FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/13390/2015   (ii). Name of Project for which Forest Land is required : ringalgarh to darak motor road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : This road start from km 46 of raipur kumalda kaddukhal motor road and this will benefit the villagers of ringalgarh, hanuman garh and other nearby villages. Total length 3.00 km sanction cost 37.80 lakhs.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 37.8   (viii). Area of forest land proposed for diversion(in ha.): 2.295   (ix). Non-forest land required for this project(in ha.): 2.007   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PUBLIC WORKS DEPARTMENT   (ii). Address1 : E.E. Ty. Divi. P.W.D. Thatyur Tehri Garhwal   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Tehri Garhwal   (vi). Pin : 249180   (vii). Landmark : NIL   (viii). Email address : eepwdthatyur@rediffmail.com   (ix). Landline Telephone No. : 1376-246321   (x). Fax No. : 1376-135   (xi). Mobile No. : 9557823200   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Rajnish   (ii). Middle Name: NIL   (iii). Last Name: Kumar   (iv). Gender: Male   (v). Designation: Excutive Engineer   (vi). Address 1: E.E. Ty. Divi. P.W.D. Thatyur Tehri Garhwal   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Tehri Garhwal   (x). Tehsil: NIL   (xi). Pin: 249180   (xii). Landmark: NIL   (xiii). Email Address: eepwdthatyur@rediffmail.com   (xiv). Landline Telephone No.: 1376-246321   (xv). Fax No.: 01352631759   (xvi). Mobile No.: 9557823200   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1ReturnedFP/UK/ROAD/37504/2018375044.81950
Total 4.8195 0
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Mussoorie2.2952.007
Total2.2952.007
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tehri Garhwal2.2952.007
Total2.2952.007
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1ringalgarh2.2951.158
Total 2.295 1.158
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1road2.2950.405
2muck disposal00.753
Total 2.295 1.158
C. Maps of forest land proposed to be diverted
Division 1. : Mussoorie
  (i). Area of forest land proposed to be diverted(in ha.) : 2.295   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.2.295    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 12000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Tehri Garhwal
  (a). Village: ringalgarh   (b). Area(in ha.): 5   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 250,268,299,817,818   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1bar chart
2certificate of land and width
3certificate of land from D.M.
4certificate of national park
5certificate
6cost benefit ratio
7cover page
8estimate of forest
9fax sheet
10form 9
11geologist report
12geo refrenced map
13geo refrenced map CA
14geo refrenced map
15govt. order
16index
17joint inspection report
18khasra khautani of ca
19khautani NZA
20land schedule
21map
22muk disposal
23NOC
24NOC
25NOC
26NOC
27NPV certificate
28part I to V
29patwari map
30project report
31rate list of land schedule
32certificate of rcc pillars
33report
34rules and regulation
35site inspection report
36task force certificate
37topo sheet of CA
38topo sheet
39trees
40undertaking
41govt order
42objection cleared, raised on 14 oct 2016.
43shortcomings of 07 april 2017 correct
44land schedule
45reply of dfo mussorie letter no. 890 dt. 11-09-2017
46land schedule and total number of trees
47reply of dfo mussorie letter no. 1320/ dated mussorie 04-10-2017
48reply of dfo mussorie letter no. 2032/12-1 dated mussorie 06-12-2016
493 copies of forest file submitted at nodal office Indiranagar forest colony dehradun.
50reply of dfo mussorie letter no. 4024/12-1 dated mussorie 25-05-2018
51NPV
52reply of dfo mussorie letter no. 222/12-1 dated mussorie 19-07-2018
53FRA papers
54bar chart
55part V
56justification
57project report
58muck disposal plan and its calculation
59authority letter
60reply of DFO Mussorrie letter no. 1411/12-1 dated 03-11-2018
61toposheet CA
62reply of DFO letter no. 2289/12-1dated mussorrie 30 jan 2019
63reply of letter no. 8B/U.C.P./06/102/2018/ F.C./92 dated 18-04-2019, online received from DFO mussorrie on 28/04/2019
64reply of eds dated 19.07.2019
65shortcoming letter
66shortcomings lettet EDS dated 27-09-2019
67reply of shortcomings raised by DFO on 21.12.2019