FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/19158/2016   (ii). Name of Project for which Forest Land is required : 2 Lane Widening of NH 123 (507) Km 75 to 101 Motor Road in Distt. Uttrakashi   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Forest land diversion is requested for project named 2 Lane Widening on NH 123 (507) from Km 75 to 101 in the State of Uttarakhand. For this project 31.86ha, 14.94ha forest and non-forest land respectively need to be diverted. This is the main route used by pilgrims for visiting Yamunotri Dham. It a   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 1250.24   (viii). Area of forest land proposed for diversion(in ha.): 31.86   (ix). Non-forest land required for this project(in ha.): 14.94   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : NATIONAL HIGHWAY AUTHORTY OF INDIA PIU DEHRADUN   (ii). Address1 : Office of The Executive Engineer, N.H. P.W.D. Barkot, Uttarakashi   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Uttarkashi   (vi). Pin : 249141   (vii). Landmark : opp. of SBI   (viii). Email address : eenhpwdbarkot@gmail.com   (ix). Landline Telephone No. : 1375-224426   (x). Fax No. : 1375-224426   (xi). Mobile No. : 9917869716   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Vinod   (ii). Middle Name: Parsad   (iii). Last Name: Dobriyal   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: Office of The Executive Engineer, N.H. P.W.D. Barkot, Uttarakashi   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Uttarkashi   (x). Tehsil: Badkot   (xi). Pin: 249141   (xii). Landmark: opp. of SBI   (xiii). Email Address: eepwdnhbarkotuk@gmail.com   (xiv). Landline Telephone No.: 1375-224426   (xv). Fax No.: 01375224426   (xvi). Mobile No.: 9917869716   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Upper Yamuna,Barkot31.8614.94
Total31.8614.94
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Uttarkashi31.8614.94
Total31.8614.94
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Rikhau3.5640.36
2Badogi7.5630.36
3Kandari1.1990.99
4Khamundi Malli0.8210.27
5Singuni6.3130.45
6Fifiyara1.8480.9
7Kuan0.80.9
8Jarda3.6740.18
9Billa2.4622.26
10Sauli0.5970.18
11Dhari walli0.2250.9
12Naugaon0.3763.6
13Mungra0.6231.62
14Muradi0.8951.97
15Soli (Reserve Forest land)0.90
Total 31.86 14.94
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Muck Disposal6.3820.59
2Road Widening25.47811.873
Total 31.86 12.463
C. Maps of forest land proposed to be diverted
Division 1. : Upper Yamuna,Barkot
  (i). Area of forest land proposed to be diverted(in ha.) : 31.86   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.31.86    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: New Alignment not proposed, only widening of old N
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 800
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: Seven
District 1. : Uttarkashi
  (a). Village: Fepiyara,Bhundgaon, Kandari, Khumandi Mulli, Klonggoaun,Matla,fuangaon   (b). Area(in ha.): 63.72   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 955,956,344,1121,1136,1145,1147,1151,1149,2663,1380,968,2187,50,53,56,67,123,125,126,852,856,327   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Compensatory
2formate Govt. of India
3Geo Report
4Government Order
5Muck Disposal
6No Objection Certificate
7Out Trun
8Specify Conditions
9Task Force
10Supporting Document-1
11Supporting Document-2
12Digtal Map
13Topo Sheet
14FRA
15Justification
16D M Order
17Khatoni
18Ownership Proof
19Approval Latter
20MOU Document
21Re Submitted Topo Sheet
22Geo Map
23land schedule reuploaded
24survey of india toposheet reuploaded
25geo referencing digital sheet re uploaded
26muck disposal plan re uploaded
27Photo of CA Plantations area
28
29cost fenifite
30SIGINED TOPO SHEET
31Point wide eds reply with saparator
32covering letter
33justification
34NPV, BARCHART, ETC.
35VCL MEETING FRA AND ETC
36CA scheme and site suitability certificate
37Village wise Break up 2024
38Work Not Start Certificate 2024
39VLC Meeting 2024
40Tree Counting 2024
41NPV 2024
42Aerial Distance Certificate 2024
43Baar Chart 2024
44Site Suitability Cerificate CA Land 2024
45Georefrence Map CA Land 2024
463 Village CA Land and Estimate 2024
47Topomap New 2024
48CA Joint Visit or 3 New villiage CA Land and Estimate 2024
49CA Joint Visit or 4 old villiage CA Land and Estimate 2024
50Cost Benifit Ratio 2024
51Forwarding letter Nov 2024
52DM Order 2024
53Covering Letter /Forwarding Letter 2024
54Covering/Forwarding Letter 2024
55Topomap New 2024
56Geomap New 2024
57CA And Eco Plan Nov 2024 F