FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/16041/2015   (ii). Name of Project for which Forest Land is required : Banderlima Harkhola Motor Road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Road under Pwd Askote which shall provide connectivity to villages Banderlima, Toli Chufat and Harkhola Motor Road etc.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 23.4   (viii). Area of forest land proposed for diversion(in ha.): 0.99   (ix). Non-forest land required for this project(in ha.): 2.655   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : CONSTRUCTION DIVISION PWD ASKOTE   (ii). Address1 : cd pwd askote   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Pithoragarh   (vi). Pin : 262501   (vii). Landmark : NIL   (viii). Email address : eepwdaskote@gmail.com   (ix). Landline Telephone No. : 5964-238724   (x). Fax No. : 5964-0   (xi). Mobile No. : 9412977325   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Suman   (ii). Middle Name: NIL   (iii). Last Name: Bora   (iv). Gender: Female   (v). Designation: Junior engineer   (vi). Address 1: ee cd pwd askote   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Pithoragarh   (x). Tehsil: Didihat   (xi). Pin: 262501   (xii). Landmark: NIL   (xiii). Email Address: eepwdaskote@gmail.com   (xiv). Landline Telephone No.: 5964-238724   (xv). Fax No.: NIL   (xvi). Mobile No.: 8171630275   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pithoragarh0.992.655
Total0.992.655
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pithoragarh0.992.655
Total0.992.655
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Banderlima0.080.505
2Toli chufat0.912.15
Total 0.99 2.655
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road0.9452.655
2Muck Disposal0.0450
Total 0.99 2.655
C. Maps of forest land proposed to be diverted
Division 1. : Pithoragarh
  (i). Area of forest land proposed to be diverted(in ha.) : 0.99   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.99    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined: No Data
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 2000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
12-1 A Short Narrative
22-2 Admistrative&Finacial
32-4 Compaerative Chart
42-5 DM Crt-Alternate suitable non-forest land
52-5 DM Crt-Alternate suitable non-forest land
62-6 Land schedule
72-7 Category wise Land
82-8 Barchart
92-12 Road side gap filling Plantatio
102-13 User Agency to bear Road side gap filling Plantation
112-16 Felling Oak trees
122-20 National Park
132-21 Cert of CCA 10km
142-23 1980
152-24 Noc Gram Sabhas
162-27 Cert Work not start
172-28 Geologist Report
182-29 Task Force report
192-30 31 Standard Condition
202-30 31 Standard Condition
212-32 Geologist condition to Taskforce cert
222-33 No Historical monumental
232-34 No Animal effected
242-35 LPG kerosene
252-38 Increasing Payment Of NPV
262-39 Cost of forest land and lease rent crt by DM
272-42 Cost for dimarcation of work(RCC)
282-44 Check List
29Extra
302-15 Details of tree with BOTANICAL name
31Banderleema Harkhola letter_DFO
32Objection Remove as pr CF letter no 2162/12-(2) Dated 19 Jan 2017
33Objection Remove as pr CF letter no 2162/12-(2) Dated 19 Jan 2017
34Objection removed as per CF letter 3503/12/1 Dated 8/5/2018
352-3 Preliminary joint Inspection Report
362-15 Tree list
37Objection removed as per CF letter 3503/12/1 Dated 8/5/2018
38forwarding letter of submitted hard copy to Nodal And CF
39Objection removed on dated 1-08-2019
40Nodal receiving
41Objection removed on dated 5-8-2019
42Hard copy has been send to nodal office d.dun
43Hard copy has been send to nodal office d.dun on dated 07-10-2019 receiving attached
442-36 Benifited Village
452-37CalculationcertofNPV
46Objection Removed Letter with attachment on dated 1-07-2020
47CWLW NOC Dated 29-08-2020
482-19 Muck Disposal Final Dated 29-8-2020
49Objection as pr GOI letter no 8V/UCP/06/199/2019/FC/625 Dated 15-07- 2020 removed on dated 29-08-2020