pin : 246444   (vii). Landmark : NIL   (viii). Email address : eepmgsykaranprayag1@rediffmail.com   (ix). Landline Telephone No. : 1363-244843   (x). Fax No. : 1363-0   (xi). Mobile No. : 9412056922   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: sachin   (ii). Middle Name: NIL   (iii). Last Name: kumar   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: Karanprayag   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Chamoli   (x). Tehsil: Karnaprayag   (xi). Pin: 246444   (xii). Landmark: NIL   (xiii). Email Address: eepmgsykaranprayag1@rediffmail.com   (xiv). Landline Telephone No.: 1363-244843   (xv). Fax No.: NIL   (xvi). Mobile No.: 7895282436   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Badrinath,Gopeshwar4.8123.6435
Total4.8123.6435
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chamoli4.8123.6435
Total4.8123.6435
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Suna0.0280
2Dewalgarh1.421.395
3Sunao1.2321.096
4Paingarh1.071.1525
5Reserve Forest (Pinder Paar-1)1.0620
Total 4.812 3.6435
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road3.7523.0285
2Muck Disposal1.060.615
Total 4.812 3.6435
C. Maps of forest land proposed to be diverted
Division 1. : Badrinath,Gopeshwar
  (i). Area of forest land proposed to be diverted(in ha.) : 4.812   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.4.812    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 27375
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: Two
District 1. : Chamoli
  (a). Village: paingarh   (b). Area(in ha.): 5.912   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 2382,2383,2011,1304   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 2. : Chamoli
  (a). Village: paingarh   (b). Area(in ha.): 3.712   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 276   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1comparative Statement of identified alignment for the road
2Benefited Village(s) ,Families, Population Certificate
3CA land
4CA scheme in Civil and Soyam
5Certificate for Not staring the work
6Certificate of falling minimum of trees during the project work
7Certificate regarding suitability identified land of compensatory Afforestation by DFO
8Certificate that no historical monumental or religious place will be affected
9Certificate that no violation of the FA 1980 has taken place
10certificate to follow the conditions imposed by task force
11Details of trees with their Scientific Name
12Geologist report
13Muck Disposal Scheme
14No alternative suitable non-forest land is available for the project and that demand is barest to the minimum
15NOC of the Gram sabha
16Preliminary Joint Inspection report
17Understanding of payment of NPV,if Honable Supreme Court increases the rates of NPV
18Undertaking by the User Agency to bear the cost of CA
19Undertaking by the User Agency to bear the cost of road side plantation
20NOC for Muck disposal
21Narrative and Importance of the project.
22Undertaking to provide alternative fuel wood ,kerosene or LPG to labourers involved in the projectUndertaking to provide alternative fuel wood ,kerosene or LPG to labourer involved in the project
23Photograph of the road
24Estimates of RCC piller for demarcation of Forest
25Part-1
26Ownership NOC
27Undertaking regarding no animal will be affected side plantation
28Geologist and Task force recommendation
29Administrative and Financial sanction
30Variation Extent
31Muck disposal Plan
32Administrative and financial Sanction of the Project.
33Aerial Distance from Wildlife sanctuary/National Prak
34Land Schedule
35Bar Chart
36Lenght and Width Details of the Road
37NPV Calculation certificate