FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/UK/Others/9741/2015
(ii). Name of Project for which Forest Land is required :
Construction of 42 meter Span Steel Girder Motor bridge over Rupin river at Dhaula place in block Mori, Under CM Ghosna No. 394/2013.
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Construction of 42 meter Span Steel Girder Motor bridge over Rupin river at Dhaula place in block Mori, Under CM Ghosna No. 394/2013.
(iv). State :
Uttarakhand
(v). Category of the Proposal :
Others
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
168
(viii). Area of forest land proposed for diversion(in ha.):
0.224
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
PWD
(ii). Address1 :
Construction Division, P.W.D. Purola
(iii). Address2 :
District : Uttarkashi. (Uttarakhand)
(iv). State :
Uttarakhand
(v). District :
Uttarkashi
(vi). Pin :
249185
(vii). Landmark :
NIL
(viii). Email address :
himansN@gmail.com
(ix). Landline Telephone No. :
1373-223324
(x). Fax No. :
1373-223324
(xi). Mobile No. :
9411380476
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
Arvind
(ii). Middle Name:
Singh
(iii). Last Name:
Rawat
(iv). Gender:
Male
(v). Designation:
Junior Engineer
(vi). Address 1:
Construction Division, P.W.D. Purola
(vii). Address 2:
District : Uttarkashi. (Uttarakhand)
(viii). State:
Uttarakhand
(ix). District:
Uttarkashi
(x). Tehsil:
Puraula
(xi). Pin:
249185
(xii). Landmark:
NIL
(xiii). Email Address:
himansN@gmail.com
(xiv). Landline Telephone No.:
1373-223324
(xv). Fax No.:
1373223324
(xvi). Mobile No.:
8171516883
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Govind Pashu Vihar,Purola
0.224
0
Total
0.224
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Uttarkashi
0.224
0
Total
0.224
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Hadwari(Dhaula)
0.224
0
2
Sewa
0
0
3
Bari
0
0
Total
0.224
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Bridge
0.2239999992
0
Total
0.2239999992
0
C.
Maps of forest land proposed to be diverted
Division 1. : Govind Pashu Vihar,Purola
(i). Area of forest land proposed to be diverted(in ha.) :
0.224
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.224
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
0
(iii). Temporary Employment(Number of person-days):
16800
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Short narrative
2
GO Copy
3
Joint Inspection
4
Comperative Chart
5
Certificate of No alternative suitable land available
6
Land Schedule
7
Category wise land length
8
Bar chart
9
Compensatory afforestation
10
trees details
11
felling of oak trees
12
felling of trees certificate
13
Minimum trees certificate
14
Muck disposal
15
National park certificate
16
National park certificate
17
National park certificate
18
No voilation FC act 1980
19
NOC local gram sabhas
20
layout plan
21
component wise detail
22
Work has not been started certificate
23
Geologist Report
24
Task force report
25
Certificate for complying the Standerd condition
26
Certificate for complying the Geologist condition
27
No Historical monuments
28
No animal will be effected
29
Fuelwood kerosene or LPG
30
Benefited villages
31
NPV calculations
32
Undertaking of payment of NPV
33
Cost of forest land and lease rent
34
Certificate of lease period
35
Demarcation of land
36
Checklist
37
Attached Receiving Hard Copy of Proposal
38
EDS Objections removed
39
Geological Report
40
NWLB Meeting Approval Letter
41
Objection removed
42
EDS objection removed letter. 22 Sept 2021
43
(Point No. 01) EDS objection raised by DD dt. 27-10-2021
Print