FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/UK/Others/149743/2021
(ii). Name of Project for which Forest Land is required :
Trenching Ground SWM
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Processing and scientific disposal of solid waste for management of urban solid under N P satpuli for new construction segregation of garbage on the side land by scientific method separates solid waste into Liquid waste , dry waste , biodegradable waste etc Separation will be done by
(iv). State :
Uttarakhand
(v). Category of the Proposal :
Others
(vi). Shape of forest land proposed to be diverted :
Non Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
106.62
(viii). Area of forest land proposed for diversion(in ha.):
0.6
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
30
A-2.
Details of User Agency
(i). Name :
NAGAR PANCHAYAT SATPULI
(ii). Address1 :
nagar panchayat satpuli tehshil satpuli
(iii). Address2 :
NIL
(iv). State :
Uttarakhand
(v). District :
Pauri Garhwal
(vi). Pin :
246172
(vii). Landmark :
near gghs school
(viii). Email address :
npsatpuli@gmail.com
(ix). Landline Telephone No. :
1386-0000
(x). Fax No. :
1386-
(xi). Mobile No. :
941096403
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
Ratnesh
(ii). Middle Name:
NIL
(iii). Last Name:
Baunthiyal
(iv). Gender:
Male
(v). Designation:
data entry oparator
(vi). Address 1:
nagar panchayat satpuli tahshil satpuli
(vii). Address 2:
NIL
(viii). State:
Uttarakhand
(ix). District:
Pauri Garhwal
(x). Tehsil:
Satpuli
(xi). Pin:
246172
(xii). Landmark:
near gghs school
(xiii). Email Address:
npsatpuli@gmail.com
(xiv). Landline Telephone No.:
1386-000000
(xv). Fax No.:
NIL
(xvi). Mobile No.:
8700930453
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Soil Conservation,Lansdowne
0.6
0
Total
0.6
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Pauri Garhwal
0.6
0
Total
0.6
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
satpuli malli
0.6
0
Total
0.6
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
trenching ground
0.6
0
Total
0.6
0
C.
Maps of forest land proposed to be diverted
Division 1. : Soil Conservation,Lansdowne
(i). Area of forest land proposed to be diverted(in ha.) :
0.6
(ii). Nature of the Project:
Non Linear
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
0.6
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
0
(iii). Temporary Employment(Number of person-days):
400
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
Yes
(a). Status of the Environmental Clearance to the Project:
EC application yet to be submitted
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Agreement between Bhoomidhar and propartment
2
Assessment of Funds of NPV
3
auchitya pg 6
4
barchert
5
FRA
6
Certifficate of value annual lease rent of forest land
7
Certificate in lease period applicable for grant of forest land on lease renewal cases
8
Certificate in relation to the villeges Families Population to be benefited
9
certificate not to harm wildlife flor
10
Certificate of landholding ofthe landowners
11
Certificate of cancellation of alternate alignmen
12
Certificate of compliance with standard conditions
13
Certificate of non- commencement of work
14
certificate of non violation of forest protection ACT 1980
15
Certificate of not being a place of religious mythological historical importance
16
Certificate of planting a tree
17
Certificate of project site not being part of National Park Wildife Sanctuary and aerial distance of proposed site
18
Certificate of proper tree planting on both sides of the road
19
certificate of submission of NPV
20
Certificate to follow the Recommendations suggestion of the geologist
21
certificate to provide kerosene LPG tothe laborers working in the project
22
Certification of Felling of minimum trees
23
Compensation plantation site suitability Certificate
24
Debarment expense expenditure certificate
25
Description of excreta emissions in forest panchayat land
26
Details of trees to be actully cut from exisiting trees in the project area
27
Environmental clearance from the Government of India Ministry of environment and forests
28
fact seat
29
Geological Report
30
google map
31
In case the Trees is not affected in the proposed project by the user agency and the Divisional Forest Officer Paid certificate
32
Inspection report issued by the grologist of the proposed site is attached
33
Justiication
34
Land Schedule Reserved Forest Land
35
Land Schedule Van Panchayat Bhoomi
36
Layout plan in cases of Building constuction etc
37
Length - width description of the project
38
Mak dumping plan certificate
39
No Objection Certificate from the general assemblies of the villages affected
40
No Other alternative land availabal and minimum demand for forest land Certificate of being
41
NOC
42
pararup 11
43
Performa for comparison between identified alignments
44
prapup 27
45
prarup 1
46
prarup 2.1
47
prarup 3
48
prarup 4
49
prarup 7
50
prarup 8
51
prarup31
52
prarup31
53
prarup31
54
RC Panels of Van panchayat land to be repatriated For the Proposed Project Delimitation estimate
55
renewal of timeless leases
56
Site Inspection Report
57
Standard condititions certificate of acceptance
58
Task Force Certificate
59
topo sheat
60
61
upyuktta perman
62
toposheet
63
Geo-referenced map
64
dm order
65
doori parman part