FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/11139/2015   (ii). Name of Project for which Forest Land is required : Mastkhal to Sila Danda Motor Road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : This Project is Comes under Pradhan mantari Gramygghgghghghghghghj Sadak Yogna Norms. There is no other alternates except Forest Land to Connect this (Seeladanda) Village. This Road is important for the growth and development of local people and providing better convince to them for medical and educ   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 434.815555555   (viii). Area of forest land proposed for diversion(in ha.): 2.275   (ix). Non-forest land required for this project(in ha.): 2.335   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : EXECUTIVE ENGINEER   (ii). Address1 : Irrigation Division, PMGSY, Kotdwar   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Pauri Garhwal   (vi). Pin : 246149   (vii). Landmark : Near Sidhbali Madir Kotdwar   (viii). Email address : eepmgsykotdwara@rediffmail.com   (ix). Landline Telephone No. : 1382-229847   (x). Fax No. : 1382-1382   (xi). Mobile No. : 9412971613   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Satyaveer   (ii). Middle Name: Singh   (iii). Last Name: Tyagi   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: Irrigation Division, PMGSY, Kotdwar   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Pauri Garhwal   (x). Tehsil: Kotdwara   (xi). Pin: 246149   (xii). Landmark: Near Sidhbali Madir Kotdwar   (xiii). Email Address: eepmgsykotdwara@rediffmail.com   (xiv). Landline Telephone No.: 1382-229847   (xv). Fax No.: 01382229847   (xvi). Mobile No.: 9412971613   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Soil Conservation,Lansdowne2.2752.335
Total2.2752.335
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pauri Garhwal2.2752.335
Total2.2752.335
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1siladanda2.2752.335
Total 2.275 2.335
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road (Civil Soyam van bhoomi)1.042.335
2Road (Van Panchayat)0.3850
3Muck Disposal (Civil Soyam bhoomi)0.850
Total 2.275 2.335
C. Maps of forest land proposed to be diverted
Division 1. : Soil Conservation,Lansdowne
  (i). Area of forest land proposed to be diverted(in ha.) : 2.275   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.2.275    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 9000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Pauri Garhwal
  (a). Village: siladanda   (b). Area(in ha.): 4.55   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 934   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1justification Government oders joint survey and inspection report aligment and land schedule
2bar chat compensatory afforestation and estimates of plantation and others
3FRA and NOC and Geological Survay Report
4Miscellaneous others
5no objection certificate issued by van panchayat sarpanch sila danda
6NOC by van panchayat sarpanch
7tree in the mastkhal to seeladanda motor road
8please check upload letter
9Receiving and Acknowledgment slip
10remore objection dt 23-07-2018
11C.A Tree Rate By DFO
12Detailed muck disposal plan
13NPV Rate
14Mastkhal objection and quarry remove letter no 1297 dt 10-10-2018
15Query Remove letter dt 28-02-2019
16Geologist Report
1710 years CA area
18Muck Disposal plan and photograph
19Work not start by DFO
20Forwarding letter dt 27-06-2019
21Forest Nodal objection letter no 476 dt 13-08-2019