FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/23851/2017   (ii). Name of Project for which Forest Land is required : Construction of mustik sour kuroli motor road from kankradi bend to kisanpur manpur motor road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : After road construction .village kankradi .serpur ,kuroli,bongadi and kisanpur ,manpur connect by road and all village purchege all goods in market.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 77.7   (viii). Area of forest land proposed for diversion(in ha.): 1.163   (ix). Non-forest land required for this project(in ha.): 0.113   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PROVINCIAL DIVISION PWD BHATWARI   (ii). Address1 : Provincial Division PWD Bhatwari Distt-Uttarkashi   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Uttarkashi   (vi). Pin : 249135   (vii). Landmark : NIL   (viii). Email address : eepwdbhatwari@rediffmail.com   (ix). Landline Telephone No. : 1374-244321   (x). Fax No. : 1374-0   (xi). Mobile No. : 8192928867   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Rajendra   (ii). Middle Name: Singh   (iii). Last Name: Khatri   (iv). Gender: Male   (v). Designation: Exicutive Engineer   (vi). Address 1: Provincial Division PWD Bhatwari Distt-Uttarkashi   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Uttarkashi   (x). Tehsil: Bhatwari   (xi). Pin: 249135   (xii). Landmark: NIL   (xiii). Email Address: eepwdbhatwari@rediffmail.com   (xiv). Landline Telephone No.: 1374-244321   (xv). Fax No.: NIL   (xvi). Mobile No.: 9411384150   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1Under Processing at State GovernmentFP/UK/Road/49632/20202.1250
Total 2.125 0
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Uttarkashi1.1630.113
Total1.1630.113
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Uttarkashi1.1630.113
Total1.1630.113
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Kankrari1.1630.113
Total 1.163 0.113
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road0.9630
2Dumping0.20
Total 1.163 0
C. Maps of forest land proposed to be diverted
Division 1. : Uttarkashi
  (i). Area of forest land proposed to be diverted(in ha.) : 1.163   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.1.163    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 36500
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Uttarkashi
  (a). Village: Genwala   (b). Area(in ha.): 2.326   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 1638,4951,4996   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1partivedan
2certificate
3geo
4user agency part 1
5joint inspection
6all road map
7geolist report
8land shedule
9muck disposal
10sanction Govt.oder
11latter
12title page
13map
14EDS Date 10-05-2018 DFO
15EDS DFO
16The Hard copy already sent to the letter of EE PWD bhatwari no 120/3bh.a dt 13/07/18
17EDS date 28/8/2018
18EDS 18-2-19
19NPV
20Site inspection report
21FRA Document
22EDS 17-5-19
23Hard copy already sand
24sir correct all objection and sand hard copy in 4 set.
25sir all required document (forest proposal) hard copy submitted in DFO office Uttarkashi
26Aerial distance certificate uploaded .
27EDS 01-10-2019
28vishaya suchi
29Banj burance certificate
30labhavint village
3110 guni tree
32Muck disposal certificate
33dumping zone
34anya koi vakalpic bhumi certificate
35Dharmik Sthal n ahone ka certificate
36Geologist report
37Enviromental certificate
38Kshati purak certificate
39Lambai Chorai certificate
40mimimum Brikshau ka patan
41National Pakr Certi ficate
42NPV Akalan certificate
43NPV Deyata certificate
44Task force certificate
45EDS Kankrari 28-12-2019
46EDS 12/03/2020
47EDS 8-6-20
48EDS 8-6-20
49EDS 23-06-2020 DFO Sir Uttarkashi