FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/15527/2015   (ii). Name of Project for which Forest Land is required : Khand gaon to Rautal Motor road at Chinyalisaur Block   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : A new road of 6 km long is sanction to connect Rautal vill. to Block Headquarter under S.Sector. After the Alingment Survey, the road length found 4.75 km to connect Rautal. Presently Rautal vill. not connected with the road. After construction of this road, village Rautal will be connected.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 75.6   (viii). Area of forest land proposed for diversion(in ha.): 1.525   (ix). Non-forest land required for this project(in ha.): 2.3625   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : EXECUTIVE ENGINEER   (ii). Address1 : Construction Division PWD, Chinyalisaur   (iii). Address2 : Uttarkashi   (iv). State : Uttarakhand   (v). District : Uttarkashi   (vi). Pin : 249196   (vii). Landmark : NIL   (viii). Email address : eecdpwd_uki@rediffmail.com   (ix). Landline Telephone No. : 1371-237084   (x). Fax No. : NIL   (xi). Mobile No. : 9412959004   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: suresh   (ii). Middle Name: Kumar   (iii). Last Name: tomar   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: Construction Division, P.W.D., Chinyalisaur   (vii). Address 2: Uttarkashi   (viii). State: Uttarakhand   (ix). District: Uttarkashi   (x). Tehsil: NIL   (xi). Pin: 249196   (xii). Landmark: NIL   (xiii). Email Address: eecdpwd_uki@rediffmail.com   (xiv). Landline Telephone No.: 1371-237084   (xv). Fax No.: 01371237084   (xvi). Mobile No.: 7579186700   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Uttarkashi1.5252.3625
Total1.5252.3625
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Uttarkashi1.5252.3625
Total1.5252.3625
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Khand1.5250.2275
2Rautal02.135
Total 1.525 2.3625
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road0.96252.3625
2Dumping Yard 10.18750
3Dumping Yard 20.1250
4Dumping Yard 30.250
Total 1.525 2.3625
C. Maps of forest land proposed to be diverted
Division 1. : Uttarkashi
  (i). Area of forest land proposed to be diverted(in ha.) : 1.525   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.1.525    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 15000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Uttarkashi
  (a). Village: Dang   (b). Area(in ha.): 3.05   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 1532 1533   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Certificate for level difference
2Administrative and financial sanction
3Note containing justification for locating the Project in forest land (FCA)
4Site Inspection report not below the rank of DCF
5Preliminary joint inspection report
6Land shedule
7Category wise land length, width and area in Ha.
8Details of trees with their scientific name in RF/Civil Soyam/Van panchyat/Privite Notified land and in Naap land
9Certificate for felling minimum trees during the Project work
10Certificate for airial distance from National park or Sanctuary
11Certificate regarding suitability of indentified land for CA
12Barchart with index
13Certificate for bear the cost of road side_gap filling Plantation
14Compensatory afforestation scheme in civil and soyam land (ten times)
15Certificate for to bear the cost of CA
16Certificate for to bear the cost of CA
17NOC from Local Gram Sabhas
18Project length and width certificate
19Comperative chart showing statement of both Alignment or alternate site explored for the proposed project and reason for their rejection
20Certificate- work has not been started reg.
21Geologist report
22Task Force Certificate
23Certificate for complying the condition imposed in standard condition
24Certificate for complying the condition imposed in Geologist report/task force recommendation in hill areas
25No historical/ monumental or relegeous place will be effected certificate reg.
26Undertaking regarding no animal will be effected adversely by the project
27Undertaking to provide alternative fuel wood Kerosene or LPG to labours involved in project
28Benefited villages Families Population certificate
29No voilation has taken place FC Act 1980 reg.
30Certificate for Enviorment sanction
31NPV calculation certificate as per Hon'ble Supreem Court
32Undertaking of payment of NPV if Hon'ble Supreem Court increases the rates the NPV
33Cost of the forest land and lease rent certificate
34Certificate for non Isthal Vishist (special place)
35Muck Disposal scheme
36Muck Disposal scheme photo and map
37Check list and Fact sheet
38Objection removed. CA patch uploaded at L(iv)f, g and h.
39Report
40letter
41Noc Of Village Khandgaon
42dencity cirtificate for NPV
43VLC for village Khand
44objection clear letter
45all document of this motor road has been sent.
46letter
47
48objection clear letter
49
50NPV
51Letter of objection clear
52letter of last objection which is cleard. and hard sent to forest department.
53letter objection clear
54objection clear letter of khnad to rauntal motor road
55justification authenticated by DFO
56vlc report
57objection reply letter
58letter
59letter
60letter of objection clear of khand gaon to rauntal motor road and hard copy send to DFO office.
61population cirtificate of village khand
62letter
63letter objection has been clear.
64Population Certificate
65letter EDS khandgaon motor road dt 16-10-2019
66Letter of Alternate Motor Road For Benifitted Village RAuntal.
67EDS Reply Letter
68jansankhya pramaan patra
69khand Motor Road letter
70letter 31.01.2020
71Answer letter of EDS no. 2934/12-1 kotbanglow dated 07/02/2020. with attached key plan
72letter reply of EDS
73EDS 23.06.2020 reoly letter
74
75LEtter of EDS 20/10/2020
76
77
78EDS Letter
79toposheet
80toposheet
81EDS Reply Dated19_06_2020