FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/150531/2021   (ii). Name of Project for which Forest Land is required : Construction Of Road and 60 m Span Bridge From Village Devipura To gyanpurgodi in Nanakmatta Constancy under TSP   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Construction Road and Bridge Facilitate villagers Pucca road and Carriage of agricultural product to market it increases living Slandered and income of villagers   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 581.04   (viii). Area of forest land proposed for diversion(in ha.): 0.98   (ix). Non-forest land required for this project(in ha.): 0.546   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : District Youth Services & Sports Hamirpur   (ii). Address1 : Construction Division PWD Khatima   (iii). Address2 : NIL   (iv). State : Himachal Pradesh   (v). District : Hamirpur   (vi). Pin : 262308   (vii). Landmark : NIL   (viii). Email address : eepwdkhatima@gmail.com   (ix). Landline Telephone No. : 0--   (x). Fax No. : 0-   (xi). Mobile No. : 9927953807   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Gopal   (ii). Middle Name: NIL   (iii). Last Name: Goswami   (iv). Gender: NIL   (v). Designation: AAE   (vi). Address 1: Construction Division PWD Khatima   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Udham Singh Nagar   (x). Tehsil: NIL   (xi). Pin: 262308   (xii). Landmark: NIL   (xiii). Email Address: eepwdkhatima@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 9837636967   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tarai East,Haldwani0.980.546
Total0.980.546
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Udham Singh Nagar0.980.546
Total0.980.546
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Devipura Tok Gyanpur Godi0.980.546
Total 0.98 0.546
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road0.980.546
Total 0.98 0.546
C. Maps of forest land proposed to be diverted
Division 1. : Tarai East,Haldwani
  (i). Area of forest land proposed to be diverted(in ha.) : 0.98   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.98    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 35000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Part 1.pdf
2check list.pdf
3Quarry Raised by DFO , Haldwani Has been Resolved.
4790/1bsc dated 21-05-2022
5reply of online observations
6Certificate for construction of road on sanction Alignment
7Reply Letter 1452 12C 28 07 2022
8Certificate by RO No working permission
9Certificate By EE for No tree Cutting
10Tree counts and Botnical name on Senction alignment
11Tree counts and Botanical name on Alternate alignment
12Reply letter of DFO 1504 12.1 15.09.2022
13Minimum land for Dm.pdf
14Land Schedule.pdf
15Work not start certificate
16Layout plan
17partivaden
18Index page
19Length n width of project
20bar chart
21Joint inspection report
22Work not start certificate
23Affected tree counts on proposed alignment
24Banj tree certificate
25Rejection of alternative alignment for road n bridge
26No tree affected certificate
27Not a part of National park certificate
28Arial distance from national park certificate
29Minimum tree affected certificate
30Cost Profit analysis
31N o C by villagers
32Complaince of Geologists certificate
33Task force
34FRA
35Animal's safety
36Standard condition certificate
37Both sides plantation certificate
38minimum 100 tree plantation estimate
39Muck disposal certificate
40land upyukt certificate for plantation
41Historical places
42LPG use certificate
437years plantation plan
44NPV estimate
45NPV on extended rates certificate
46leased rent certificate
47CA land pillar marking
48Non violation of FC act
49Authority letter for uploading
50certificate for lease period
51Minimum land for Dm.pdf
52government ORDER
53Benifits villagerss
54partivaden
55Length n width of project
56Layout plan
57Geologist report
58Reply letter 2492 12 1 dtd 11 11 2022 (2)
59Reply letter 2492 12 1 dtd 11 11 2022 (2)
60Reply letter 2492 12 1 dtd 11 11 2022
61Reply letter 2492 12 1 dtd 11 11 2022
62Reply of DFO office letter