FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/17177/2015   (ii). Name of Project for which Forest Land is required : Chapoli to Takoli-Chamogi via Bhainswari motor road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The proposed road for connectivity of Unconnected village Takoli and Chapoli and its habitations (Chamogi and Bhainswari) which total population 968 and road length is 4.00 km. In Present there have no any alternative alignment. So this alignment is essential and benificial for villagers   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 30.2   (viii). Area of forest land proposed for diversion(in ha.): 1.746   (ix). Non-forest land required for this project(in ha.): 1.854   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : PWD   (ii). Address1 : T.D.,P.W.D. SRINAGAR , H.Q.- KIRTINAGAR, TEHRI GARHWAL, UTTARAKHAND   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Tehri Garhwal   (vi). Pin : 249161   (vii). Landmark : NIL   (viii). Email address : eepwdkirtinagar@rediffmail.com   (ix). Landline Telephone No. : 1370-260070   (x). Fax No. : 1370-260070   (xi). Mobile No. : 9412346710   (xii). Website (if any) : http://pwd.uk.gov.in   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Yatendra   (ii). Middle Name: Singh   (iii). Last Name: Rawat   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: T.D.,P.W.D. SRINAGAR , H.Q.- KIRTINAGAR, TEHRI GARHWAL, UTTARAKHAND   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Tehri Garhwal   (x). Tehsil: Devprayag   (xi). Pin: 249161   (xii). Landmark: NIL   (xiii). Email Address: eepwdkirtinagar@rediffmail.com   (xiv). Landline Telephone No.: 1370-260070   (xv). Fax No.: 01370260070   (xvi). Mobile No.: 9411143667   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tehri,New Tehri1.7461.854
Total1.7461.854
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tehri Garhwal1.7461.854
Total1.7461.854
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Chapoli1.7460
2Takoli01.854
Total 1.746 1.854
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road1.7461.854
Total 1.746 1.854
C. Maps of forest land proposed to be diverted
Division 1. : Tehri,New Tehri
  (i). Area of forest land proposed to be diverted(in ha.) : 1.746   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.1.746    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 5850
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Tehri Garhwal
  (a). Village: Chapoli   (b). Area(in ha.): 3.492   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 222, 223, 225, 660, 646, 1882, 833   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Swikriti, joint inspection, vaiklip samrekhan,mang nyuntam, land schedule
2pariyojana lambai or chaodai, bar chart, chati purak vriksharopan civil, chati purak vriksharopan van sthal upyukta praman patra
3muc dumping
4national park, anapatti praman patra, van sanrakshan 1980
5Aam sabha ka anapatti praman patra
6bhu vaigyanik aakhya
7Dharamik sthal na hona, vanya jivo ka praman patra, matti tail, gramo, parivaro ke praman patra
8Leej rent praman patra, leej avadhi praman patra,
9R.C.C.
10karya aarambh na hone ka praman patra
11N.P.V.
12lagat labh
13Village wise and component wise breakup are not possible due to village name include in project has to be habitation of main village Chapoli as per land schedule and certificate give by the D.M. and component of compensatory afforestation land schedule to be attached
1429 aug query reaply
1520_jan_2017 EDS query answer
16EDS_reply_17177_2015_Takoli_Chamogi.pdf
17EDS at dated 26.08.2016
1810 Varshiya Chatipurak Vriksharopan yojna with Path Variksharopan yojna
19EDS at dated 07 October 2017
20Letter and 10 varshiya chatipurak vriksharopan and path vriksharopan estimate
21EDS query 24-01-2018 and answer at dated 28-02-2018