A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/UK/ROAD/16066/2015
(ii). Name of Project for which Forest Land is required :
Construction of Syal Dobha to Khali Khamoli Motor road from Maniguh motor road
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
This road is starts form Km 6 of Dyuladhar Ganeshnagar at Maniguh. This road length is 3 Km and connect village Patala tok, Syal Dobha, Bandi tok, Gair patal, Bhuter, Khalyun etc villagers
(iv). State :
Uttarakhand
(v). Category of the Proposal :
Road
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
18.63
(viii). Area of forest land proposed for diversion(in ha.):
0.385
(ix). Non-forest land required for this project(in ha.):
1.715
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
PUBLIC WORK DEPARTMENT
(ii). Address1 :
PWD PROVINCIAL DIVISION RUDRAPRAYAG
(iii). Address2 :
UTTARAKHAND
(iv). State :
Uttarakhand
(v). District :
Rudraprayag
(vi). Pin :
246171
(vii). Landmark :
NIL
(viii). Email address :
eepwd_rpg@rediffmail.com
(ix). Landline Telephone No. :
1364-233204
(x). Fax No. :
1364-0
(xi). Mobile No. :
9536748167
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
Er Indrajit
(ii). Middle Name:
NIL
(iii). Last Name:
Bose
(iv). Gender:
Male
(v). Designation:
EXEUTIVE ENGINEER
(vi). Address 1:
P.D. PWD RUDRAPRAYAG
(vii). Address 2:
NIL
(viii). State:
Uttarakhand
(ix). District:
Rudraprayag
(x). Tehsil:
Rudraprayag
(xi). Pin:
246171
(xii). Landmark:
NIL
(xiii). Email Address:
eepwd_rpg@rediffmail.com
(xiv). Landline Telephone No.:
1364-233204
(xv). Fax No.:
NIL
(xvi). Mobile No.:
7500217670
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Rudraprayag
0.385
1.715
Total
0.385
1.715
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Rudraprayag
0.385
1.715
Total
0.385
1.715
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Maniguh
0.385
1.715
Total
0.385
1.715
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Road Construction
0.385
1.715
2
Muck dumping (in private land)
0
0
Total
0.385
1.715
C.
Maps of forest land proposed to be diverted
Division 1. : Rudraprayag
(i). Area of forest land proposed to be diverted(in ha.) :
0.385
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.385
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
15
(iii). Temporary Employment(Number of person-days):
25
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Cover page, index, Report
2
G.O.
3
Part I
4
Task force & Manak rule
5
Fact sheet
6
Maps
7
Part II, Joint Survey, Min demand of land, Land Schedule, LxB of Project, Barchart
8
CA calculation & CA calculation on blank space of road, Value of trees
9
National park, ACT 1980, Historical place, NPV, Catch plan, Distance of National park, Photographs
10
Part III to V
11
Geological Report
12
Layout plan, No loss of wild life, Gas/Kerosine, Benefited villagers, RCC pillar etc
13
Agreement of villagers
14
muck plan
15
NOC of nap land
16
site inspection note
17
Hard copy submitted to Nodal and receiving letter attached
18
EDS removed as per given istruction with encloseres
19
Muck detail filled in B-2.4, village wise break up filled in B-2.3 maps are uploaded in C(iv), latter attached dated 22-06-2017 and NOC of Naap Land for Muck uploaded in other document Annexure 1
20
Annexure 1
21
EDS removed as per given instruction and latter attached dated 06-09-2017
22
On line portal part I
23
On line portal part II to V
24
Original Hard copy submitted to Nodal and latter attached
25
EDS removed and lattera attached dated 21-12-2017
Print