FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/120677/2021   (ii). Name of Project for which Forest Land is required : Construction of Panyapodi Toli Gwalgaon Motor Road 7.750 Km   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Construction of Panyapodi Toli Gwalgaon Motor Road give the connectivity to all villagers of Toli(Gwalgaon) with Tanakpur-Twaghat motor road. Length of the motor road is 7.750 Km.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 4   (viii). Area of forest land proposed for diversion(in ha.): 3.875   (ix). Non-forest land required for this project(in ha.): 3.6   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : CONSTRUCTION DIVISION PWD ASKOTE   (ii). Address1 : cd pwd askote   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Pithoragarh   (vi). Pin : 262501   (vii). Landmark : NIL   (viii). Email address : eepwdaskote@gmail.com   (ix). Landline Telephone No. : 5964-238724   (x). Fax No. : 5964-0   (xi). Mobile No. : 9412977325   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Suman   (ii). Middle Name: NIL   (iii). Last Name: Bora   (iv). Gender: Female   (v). Designation: Junior engineer   (vi). Address 1: ee cd pwd askote   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Pithoragarh   (x). Tehsil: Didihat   (xi). Pin: 262501   (xii). Landmark: NIL   (xiii). Email Address: eepwdaskote@gmail.com   (xiv). Landline Telephone No.: 5964-238724   (xv). Fax No.: NIL   (xvi). Mobile No.: 8171630275   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pithoragarh3.8753.6
Total3.8753.6
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pithoragarh3.8753.6
Total3.8753.6
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Toli (Gwalgaon)3.8753.6
Total 3.875 3.6
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road3.3753.6
2Muck Disposal0.50
Total 3.875 3.6
C. Maps of forest land proposed to be diverted
Division 1. : Pithoragarh
  (i). Area of forest land proposed to be diverted(in ha.) : 3.875   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.3.875    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 2000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Pithoragarh
  (a). Village: Ringu Munsyari   (b). Area(in ha.): 7.75   (c). Copy of KML file of the patch:     View File   (d). Khasra details: khata no- 61, khasra no-329,337,340,344,348,350,353,355,359,361,363,365,367,369,371,384-387,393,413,2024,2036,2042,2437,2438   (e). Present owner: User Agency   (f). Copy of Ownership proof:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
12-1 A Short Narrative
22-2 Admistrative&Finacial
32-4 Compaerative Chart
42-5 DM Crt-Alternate suitable non-forest land
52-6 Land schedule
62-8 Barchart
72-11 User Agency to bear the cost of CA
82-12 Road side gap filling Plantatio
92-13 User Agency to bear Road side gap filling Plantation
102-15 Details of tree with name
112-16 Felling Oak trees
122-18 Cert of felling minimum Trees
132-21 Cert of CCA 10km
142-23 1980
152-24 Noc Gram Sabhas
162-27 Cert Work not start
172-28 Geologist Report
182-29 Task Force report
192-30 Standard Condition
202-31 Cert Geologist task fprce
212-32 No Historical monumental
222-33 No Animal effected
232-34 LPG kerosene
242-35 Benefited villages
252-37 Increasing Payment Of NPV
262-38 Cost of forest land and lease rent crt by DM
272-40 RCC Pillar
282-41 Cost Of Demarcation
29others
30Check list Fact sheet
31objection removed on 20.04.2021
32objection removed on 17.06.2021. hard copy submitted, receiving attached
332-20 National Park .pdf
34aerial distance
35CWLW Certificate
362-7 Category wise land
37objection removed on 18.07.2021
382-3 Preliminary joint inspection report
392-19 Muck disposal
40check list
41objection removed on date 23.06.2022
422-9 10 yrs civil soyam land
432-36 calculation of NPV
44tree enumeration list in muck dumping area
45tree enumeration details for 7 mtr width
462-10 Crt regarding suitability of identified land for CA
47regarding requirement of animal passage
48objection removed on date 29.05.2023
49Tree list in muck dumping site
50objection removal letter dated 17-08-2023