FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/UK/RAIL/151179/2022
(ii). Name of Project for which Forest Land is required :
Development of 126 Km Long New BG Rail Link Between Rishikesh to Karnprayag - Additional Forest Land Requirement for Providing connectivity to Portal P1 of Tunnel (T2) to Main Highway NH-56 at Shivpur
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The 126 Km long New BG Rail Link in the state is already under construction and the proposed land diversion is required to provide the connectivity of portal (P1) of Tunnel (T2) with Main Highway NH56 at Shivpuri
(iv). State :
Uttarakhand
(v). Category of the Proposal :
Railway
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
1500000
(viii). Area of forest land proposed for diversion(in ha.):
1.1206
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
CPM RISHIKESH OFFICE RAIL VIKAS NIGAM LIMITED
(ii). Address1 :
RVNL Office Building, Opposite GST Bhawan, Next to GMVN, Shyampur Bypass Road, Rishikesh
(iii). Address2 :
Rishikesh
(iv). State :
Uttarakhand
(v). District :
Dehradun
(vi). Pin :
249201
(vii). Landmark :
Opposite GST Bhawan
(viii). Email address :
rvnlrksh1@gmail.com
(ix). Landline Telephone No. :
135-2442008
(x). Fax No. :
135-
(xi). Mobile No. :
8755907868
(xii). Website (if any) :
www.rvnl.org
(xiii). Legal status of User Agency :
Central PSU
A-3.
Details of Person Making Application
(i). First Name:
Bhanu
(ii). Middle Name:
NIL
(iii). Last Name:
Prakash
(iv). Gender:
Male
(v). Designation:
General Manager Projects I
(vi). Address 1:
Rail Vikas Nigam Limited
(vii). Address 2:
Ist Floor, August Kranti Bhawan, Bhikaji, Delhi
(viii). State:
Delhi
(ix). District:
South
(x). Tehsil:
Hauz Khas
(xi). Pin:
110066
(xii). Landmark:
Bhikaji Gama Place
(xiii). Email Address:
rvnlrksh1@gmail.com
(xiv). Landline Telephone No.:
11-26738503
(xv). Fax No.:
NIL
(xvi). Mobile No.:
8755907868
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
1
Approved
FP/UK/RAIL/14375/2015
8B/UCP/07196/2015-FC
63.422
63.422
10 Oct 2016
27 Apr 2017
2
Approved
FP/UK/RAIL/16947/2015
8B/UCP/07/31/2016/FC
500.5996
500.5996
29 Aug 2017
20 Feb 2018
3
Approved
FP/UK/RAIL/34889/2018
8B/UCP/07/18/2019/FC
1.5205
1.5205
22 Apr 2019
02 Sep 2019
Total
565.5421
565.5421
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Narendranagar,Munikireti
1.1206
0
Total
1.1206
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Tehri Garhwal
1.1206
0
Total
1.1206
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Bavani Shivpuri
1.1206
0
Total
1.1206
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Approach Road
1.1206
0
Total
1.1206
0
C.
Maps of forest land proposed to be diverted
Division 1. : Narendranagar,Munikireti
(i). Area of forest land proposed to be diverted(in ha.) :
1.1206
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
1.1206
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
450
(iii). Temporary Employment(Number of person-days):
16352000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Part I
2
Part II
3
Part III
4
Part IV
5
Power of Attorney (POA)
6
Certificate for Financial Assistance
7
Digital Map of Proposed Diversion
8
Topo Map of Proposed Diversion
9
Primary Joint Inspection
10
Justification for Locating in Forest Area
11
NOC under FRA 2006 (DM Level Committe, SDM Level Committee and Gram Sabha)
12
Prativedan (Application)
13
SIR
14
Certificate for Minimum Demand of Land
15
Land Schedule
16
Length and Width of Proposed Diversion
17
Bar Chart
18
Certificate for Work Yet Not Started
19
No of Affected Trees
20
Financial Values of Affected Trees
21
Actual No of Trees to be Fell
22
Certificate for Banjh Vruksh
23
Certificate in case of non Affecting Trees- Not Applicable
24
Certificate for Min Tree to be Fell
25
Min Aerial Distance from Wildlife Boundary
26
Geological Report of Site
27
Undertaking to follow Geological Report
28
Task Force Certificate
29
Standard Conditions of MoEF&CC
30
CA -10 Years Planning and Calculations
31
CA Land Suitability Certificate
32
CA Land Topomap
33
CA Land Digital Map
34
Undertaking to provide higher NPV
35
Cost of Pillar
36
Alternative Analysis
37
Alternative Alignment Options
38
Part V
39
NOC From Wildlife Authority
40
Certificate if the projects falls within National Park or Wildlife Sanctuary
41
FRA NOC Cover Page
42
Layout Plan incase of Building or Hydropower Projects
43
Affidavit for not harming Animals or plants
44
Affidavit for providing kerosin or rasoi gas to laborer's
45
List of benefited villages from the pariyojna
46
Copy of Annual Lease Agreement
47
Affidavit for planting trees on vacant places
48
NOC incase of revenue Land
49
Copy of Agreement between user agency and land owners
50
Muck Disposal Plan
51
Certificate for Non-Voilation of FCA 1980 Act
52
Catchment Area Treatment Plan
53
NOC for Site free from religious or any historical Things
54
NOC from Wildlife Authority
55
Forwarding Letter 24.06.2022
56
CA Scheme 24.06.2022
57
Certificate for Work Not Yet Started 24.06.2022
58
FRA 24.06.2022
59
Justification 24.06.2022
60
Muck Disposal Plan 24.06.2022
61
CA Land Digital Map 24.06.2022
62
CA Land Topo Map 24.06.2022
63
NOC From Wildlife Authority Including Mitigation Plan 24.06.2022
64
Revised NPV 24.06.2022
65
Tree Enumeration 24.06.2022
66
Forwarding Letter Dated 06.12.2022
67
Response to IRO MOEF&CC dated 22.06.2022
68
Corrected SDM Level FRA dated 20.12.2022
69
Map Showing Old and New Alignment on Map along with DFO Sir Approval dated 20.12.2022
70
Justification with Area Marked dated 20.12.2022
71
Tree Enumeration with Area Marked and Date mentioned dated 20.12.2022
72
CA Scheme with area marked dated 20.12.2022
73
CA Scheme with area and name marked dated 20.12.2022
74
Muck Disposal Plan with DFO Sir Approval dated 20.06.2022
75
Drawing Showing requirement of 15m width for approach road dated 20.06.2022
76
Work Not Yet Started Certificate Dated 20.12.2022
77
Forwarding Letter dated April 20, 2023
Print