FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/10979/2015   (ii). Name of Project for which Forest Land is required : Construction of Nauli Bend to Nauli Village Motor Road under District Sector   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : This road is starts form Km 13 of Tilwara-Bhardar-Saurakhal Motor Road From Nauli Bend to Connect Village Nauli total area for diversion is 0.1025 HA   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 12.6   (viii). Area of forest land proposed for diversion(in ha.): 0.4025   (ix). Non-forest land required for this project(in ha.): 0.14   (x). Total period for which the forest land is proposed to be diverted(in years): 30
A-2. Details of User Agency
  (i). Name : PUBLIC WORK DEPARTMENT   (ii). Address1 : PWD PROVINCIAL DIVISION RUDRAPRAYAG   (iii). Address2 : UTTARAKHAND   (iv). State : Uttarakhand   (v). District : Rudraprayag   (vi). Pin : 246171   (vii). Landmark : NIL   (viii). Email address : eepwd_rpg@rediffmail.com   (ix). Landline Telephone No. : 1364-233204   (x). Fax No. : 1364-0   (xi). Mobile No. : 9536748167   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Er Indrajit   (ii). Middle Name: NIL   (iii). Last Name: Bose   (iv). Gender: Male   (v). Designation: EXEUTIVE ENGINEER   (vi). Address 1: P.D. PWD RUDRAPRAYAG   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Rudraprayag   (x). Tehsil: Rudraprayag   (xi). Pin: 246171   (xii). Landmark: NIL   (xiii). Email Address: eepwd_rpg@rediffmail.com   (xiv). Landline Telephone No.: 1364-233204   (xv). Fax No.: NIL   (xvi). Mobile No.: 7500217670   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Rudraprayag0.40250.14
Total0.40250.14
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Rudraprayag0.40250.14
Total0.40250.14
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Nauli0.40250.14
Total 0.4025 0.14
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road (forest land)0.40250
2Road (Naap land)00.031
3For muck dumping (Naap land)00.109
Total 0.4025 0.14
C. Maps of forest land proposed to be diverted
Division 1. : Rudraprayag
  (i). Area of forest land proposed to be diverted(in ha.) : 0.4025   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.4025    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 10   (iii). Temporary Employment(Number of person-days): 25
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1EDS removed and letter attached 22-06-2017
2Cover page, Check list, Fact sheet, Report
3G.O. Technical and financialreport
4Part I to V
5Joint Survey, Site Inspection
6Min demand of Land, Land schedule, LxB of Project, Bar chart
7CA Plan
8Geologist Report
9Task force certificate, Manak Shartein
10NPV, Value of Land
11National park, Act 1980, Layout plan, Reg/Historical Place, Gas/Kerosine, Benefited village, RCC pillar, Catch plan, Distance of National park, Soil erosion, Site Photographs, etc
12Receiving letter of Nodal
13EDS letter dated 23-01-2018
14EDS removed and letter attached dated 15-02-2018
15Muck plan and calculation
16Justification 1
17Justification 2
18EDS Letter dated 23-03-2018
19EDS letter dated 17-05-2018
20EDS letter dated 13-07-2018
21EDS latter dated 01-10-2018
22EDS letter dated 28-11-2018
23Receiving letter of revised muck dumping
24On line web poratal part II to V also provided with hard copy vide letter NO. 262/16C dated 20-01-2018
25On line web poratal part I also provided with hard copy vide letter NO. 262/16C dated 20-01-2018
26Hard copy sumbitted to Nodal and latter attached
27EDS letter dated 26-02-2019
28EDS letter dated 03-05-2019
29EDS letter dated 08-08-2019
30EDS removed and part I to III sent to Nodal office dated 15-09-2020